KTA 8272
Construction of rigid frame box bridge at MM 21.41 and 21.65 in Sumner County.
12/08/2026 08:00 PM UTC
KTA 7910
Removal of existing bridge and the construction of two twin haunched slab span bridges at MM 34.579 over the Cowskin Creek.
12/08/2026 08:00 PM UTC
KTA 8305
Removal of existing bridge and the construction of two twin haunched slab span bridges at MM 27.492 over K-55.
12/08/2026 08:00 PM UTC
KTA 8361
This project on KTA (I-35) in Sumner County is for levee repairs at MM 15 (Slate Creek).
12/08/2026 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
KTA 8289
This project on KTA (I-335) in Shawnee County, MM 183.5 to MM 194.5, is for pavement patching, the application of Ultrathin Bonded Asphalt Surface (UBAS) (Type A) on the eastbound and westbound mainline lanes, and 2” cold mill - 2” inlay on the shoulders. Milling is required for patching, in transition areas, and as shown on the plans
11/10/2026 08:00 PM UTC
KTA 8189
This project on I-335 (KTA) in Osage and Shawnee County consists of painting 5 bridges, 3 overheads and 1 set of mainline bridges.
11/10/2026 08:00 PM UTC
KTA 8297
The purpose of this project is to provide an UBAS overlay of I-35, including interchanges, from MM 112 to MM 132 in Lyon County. Additional work to patch portions of I-35 mainline, mill and inlay section of the outside shoulder is also included in this project. Work includes ultrathin bonded asphalt surfacing (UBAS), commercial grade asphalt patching, commercial grade asphalt surfacing, sealing and all other work shown in the plans.
11/10/2026 08:00 PM UTC
KTA 8171
This project on KTA (I-70) in Douglas and Leavenworth Counties consists of grading, bridges (10 mainline and 2 overhead), and surfacing to construct a 6-lane roadway for approximately 8.4 miles on mainline KTA (I-70).
10/13/2026 07:00 PM UTC
KTA 8187
This work will include utility relocation from MM 205-213 on I-70.
08/11/2026 07:00 PM UTC
KTA 8171 Preliminary
This is for the preliminary information for KTA's I70 Widening project. All information is preliminary and subject to change. KTA will advertise the project for letting August 3, 2026.
07/31/2026 10:00 PM UTC
KTA 8182
This work will include installing various sized RCP across the Turnpike via trenchless construction methods. This project will also include installing culverts using traditional methods on non KTA roads, constructing headwalls, grading, and extending culvers.
06/15/2026 07:00 PM UTC
KTA 8261
The purpose of this project is to repair structural steel members at Br. 63.457 NB & SB on I-35 in Butler County and Br. 129.180 SB on I-35 in Lyon County. Work includes bridge girder repair, bridge stiffener repair and all other work shown in the plans.
03/17/2026 07:00 PM UTC
KTA 8161
The purpose of this project is to replace Br. 56.727 (Prairie Creek) on I-35 in Butler County. Work includes bridge rehabilitation, grading and surfacing, and all other work shown in the plans.
02/17/2026 08:00 PM UTC
KTA 8259
This project on KTA (I-335) and (I-470) in Shawnee County, MM 167.8 to MM 183.8, is for pavement patching, the application of Ultrathin Bonded Asphalt Surface (UBAS) (Type A) on the northbound and southbound mainline lanes, and the application of Haydite chip seal on the shoulders. This project includes the South Topeka Interchange at MM 177 and MM 182. Milling is required for patching, in transition areas, and as shown on the plans.