Kansas Turnpike Authority
9401 E Kellogg Dr, Wichita, KS 67207-1804
(316) 682-4537
9401 E Kellogg Dr, Wichita, KS 67207-1804
(316) 682-4537
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
KTA 8171
This project on KTA (I-70) in Douglas and Leavenworth Counties consists of grading, bridges (10 mainline and 2 overhead), and surfacing to construct a 6-lane roadway for approximately 8.4 miles on mainline KTA (I-70).
| 10/13/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
KTA #8072
This project on KTA (I-35) in Chase County is for the reconstruction of the Cattle Pens at MM 111 using pipe fence and related materials as shown in the Contract documents.
| 10/06/2023 07:00 PM UTC |
|
KTA #8071
Provide all materials, equipment and labor necessary to fabricate and deliver structural steel, bearing devices, headed stud anchors, fasteners and all other structural steel items shown on the plans.
| 09/19/2023 07:00 PM UTC |
|
KTA #8044
This work will include waterline improvements.
| 09/19/2023 07:00 PM UTC |
|
KTA #7531
This work will include raise and overlay Bridge No. 36.509.
| 09/19/2023 07:00 PM UTC |
|
KTA #7920
This work will include ramp improvements at MM 1.6 NB (Port of Entry.)
| 07/18/2023 07:00 PM UTC |
|
KTA #7730
This work will include drainage improvements at MM 15 (Slate Creek).
| 05/16/2023 07:00 PM UTC |
|
KTA #7881
This is the Cashless Tolling Signing project. The purpose of the project is to create and install signing related to the 2024 Cashless Tolling transition. The project runs the length of the Turnpike from MM 00 in Sumner County to MM 236 in Wyandotte County. This project includes signing, posts, footings, truss mounted signs, and all other work shown in the plans.
| 02/16/2023 08:00 PM UTC |
|
KTA #7909
The primary operations to be undertaken with this project consist of Earthwork for drainage detention at MM 214.2.
| 02/14/2023 08:00 PM UTC |
|
KTA #7936
This work will include constructing new haunched slab mainline bridges 141.6 NB and 141.6 SB in place of an existing 7’x7’ RCB, Full depth asphalt driving lane replacement, Guardrail installations, Existing RCB extensions left and right, and Jacked pipe
| 01/18/2023 08:00 PM UTC |
|
KTA #7917
This project is for safety improvements consisting of guardrail upgrades, guardrail removals and bridge pier protection at multiple locations along the turnpike in Sumner and Sedgwick Counties from MM 0-42.
| 01/18/2023 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.