General Info

Business Logo

Solicitations and notifications are free for this business.

Massachusetts Division of Capital Asset Management and Maintenance (DCAMM)

One Ashburton Place 15th Floor, Boston, MA 02108
(617) 727-4003

The Division of Capital Asset Management and Maintenance (DCAMM), an agency within the Executive Office for Administration and Finance (A&F) is responsible for capital planning, major public building construction, facilities management, and real estate services for the Commonwealth of Massachusetts. The agency was created by the legislature in 1980 to promote quality and integrity in the management and construction of the Commonwealth’s capital facilities and real estate assets.

Standard Documents

Name * Description
DCAMM E-Bid Room Information (27.3 KB)
DCAMM E-Bid Room Information, Verification, Registration and Security Requirements
1 Document

Upcoming Solicitations

Number Deadline
BSC2201 Resilient Floors Re Bid
Burnell Hall Renovation, Bridgewater State University, Bridgewater, MA, Trade Bids for the following Trade Category: Resilient Floors (Re-Bid).
06/16/2025 04:00 PM UTC
OSD2201
OVM Vehicle Staging Site, Northborough, MA. This Project is to develop the parcel into a fleet logistics management site, including cut and fill, grading, base layers and asphalt, curbing and marking. Work will also include electrical transformer, panels, electric vehicle chargers and site lighting. A security fence and gate hardware is required. The Project must be completed in phases with continual operation by the user agency. This Project bid in accordance with M.G.L. Chapter 30 Section 39M.
06/17/2025 06:00 PM UTC
NEC2301 Trade RFB
NEC - General Services (B) & Science (E) Infrastructure Renovation, Northern Essex Community College, Haverhill, MA. Trade Bids for the following Trade Categories: Masonry; Miscellaneous & Ornamental Iron; Waterproofing, Dampproofing & Caulking; Roofing & Flashing; Acoustical Tile; Resilient Floors; Painting; Plumbing; HVAC; Electrical.
06/24/2025 04:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
MIL1602 FC1
Hudson Armory Roof Replacement, Hudson, MA. This project includes the replacement of "barrel shaped" roof at the Hudson Armory and associated gutters.
07/26/2017 06:00 PM UTC
HCC1502 HC1 - Public Posting
New Center for Life Sciences - Holyoke Community College, Marieb Hall, Holyoke, MA. This project includes various renovations to the Marieb Hall in order to provide life science program spaces.
07/06/2017 06:00 PM UTC
DPH1402 HC1
Lemuel Shattuck Hospital – Personnel Building Demolition, Jamaica Plain, MA. This project includes abatement, demolition and backfilling of an eleven-story brick and concrete building. Work will be conducted within an active parking lot of an occupied hospital. The Category of Work is Demolition.
07/05/2017 06:00 PM UTC
DCP1714 FC1 - Public Posting
Satellite Boiler Installation, DCAMM Facility, 220 Old Common Road, Lancaster, MA. Scope: Install boiler and one standby generator in the RFK School Building.
06/23/2017 06:00 PM UTC
RCC1402 HC1 - Public Posting
Roxbury Community College, Reggie Lewis Track Upgrades - Phase 2, Roxbury, MA. This project includes renovation work at the Reggie Lewis Center to include front doors replacement, mechanical, code, accessibility upgrades, and other miscellaneous improvements.
06/22/2017 06:00 PM UTC
MBC1601 HC1 - Public Posting
Mass. Bay Community College, Carey Building HVAC Upgrades, Wellesley, MA. This project includes installation of new air conditioning for the Carey Building's 3rd and 4th floors.
06/20/2017 06:00 PM UTC
CHE1501 HC1 - Public Posting
Chelsea Soldiers' Home - Envelope Repair, Chelsea, MA. This project includes masonry repair and roofing at eight buildings.
06/16/2017 06:00 PM UTC
DPH1641 DC1
Request for Qualifications for Construction Management at Risk Services, Second Request - Revised Scope, Mass. Department of Public Health, Jamaica Plain Campus, Tower Building Phased Renovation and Biologics Building Demolition, Boston, MA. The project involves a phased renovation of an approximately 208,000 GSF, eight-story plus basement building that contains laboratory, administrative and research space. The building will remain occupied throughout construction and remain 24/7/365 operational. The project also includes the demolition of the Biologics Building, which sits adjacent to the Tower Building and is connected to it via a bridge. This is a two-story plus basement building of approximately 34,000 GSF.
05/31/2017 06:00 PM UTC
DCP1514 HC1 - Public Posting
Bryan Building - Mothball and Utility Separation, Worcester, MA. Bryan Building will be warm mothballed. This entails the separation of utilities, boarding up windows, abatement of ACM, removal of hazardous materials, removal of furniture, improvements to HVAC system, demolition of connector to adjacent building, and installation of boiler. Utility separation work includes coordination with NGRID, trenching, new ductbanks, and site restoration.
05/15/2017 06:00 PM UTC
SDW1501 DC2 - Public Posting
New Intake Site Preparation and Roadway, Worcester County Jail & House of Corrections, West Boylston, MA. This project includes installation of a new security fencing system and removal of the old fencing, new gates, road work to expand the existing access road to the site, rework of the facilities main pedestrian pathway and site preparation for the New Intake and Medical building to be completed under a subsequent contract. This Project bid in accordance with M.G.L. Chapter 30 Section 39M.
05/10/2017 06:00 PM UTC
341 - 350 of 387 Solicitations
1 2 31 32 33 35 37 38 39