General Info

Business Logo

Kansas Turnpike Authority

9401 E Kellogg Dr, Wichita, KS 67207-1804
(316) 682-4537


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
KTA 8272
Construction of rigid frame box bridge at MM 21.41 and 21.65 in Sumner County.
12/08/2026 08:00 PM UTC
KTA 7910
Removal of existing bridge and the construction of two twin haunched slab span bridges at MM 34.579 over the Cowskin Creek.
12/08/2026 08:00 PM UTC
KTA 8305
Removal of existing bridge and the construction of two twin haunched slab span bridges at MM 27.492 over K-55.
12/08/2026 08:00 PM UTC
KTA 8361
This project on KTA (I-35) in Sumner County is for levee repairs at MM 15 (Slate Creek).
12/08/2026 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
KTA #7194
This work will include re-decking and raising bridges 99.960 NB and 99.960 SB and overlaying bridges 94.00 NB and 94.00 SB.
12/12/2018 08:00 PM UTC
KTA #7290
This work will include the Southern Terminal Plaza at KTA/I-35 MM 16.6 to convert to Open Road Tolling (ORT). Reconstruction of bridge numbers 16.158 (E. 40th Street S.) and. 17.158 (E. 30th Street S.) bridges crossing I-35 and all other work shown in the plans.
08/15/2018 07:00 PM UTC
KTA #7336
Painting Structural Steel for the following Bridges: Br. 20.172 (23), Br. 26.492 (30), Br. 28.507 (32), Br. 29.524 (34), Br. 35.405 (40), Br. 38.414 (43) , Br. 59.247 (87), and Br. 59.997 (88).
06/19/2018 07:00 PM UTC
KTA #7107
This project on KTA (I-35) in Sedgwick County is for improvement of the acceleration and deceleration ramps at Plaza 42 (South Wichita). This project includes grading, surfacing, signing and all other work shown in the plans.
04/17/2018 07:00 PM UTC
KTA #7169
Construction of Reinforced Concrete Box Culvert at KTA/I-335 MM 132.20. Structures are designated as follows: Br. No. KTA/I-335-056-132.20 (153) – Double 12'x8'x220'-2" and extend existing Double 12'x8' RCB.
03/21/2018 07:00 PM UTC
KTA #7326
This work will include Milling and Superpave Overlay of driving lanes from MM 135.8 to MM 167.8, Milling and Overlay of Admire Interchange at MM 147, Shoulder Seal of the inside and outside shoulders in both directions and placement of Pavement Edge Wedge (Rock) at outside shoulders, both directions as shown in the plans.
03/20/2018 07:00 PM UTC
KTA #7081
Construction of rigid frame box bridges at MM 4.40, 6.20 and geometric improvement at MM 4.0 interchange in Sumner County. Structures are designated as follows: Br. No. 4.40 – Single 14'x10'x113'-0” and extend existing 2-14’x10’ RFB. Br. No. 6.20 – Single 14'x10'x114'-0” and extend existing 2-14'x10' RFB.
03/13/2018 07:00 PM UTC
KTA #7167
Re-deck and widen mainline bridges at Turnpike mile marker 130.360. Remove mainline bridges at Turnpike mile marker 130.120 Shawnee County, Kansas.
02/13/2018 08:00 PM UTC
KTA #7137
Re-deck and Raise Br. No’s. 168.927 (85th St. over I-335) and 169.627 (93rd St. over I-335).
12/12/2017 08:00 PM UTC
KTA #7129
This project on KTA (I-35) in Chase County is for improvement of the acceleration and deceleration ramps at the Matfield Green service area at MM 97 and mill and Superpave overlay from MM 96.3 to MM 112.3, including portions of the Matfield Green service area parking lot. Also two median crossovers at MM 93-95 will be constructed for future bridge rehabilitation. This project includes grading, surfacing, milling, shoulder seal and all other work shown in the plans.
12/12/2017 08:00 PM UTC
91 - 100 of 111 Solicitations
1 2 3 4 5 6 7 8 10 12