General Info

Business Logo

Kansas Turnpike Authority

9401 E Kellogg Dr, Wichita, KS 67207-1804
(316) 682-4537


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
KTA 8171
This project on KTA (I-70) in Douglas and Leavenworth Counties consists of grading, bridges (10 mainline and 2 overhead), and surfacing to construct a 6-lane roadway for approximately 8.4 miles on mainline KTA (I-70).
10/13/2026 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
KTA #7800
This work will include demolition of bridge 55.507 (Main Street) over I-35 (KTA) and termination of Main Street in the City of Andover.
02/15/2022 08:00 PM UTC
KTA #7820
This work will include mill and Superpave overlay from MM 0.0 to MM 13.0. Mill and Inlay, as shown in the plans, Port of Entry (MM 2 NB), US-166 Interchange (MM 4) and Belle Plaine service area (MM 26).
12/14/2021 08:00 PM UTC
KTA #7802
This work will include the civil construction work for cashless tolling sites on I-35 (KTA) in Butler and Lyon Counties at MM 56.40, MM 60.62, MM 68.07, MM 73.45, MM 86.57, MM 95.80 & MM 122.87 and repair and extension of a single rigid frame box at MM 96.33.
12/14/2021 08:00 PM UTC
KTA #7888
This project is for repair and extension of Single 12'x13'x101'-0” rigid frame box at MM 96.33 in Butler County.
11/16/2021 08:00 PM UTC
KTA #7887
Fabrication and delivery of sixteen (16) Overhead Sign Structures (Aluminum) for Cashless Toll Zones (MM’s 131.1, 146, 150.6, 179.3, 206.6 & 210.1). The structures will be installed under four separate contracts that involve construction of mainline toll zones as a part of the Kansas Turnpike Authority’s transition to cashless tolling.
10/27/2021 03:00 PM UTC
KTA #7886
Fabrication and delivery of twelve (12) Overhead Sign Structures (Aluminum) for Cashless Toll Zones (MM’s 187.4, 191.2, 200.6, & 202.4). The structures will be installed under four separate contracts that involve construction of mainline toll zones as a part of the Kansas Turnpike Authority’s transition to cashless tolling.
10/27/2021 03:00 PM UTC
KTA #7885
Fabrication and delivery of twelve (12) Overhead Sign Structures (Aluminum) for Cashless Toll Zones (MM’s 43.1, 86.6, 95.8, & 122.9). The structures will be installed under four separate contracts that involve construction of mainline toll zones as a part of the Kansas Turnpike Authority’s transition to cashless tolling.
10/27/2021 03:00 PM UTC
KTA #7884
Fabrication and delivery of twelve (12) Overhead Sign Structures (Aluminum) for Cashless Toll Zones (MM’s 56.4, 60.6, 68.1, & 73.4). The structures will be installed under four separate contracts that involve construction of mainline toll zones as a part of the Kansas Turnpike Authority’s transition to cashless tolling.
10/27/2021 03:00 PM UTC
KTA #7876
Painting Structural Steel for the following Bridges: Br. 86.637, Br. 99.590, Br. 101.730, Br. 102.260, Br. 122.590, Br. 148.590, Br. 158.963, and Br. 169.627.
10/20/2021 07:00 PM UTC
KTA #7742
This work will include re-decking and widening of northbound and southbound mainline bridges at MM 41.437, 42.445 & 42.850 as well as construction of mainline cashless toll facilities at MM 43.080.
10/19/2021 07:00 PM UTC
51 - 60 of 107 Solicitations
1 2 3 4 6 8 9 10 11