General Info

Business Logo

Solicitations and notifications are free for this business.

Massachusetts Division of Capital Asset Management and Maintenance (DCAMM)

One Ashburton Place 15th Floor, Boston, MA 02108
(617) 727-4003

The Division of Capital Asset Management and Maintenance (DCAMM), an agency within the Executive Office for Administration and Finance (A&F) is responsible for capital planning, major public building construction, facilities management, and real estate services for the Commonwealth of Massachusetts. The agency was created by the legislature in 1980 to promote quality and integrity in the management and construction of the Commonwealth’s capital facilities and real estate assets.

Standard Documents

Name * Description
DCAMM E-Bid Room Information (27.3 KB)
DCAMM E-Bid Room Information, Verification, Registration and Security Requirements
1 Document

Upcoming Solicitations

Number Deadline
SSA2202 Trade RFQ
Request for Qualifications for Eleven (11) Trade Contractor Packages: Miscellaneous & Ornamental Iron ($565,000); Waterproofing, Dampproofing & Caulking ($475,000); Glass & Glazing ($293,000); Tile ($156,000); Acoustical Tile ($419,000); Resilient Floors ($758,000); Painting ($285,000); Fire Protection Sprinkler System ($829,000); Plumbing ($4,096,000); HVAC ($8,258,000); Electrical ($5,824,000), for Salem State University - SSU BOLD - Modernization of Science Labs and Health Sciences, Salem, MA. This Project is for a new wing addition to the Meier Hall Science Center and the complete renovation of the Horace Mann Building. The Meier Hall Addition contains seven new teaching labs for Biology, Chemistry and Geoscience. The Construction Manager is Gilbane Building Company.
09/22/2025 04:00 PM UTC
MMP 35
Mechanical and Plumbing Preventive Maintenance Contract for Springfield State Office Building, Springfield, MA. This Project is a Preventive Maintenance Service Contract to include testing, inspection, preventative maintenance (including all PM required parts and materials), repairs, requested emergency services and incidental extra services for all mechanical equipment and plumbing equipment. This Project bid in accordance with M.G.L. Chapter 30 Section 39M.
09/22/2025 06:00 PM UTC
BSB2408 Sub Bids
BSB - State House Coal Pocket Data Center, Boston, MA. This Project is for the renovation of the existing State House Coal Pocket Data Center mechanical system, with new fan coil units fed from existing data center chiller system, with modifications to piping of the existing system. The data center and associated mechanical room are approximately 3200 SF. This Project includes the following Filed Sub-Bid: Electrical. The Category of Work is HVAC or Mechanical Systems. Please see the SSI Attachment: Security Acknowledgment Form on the main Project page for BSB2408. This Form MUST be completed and submitted to DCAMM’s Bid Room at bidroom.dcamm@mass.gov for access to bid documents.
10/01/2025 04:00 PM UTC
BSB2408
BSB - State House Coal Pocket Data Center, Boston, MA. This Project is for the renovation of the existing State House Coal Pocket Data Center mechanical system, with new fan coil units fed from existing data center chiller system, with modifications to piping of the existing system. The data center and associated mechanical room are approximately 3200 SF. This Project includes the following Filed Sub-Bid: Electrical. The Category of Work is HVAC or Mechanical Systems. Please see the SSI Attachment: Security Acknowledgment Form. This Form MUST be completed and submitted to DCAMM’s Bid Room at bidroom.dcamm@mass.gov for access to bid documents.
10/15/2025 06:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
DMH1301 DC1
Exterior Envelope Repair, Elevator and Generator Replacement, Solomon Carter Fuller Mental Health Facility, Boston, MA. Scope: Concrete exterior envelope repairs, existing window repairs and exterior sealant scope throughout; replacement (in phases) of the existing elevators with new elevators; replacement of the existing emergency generator with a new emergency generator.
04/20/2017 06:00 PM UTC
STC1701 FC1
Springfield Technical Community College, Building 13 and 17 Generator Replacement, Springfield, MA. Scope: Demolition of the existing generator and the gas main feeding it, installation of a new diesel generator with exhaust stack rising up from the building, creation of a new emergency electrical service entrance in buildings 13 and 17 and creation of new electrical shafts and electrical rooms in buildings 13 and 17.
04/14/2017 06:00 PM UTC
TRC0105 DC1
Request for Qualifications for Trade Contractors, Lowell Justice Center, Lowell, MA, for the following trades: Miscellaneous and Ornamental Iron (ECC $2,399,253); Waterproofing, Dampproofing and Caulking (ECC $134,000); Glass and Glazing (ECC $974,990); Lathing and Plastering (ECC $55,544); Tile (ECC $3,209,623); Acoustical Tile (ECC $2,630,885); Resilient Floors (ECC $428,174); Painting (ECC $885,144). SCOPE: The project consists of a new 266,523 GSF seven-story high rise structure (plus basement & mechanical penthouse) and associated site development of a 3.26 acre site.
04/13/2017 04:00 PM UTC
BSB1503 HC1
Request for Proposals for State House - Senate Chamber Renovations, Boston, MA
04/12/2017 06:00 PM UTC
DCP1532 FC1
Hurley Building Bathroom Renovations, Boston, MA. The project consists of the complete renovation of four (4) toilet rooms on 2 floors of the Charles F. Hurley Building. The toilet rooms to be renovated are the existing Men's and Women's rooms located on the 2nd and 3rd floors.
03/09/2017 07:00 PM UTC
TRC1214 HC1
TRC – Various Improvements/Renovations, Haverhill District Court, Haverhill, MA.
02/15/2017 07:00 PM UTC
HCC0801 DC2
2nd Request for Qualifications for Seven (7) Trade Packages: Waterproofing, Dampproofing & Caulking; Roofing & Flashing; Tile; Acoustical Tile; Resilient Floors; Elevators; HVAC. Renovations to the Campus Center, Building G, Holyoke Community College, Holyoke, MA.
02/15/2017 05:00 PM UTC
POL1303 DC1,
RFQ for Construction Management Services, Massachusetts State Police Lower Basin Barracks Modernization and Expansion, Boston, MA. The project involves building renovation (14,000 sq ft), main entrance addition ( 4,000 sq ft) and demolition of adjacent existing garage.
02/02/2017 07:00 PM UTC
HSD1502 FC1
Emergency Generator & Rooftop HVAC Units, Hampshire County Jail & House of Correction, Northampton, MA.
01/09/2017 07:00 PM UTC
VET1402 FC1
Deferred Maintenance - MEP Systems, Mass Veterans' Memorial Cemetery, Agawam, MA.
01/06/2017 07:00 PM UTC