General Info

Business Logo

City of Delaware, Ohio

1 S Sandusky St, Delaware, OH 43015-3000
(740) 203-1713

Please see Notice to Bidders for each solicitation to find contact information specific to a project.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-03 OPWC Paving Program
The Base Bid includes the resurfacing of Pittsburg Drive, Johnson Drive, Henderson Court, and Elizabeth Street and the full reconstruction of Stover Drive. The bid also includes pavement repairs, restriping, and curb ramps. Add Alternate #1 includes construction of a compacted aggregate shoulder. Notice to Proceed is expected to be issued by August 3, 2026. All work must be completed by November 2, 2026. Two-way traffic must be maintained throughout the entire project except for an allowable one-week full closure of Elizabeth Street.
07/16/2026 05:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
08-18 DEL-23-6.45 US 23 and Glenn Parkway Signal Project
Install a Signal at the Intersection of US 23 and Glenn Parkway.
10/26/2018 03:00 PM UTC
09-18
Chemicals for the Water and Waste Water Treatment Plants
10/25/2018 03:00 PM UTC
04-18 DEL-US23-11.43 to 12.68 Micro-surfacing US 23 (Rebid)
This project consists of pavement repairs and micro-surfacing a total of 1.25 miles of US23 within the City of Delaware from SLM 11.43 to 12.68 All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at https://odot.formstack.com/forms/dbe.
07/03/2018 03:00 PM UTC
Side Load Refuse Vehicle
Side Load Refuse Vehicle (20 Yard)
06/26/2018 02:00 PM UTC
03-18 2018 Pavement Maintenance Program
The 2018 local resurfacing program will consist of reconstruction of Cambridge Road beginning at Lexington Boulevard to 140' north of Bridgeport Way. The alternate bid will consist of a fiber cape seal being applied to Blymer Street. - City of Delaware
06/22/2018 03:00 PM UTC
06-18 2018 Pavement Maintenance Program (OPWC)
The 2018 OPWC resurfacing program will consist of the resurfacing of Winter Street from Franklin Street to Central Avenue, resurfacing of Heffner Street from Euclid Avenue to Sandusky Street and Bridge Maintenance on the Winter Street Bridge over the Olentangy River. - City of Delaware
06/22/2018 02:00 PM UTC
04-18 DEL-US23-11.43 to 12.68 Micro-surfacing US 23
This project consists of pavement repairs and micro-surfacing a total of 1.25 miles of US23 within the City of Delaware from SLM 11.43 to 12.68
05/31/2018 03:00 PM UTC
07-18
Rear Loading Refuse Collection Truck Body Estimated Cost $65,000
05/21/2018 02:00 PM UTC
05-18
Asphalt, Concrete and Stone Materials Contract
05/04/2018 03:00 PM UTC
02-18 West Central Bikeway
This project is for a proposed pedestrian path along SR 37 and pedestrian bridge over Delaware Run. The Project will start at the Westfield Hill Shopping Center at the corner of Houk Rd. and W. Central Ave.(SR37) and terminate at the western City limits at the Trotters Landing Apartment complex.
04/13/2018 03:15 PM UTC
111 - 120 of 136 Solicitations
1 2 6 7 8 9 10 12 14