General Info

Business Logo

Solicitations and notifications are free for this business.

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation

10 Park Plz Suite 6620, Boston, MA 02116-3933
(857) 283-6746

Please note starting in 2024, our bid day deadline will now be Thursday's @ 12:00PM

Effective July 1, 2024

There will be an increase to the SDP commitment requirements.
MBE and WBE  requirements will no longer be combined.
Requirements as followed: 

MBE: 6%
WBE: 10%
VOBE  3%


For our Supplier Diversity Partners : https://www.diversitycertification.mass.gov/BusinessDirectory/BusinessDirectorySearch.aspx

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
P24-3543-M6A
HVAC/R Maintenance Statewide This project consists of providing the DCR with continuous service, maintenance, replacement, and/or new installation of any HVAC/R related service equipment throughout Massachusetts. This contract is a 24hr/day, 7day/week, including holidays, weekends, off-hour work, and/or working through State emergencies. The estimated project: $4,200,000.00 The work is to be accomplished within 1,095 calendar days of a notice to proceed. Liquidated damages in the amount of $500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE participation plans that include solely MBE or solely WBE, or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for HVAC and must submit with the bid an update of their respective qualifications. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
05/09/2024 04:00 PM UTC
P24-3552-M3A
Arboricultural & Related Services, Including Parkways, Roadways, and other DCR managed Properties Statewide The project consists of tree care such as pruning, maintenance and removal as needed along DCR properties and parkways as assigned. The estimated project cost is $3,000,000. The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in TREE TRIMMING, MAINTENANCE AND REMOVAL to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
05/09/2024 04:00 PM UTC
P24-3559-C1A (4056-C)
Spectacle Island Ferry Landing Emergency Repairs Project Scope: Demolition and removal of failed dock elements and reconfiguration of ferry landing for temporary use. An optional Prebid conference and site walk for prospective bidders will be held on Monday, May 6, 2024. Transportation to spectacle Island will be provided by DCR. Attendees will meet at the DCR conference room located at 30 Shipyard Drive; Hingham, MA 02043 at 8:30AM. Pre-registration is required. To register and receive parking instruction, contact Mark Georgian via the following email address: Mark.N.Georgian@mass.gov. The work is to be accomplished within 14 calendar days of a notice to proceed. Liquidated damages in the amount of $1,200.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in MARINE CONSTRUCTION to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
05/09/2024 07:00 PM UTC
P24-3555-C1A
Castle Island Playground Renovation William J Day Boulevard, Boston, Mass 02127 This project consists of renovation of the playground area, installing new play equipment and poured in -place surfacing, replacing cement walkways, new concrete walkways at worn foot paths, minor grading, and planting of native vegetation including beach grass. These improvements will provide improved accessibility in compliance with the Americans with Disabilities Act (ADA). The estimated project cost is $ 600,000.00 The work is to be accomplished within 150 calendar days of a notice to proceed. Liquidated damages in the amount of $500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Recreational Facilities to bid on the above project. An ward will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
05/16/2024 04:00 PM UTC
P24-3551-M2A
Bridge Maintenance and Repairs- Statewide This project consists of undertaking scheduled and emergency bridge repairs to bridges statewide. The intention of this Contract is for most work order assignments to be scheduled to provide some flexibility in providing these services. However, there is the possibility that an emergency may materialize that needs immediate response, and the Contractor shall be required to mobilize and respond to the work order within 4 hours of notification. Some work assignments may be required to be performed at nighttime to minimize the impact to the traveling public. Work order assignments will typically consist of furnishing equipment, materials, engineering, & labor to undertake bridge repairs and maintenance, including furnishing traffic management set-ups to support worksite access and coordinating Traffic Police Details. Work shall include, but is not limited to: steel repairs; concrete superstructure and substructure repairs: replacing excavated, spalled, delaminated, or deteriorated concrete; replacing missing or deteriorated reinforcing steel, repairing concrete cracks, coring and grouting dowels; bridge railings repairs; replacing bridge railing anchor bolts; bridge drainage cleaning and repairs; application of elastomeric protective coatings; application of concrete deck antiskid waterproofing; replacement of caulking; repair and/or removal and replacement of timber decking, curbing and bridge railings; repairs to stone masonry abutments and walls; cleaning of bridge decks, beam seats and bearings. The estimated project cost is $ 4,500,000.00 The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Bridge Construction to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE. Plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
05/16/2024 04:00 PM UTC
P24-3546-C1A
Camp Marshall Shotgun Remediation Camp Marshall Spencer, MA 01562 The estimated project cost is $ 290,640.00 The work is to be accomplished within 90 calendar days of a notice to proceed. Liquidated damages in the amount of $1000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in _Hazardous Waste Remediation & Transportation to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
05/23/2024 04:00 PM UTC
P24-3543-C1A
Georges Island Pavilion- Rebid Boston, MA This project consists of site preparation, new slab and footings, storage and transportation of materials, construction of new pavilion and connections to existing pathways at Georges Island (within Boston Harbor Islands State Park). The pavilion materials will be provided by DCR. The estimated project cost: $850,000 The work is to be accomplished within 150 calendar days of a notice to proceed. Liquidated damages in the amount of $ 1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) General Construction or Modular Construction and must submit with the bid an update of their respective qualifications. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
05/23/2024 04:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
P22-3478-C3A
General Bid : Quabbin Administration Building Window Abatement and Replacement This project consists of the removal of asbestos and lead based paint containing materials at window frames and openings, installation of new thermally broken aluminum windows, and masonry repairs to deteriorated lintels and brick masonry within the limits of the window openings and as indicated in the drawings. The estimated project construction cost is $: 1,732,753.00 The work is to be accomplished within 245 calendar days of a notice to proceed. Liquidated damages in the amount of $ 500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders Subs and Generals for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM). General bidders must be certified in Historical Building Restoration. All must submit with the bid an update of their respective qualifications. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
04/25/2024 04:00 PM UTC
P17-3103-C1A
General Bid : Upper Lock Building Renovations This project consists of replacement of existing roof, including but not limited to a new slate roof, new roof trim and flashing, new soffits, new gutters and down spouts, repair / restoration of original wood eave brackets, and repair of existing steal roof structure. Exterior work also included repointing of existing brick and granite walls 100%, and various repairs as indicated in the drawings. The estimated project Base Bid cost is $1,350,000 . The work is to be accomplished within 180 calendar days of a notice to proceed. Liquidated damages in the amount of $2,000. per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) The General Bidder shall have DCAMM certification in the category of Historic Building Restoration and must submit with the bid an update of their respective qualifications. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
04/18/2024 04:00 PM UTC
P24-3551-M1A
Installation of Reflectorized Pavement Markings This project consists of furnishing the labor, materials, transportation, traffic controls, and equipment necessary for the installation of reflectorized pavement markings and other relevant work throughout DCR properties. This operation will call for two (2) or more truck mounted striping units of painting a minimum of twelve miles of pavement markings (paint of thermoplastic) a day. The estimated project cost is $ 1,500,000.00 The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $100.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in PAVEMENT MARKINGS to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
04/18/2024 04:00 PM UTC
P24-3543-C1A
Georges Island Pavilion Boston Harbor Islands Work consists of site preparation, new slab and footings, transportation of materials, construction of new pavilion and connections to existing pathways at Georges Island (within Boston Harbor Islands State Park). The contract also includes removal of closed clivus trailhead units (3) and the installation of new remote bathroom to support pavilion use. The pavilion materials will be provided by DCR. The estimated project: $425,000 The work is to be accomplished within 90 calendar days of a notice to proceed. Liquidated damages in the amount of $ 1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) General Construction or Modular Construction and must submit with the bid an update of their respective qualifications. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
04/11/2024 04:00 PM UTC
P22-3478-C3A
Sub-BID : Masonry, Waterproofing, Damp-proofing, and Caulking, Metal Windows, Painting Quabbin Administration Building Window Abatement and Replacement This project consists of the removal of asbestos and lead based paint containing materials at window frames and openings, installation of new thermally broken aluminum windows, and masonry repairs to deteriorated lintels and brick masonry within the limits of the window openings and as indicated in the drawings. The estimated project construction cost is $: 1,732,753.00 The work is to be accomplished within 245 calendar days of a notice to proceed. Liquidated damages in the amount of $ 500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders Subs and Generals for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM). General bidders must be certified in Historical Building Restoration. All must submit with the bid an update of their respective qualifications. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
04/11/2024 04:00 PM UTC
P24-3556-C7A
DCR Rink Roofs and Solar Project This project consists of installing photovoltaic panels on one recreational facility roof and two rink roofs. The systems include the panels, raceways, conductors, invertors, and connection to the existing buildings electrical equipment. A new roof is included at the Bajko Rink that must be installed prior to installation of the solar panels. Work shall include providing DCR with all assistance necessary in registering the roof photovoltaic systems with the required State Agencies and Utilities to bring the systems online and make fully functional. The estimated project: $3,600,000 Alternate 1 Installation of additional solar panels at the Bajko Rink to cover the roof in its entirety is available as an Alternate as part of the Bid. The Estimate amount for the Alternate is $750,000. It is at the discretion of DCR to exercise the Alternate as part of the work. The work is to be accomplished within 1,095 calendar days of a notice to proceed. Liquidated damages in the amount of $ 1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) Roofing Category and must submit with the bid an update of their respective qualifications. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
03/28/2024 04:00 PM UTC
P24-3552-M4A
Servicing Traffic Signals and Control Systems Counties: Bristol, Berkshire, Barnstable, Middlesex, Essex, Franklin, Hampden, Hampshire Norfolk, Dukes, Plymouth, Suffolk, Worcester, and Nantucket This project consists of providing service to maintain traffic signal and control systems (DCR Statewide) in good working order, including scheduled preventive maintenance, emergency repairs and modifications. Subject to appropriations for expenditures as noted in Part IV, Notice of Special Conditions of the Contract (Paragraph A & B). The estimated project cost is $2,400,000.00 The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $1000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Traffic Signals to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
03/28/2024 04:00 PM UTC
P17-3103-C1A
Sub Bids: Masonry Work, Roofing & Flashing, and Painting: Upper Lock Building Renovations This project consists of the replacement of existing roof, including but not limited to a new slate roof, new roof trim and flashing, new soffits, new gutters and down spouts, repair / restoration of original wood eave brackets, and repair of existing steal roof structure. Exterior work also included repointing of existing brick and granite walls 100%, and various repairs as indicated in the drawings. The estimated project Base Bid cost is $1,350,000 . The work is to be accomplished within 180 calendar days of a notice to proceed. Liquidated damages in the amount of $2,000. per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on. The General Bidder shall have DCAMM certification in the category of Historic Building Restoration and all must submit with the bid an update of their respective qualifications. Brian M. Arrigo Massachusetts Department of Conservation and Recreation
03/28/2024 04:00 PM UTC
P22-3452-C1A
Trail Crossing Phase 1 Ashland State Park, Clarksburg State Park, Wendell State Forest Counties : Berkshire, Franklin, Middlesex. This project consists of the installation of three new trail crossing structures within Massachusetts Department of Conservation and Recreation (DCR) State Park lands. All work is located within three Massachusetts counties; Berkshire, Franklin, and Middlesex and two DCR regional work areas; Western and Central regions. The project locations are in Ashland State Park, Clarksburg State Park, and Wendell State Forest. The project located in Clarksburg State Park is the top priority for the agency. Work at this location must be completed first. The estimated project cost is $940,972.39 The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in BRIDGE CONSTRUCTION to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE, or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
03/21/2024 04:00 PM UTC
P24-3569-C1A
Mass Central Rail Trail Waltham-Weston, Phase 1 Waltham, MA and Weston, MA This project consists of the rehabilitation of an existing railroad truss bridge over the MBTA Fitchburg Commuter Rail tracks and the construction of a shared use path to Jones Road in Waltham. The estimated project cost is $ 2,548,251.30. The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Highway-Bike Paths to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE, or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
03/14/2024 04:00 PM UTC
1 - 10 of 202 Solicitations