General Info

Business Logo

Kansas Turnpike Authority

9401 E Kellogg Dr, Wichita, KS 67207-1804
(316) 682-4537


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
KTA 8171
This project on KTA (I-70) in Douglas and Leavenworth Counties consists of grading, bridges (10 mainline and 2 overhead), and surfacing to construct a 6-lane roadway for approximately 8.4 miles on mainline KTA (I-70).
10/13/2026 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
KTA #7874
This work will include fabrication and delivery of fifty-two (52) Overhead Sign Structures (Aluminum). The structures will be installed under four separate contracts that involve construction of mainline toll zones as a part of the Kansas Turnpike Authority’s transition to cashless tolling.
09/21/2021 03:00 PM UTC
KTA #7808
This work will include: Drainage work at KTA milepost 219.85. There is an existing 6’1” x 8’10” Steel Plate Pipe Arch that is in need of repair. This work will be to place an adjacent 164’ of 72”Jacked Pipe parallel to the east of the existing pipe using the same flowline. Then to line and grout the existing pipe with 164’ of 48” x 76” Elliptical Concrete Pipe. Small amount of earthwork just for cleaning up the area.
06/15/2021 07:00 PM UTC
KTA #7788
This project is the civil construction work for cashless tolling sites on I-35 (KTA) in Sumner and Sedgwick County MM 21.16, MM 30.52, MM 36.43, MM 39.50, MM 47.00 & MM 50.01.
05/18/2021 07:00 PM UTC
KTA #7668
This work will include Re-deck and Raise Br. No’s. 171.347 (Wannamaker Road over I-335) and 172.477 (69th St. over I-335). Extend RCB at MM 172.1. Extend RCP at MM 172.6.
04/13/2021 07:00 PM UTC
KTA #7782
This work will include re-decking and raising bridges at MM 61.197 (Santa Fe Lake Road) and MM 69.687 (Purity Springs Road).
01/12/2021 08:30 PM UTC
KTA #7724
This work will include mill and superpave overlay from MM 26.8 to MM 50.8. Mill and Inlay, as shown in the plans, Mulvane Interchange (MM 33), Haysville-Derby Interchange (MM 39), South Wichita Interchange (MM 42), K-15 Interchange (MM 45), and East Wichita Interchange (MM 50). Construct crossovers at MM 36.0, MM 36.8, MM 39.3, MM 41.25, MM 41.6, MM 42.2, MM 47.6, MM 49.9, and MM 50.1.
01/12/2021 08:00 PM UTC
KTA #7756
This work will include painting and tank rehab for water towers located at the KTA Service Areas: Belle Plaine, Towanda, Matfield Green, Emporia, and Lawrence.
12/08/2020 08:00 PM UTC
KTA # 7778
This work will include the installation of a new private sanitary sewer main and abandoning the existing private sanitary sewer main for the KTA headquarters complex. Sedgwick County, Kansas.
08/19/2020 07:00 PM UTC
KTA #7723
This work will include removal and land application of sewage solids, (sludge), from the Topeka Service Area Sewage Treatment Lagoons.
07/16/2020 07:00 PM UTC
KTA #7709
The project location is KTA (I-335) in Lyon County and KTA (I-70) in Shawnee and Douglas Counties. The primary operations to be undertaken with this project (KTA Contract No. 7709) are: Mill and Asphaltic Concrete Inlay of the Admire Maintenance Yard MM 147; Mill and Asphaltic Concrete Inlay of driving lanes and Hadite Chip Seal of Shoulders from KTA (I-70) MM 183.3 to KTA (I-70) MM 197.7; Truck Parking Expansion, Mill & Inlay of Ramps and Micro-surfacing at Topeka Service Area KTA (I-70) MM 188; Milling and Inlaying ramps at Lecompton Interchange KTA (I-70) MM 197.6.
04/15/2020 07:00 PM UTC
61 - 70 of 107 Solicitations
1 2 3 4 5 7 9 10 11