General Info

Business Logo

Kansas Turnpike Authority

9401 E Kellogg Dr, Wichita, KS 67207-1804
(316) 682-4537


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
KTA 8272
Construction of rigid frame box bridge at MM 21.41 and 21.65 in Sumner County.
12/08/2026 08:00 PM UTC
KTA 7910
Removal of existing bridge and the construction of two twin haunched slab span bridges at MM 34.579 over the Cowskin Creek.
12/08/2026 08:00 PM UTC
KTA 8305
Removal of existing bridge and the construction of two twin haunched slab span bridges at MM 27.492 over K-55.
12/08/2026 08:00 PM UTC
KTA 8361
This project on KTA (I-35) in Sumner County is for levee repairs at MM 15 (Slate Creek).
12/08/2026 08:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
KTA #7529
This work will include mill and asphaltic concrete inlay of the driving lanes and shoulders from MM 210.7 to MM 224 as well as milling and overlaying the Tonganoxie Interchange (MM 212) and I-70/K-7 ramps as shown in the plans.
11/12/2019 08:00 PM UTC
KTA #7495
This work will include construction of 3-14' x 6' x 159' rigid frame box bridge at MM 19.687 and geometric improvement at MM 19.0 interchange in Sumner County.
10/23/2019 07:00 PM UTC
KTA #7528
This work will include mill and asphaltic concrete inlay of the driving lanes and shoulders from MM 167.7 to MM 183.3 as well as milling and overlaying the interchange and ramps at South Topeka, the access road, parking lots and maintenance yard (MM 177), and K-4 Interchange (MM 182) in Shawnee County.
10/15/2019 07:00 PM UTC
KTA #7526
This work will include full depth removal and replacement of designated PCCP panels on the ramps for the KTA Port of Entry at MM 1.700 in Sumner County.
07/23/2019 07:00 PM UTC
KTA #7578
Bridge Painting Lyon, Osage, Shawnee & Leavenworth County: Br. 148.590, Br. 158.963, Br. 169.627, Br. 172.477, & Br. 219.242.
07/16/2019 07:00 PM UTC
KTA #7579
Bridge Painting for the following Bridges: Br. 3.048 (4), Br. 6.059 (8), Br. 8.078 (10), Br. 10.101 (12), Br. 11.105 (13) and Br. 20.172 (23) N.B.
07/16/2019 07:00 PM UTC
KTA #7482
HMA surfacing KTA MM 112.3 to 133.2, expansion joint repairs to northbound and southbound KTA Bridges 124.68 and 125.22, accel & decel ramp extension at Emporia Service Area, and drainage improvements at MM 132.2.
05/21/2019 07:00 PM UTC
KTA #7357
This work will include Ramp Improvements at Lecompton Interchange (MM 197.2), UBAS Surfacing from MM 197.9 to MM 210.7, and Drainage Structure Improvements at MM 212.1 and 214.2 in Douglas and Leavenworth Counties.
03/19/2019 07:00 PM UTC
KTA #7325
The project includes milling, overlaying and raising bridge 102.26 in Chase County.
01/22/2019 08:00 PM UTC
KTA #7170
Various rehabilitation actions to northbound and southbound KTA mainline bridges 40.024 & 40.449. The project is located in Sedgwick County.
12/12/2018 08:00 PM UTC
81 - 90 of 111 Solicitations
1 2 3 4 5 6 7 9 11 12