General Info

Business Logo

Kansas Turnpike Authority

9401 E Kellogg Dr, Wichita, KS 67207-1804
(316) 682-4537


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
KTA 8171
This project on KTA (I-70) in Douglas and Leavenworth Counties consists of grading, bridges (10 mainline and 2 overhead), and surfacing to construct a 6-lane roadway for approximately 8.4 miles on mainline KTA (I-70).
10/13/2026 07:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
KTA #7557
This work will include Construction of Reinforced Concrete Box Culverts at KTA/I-335 MM 151.5 and MM 153.8. Structures are designated as follows: Br. No. KTA/I-335-9-151.50 (168) – Double 10'x8'x112'-0” and extend existing 14’x8’ RCB. Br. No. KTA/I-335-9-153.80 (169) – Single 12'x8'x137'-3” and extend existing 10'x8' RCB.
01/28/2020 08:00 PM UTC
KTA #7506
This work will include re-deck and raise Br. No. 155.55 (K-31 over KTA).
01/21/2020 08:00 PM UTC
KTA #7530
This work will include improvement of the acceleration and deceleration ramps at the Belle Plain Service Area near MM 26. Bridge number 25.473 and bridge number 25.474 will be replaced with this project. Bridge numbers 26.260 northbound and southbound will be removed.
12/13/2019 05:00 PM UTC
KTA #7532
This work will include re-decking and widening bridges 55.917 NB &SB.
12/13/2019 05:00 PM UTC
KTA #7527
This work will include asphalt surfacing MM 71.3 to 96.5 and ramp improvements at Plaza 76 & 92.
12/11/2019 08:00 PM UTC
KTA #7533
This work will include re-decking and widening bridges 143.180 NB & 143.180 SB.
11/12/2019 08:00 PM UTC
KTA #7529
This work will include mill and asphaltic concrete inlay of the driving lanes and shoulders from MM 210.7 to MM 224 as well as milling and overlaying the Tonganoxie Interchange (MM 212) and I-70/K-7 ramps as shown in the plans.
11/12/2019 08:00 PM UTC
KTA #7495
This work will include construction of 3-14' x 6' x 159' rigid frame box bridge at MM 19.687 and geometric improvement at MM 19.0 interchange in Sumner County.
10/23/2019 07:00 PM UTC
KTA #7528
This work will include mill and asphaltic concrete inlay of the driving lanes and shoulders from MM 167.7 to MM 183.3 as well as milling and overlaying the interchange and ramps at South Topeka, the access road, parking lots and maintenance yard (MM 177), and K-4 Interchange (MM 182) in Shawnee County.
10/15/2019 07:00 PM UTC
KTA #7526
This work will include full depth removal and replacement of designated PCCP panels on the ramps for the KTA Port of Entry at MM 1.700 in Sumner County.
07/23/2019 07:00 PM UTC
71 - 80 of 107 Solicitations
1 2 3 4 5 6 8 10 11