General Info

Business Logo

City of Hudson, OH

115 Executive Parkway Suite 400, Hudson, OH 44236
(330) 342-1770

www.hudson.oh.us

Standard Documents

Name * Description
2017 Asphalt Resurfacing Program (132 KB)
Bid Tabulation
2017 Concrete Replacement Program (31.5 KB)
Bid Tabulation
2017 Storm Sewer Lining (26 KB)
Bid Tabulation
2017 Line Striping and Painting Program (62.9 KB)
Bid Tabulation
Atterbury Blvd Storm Structure Repairs (2017) (29.7 KB)
Bid Tabulation
2017 Crack Sealing (126 KB)
Bid Tabulation
2017 Crack Sealing - Re-bid.pdf (187 KB)
Bid Tabulation
Manor Drive Waterline and Storm Sewer Installation (2017) (158 KB)
Bid Tabulation
Repainting of Fire Hydrants on the Akron Water System (13.5 KB)
Bid Tabulation
Manor Drive Waterline and Storm Sewer Installation - REBID (184 KB)
Bid Tabulation
2018 Asphalt Program (73.9 KB)
Bid Tabulation - Awarded to Ronyak Paving
2018 Guardrail Replacement (67.5 KB)
Bid Tabulation - Awarded to Lake Erie Construction
Valley View Culvert Replacement (65.7 KB)
Bid Tabulation - Awarded to CATTS Construction
2018 Concrete Replacement Program (140 KB)
Bid Tabulation - Awarded to Liberta
Salt Storage and Bus Maintenance Garage (198 KB)
Bid Tabulation - Awarded to Cavanaugh Building
2018 Crack Sealing (99.5 KB)
Bid Tabulation - Awarded to Asphalt Fabrics
2018 Line Striping and Painting (69.5 KB)
Bid Tabulation - Awarded to Dura Mark
2018 Storm Sewer Lining (33.9 KB)
Bid Tabulation - Awarded to Insight Pipe
Seasons Road Interchange Signal Pole Procurement (11.4 KB)
Bid Tabulation - Awarded to Path Master
Hudson Drive Waterline (7-10-2018) (67 KB)
Bid Tabulation - All Bids Rejected
Hudson Drive Waterline - Rebid (8-16-2018) (183 KB)
Bid Tabulation - All Bids Rejected
S.R. 303 Butterfly Valve Replacement Project (10-23-2018) (61 KB)
Bid Tabulation - All Bids Rejected
City Administration Building ADA Ramp Installation - Rebid (10-23-2018) (25.2 KB)
Bid Tabulation - All Bids Rejected
2019 Asphalt Resurfacing Program (250 KB)
Bid Tabulation - Awarded to Perrin Asphalt
S.R. 303 Butterfly Valve Replacement Project - REBID (12-11-2018) (61.9 KB)
Bid Tabulation - Awarded to M. Campbell Contracting
N. Main St/Brandywine Drive Storm Sewer (Cemetery) Project (1-8-2019) (64 KB)
Bid Tabulation - Awarded to Lake Co. Landscape
City Admin Renovations & ADA Ramp - 1-29-2019 (79.6 KB)
Bid Tabulation - All Bids Rejected
2019 Concrete Program (2-5-2019) (189 KB)
Bid Tabulation - Awarded to Set-in-Stone Contracting
2019 Line Striping and Painting (3-5-2019) (78.6 KB)
Bid Tabulation - Awarded to Dura Mark
2019 Crack Sealing Program (2-26-2019) (92.4 KB)
Bid Tabulation - Awarded to Asphalt Fabrics
2019 Storm Lining (4-4-2019) (75.6 KB)
Bid Tabulation - Awarded to Insight Pipe
City Admin Renovations ADA Ramp (2-19-2019) (127 KB)
Bid Tabulation - Awarded to Augere Construction
Hudson Drive Waterline Instalaltion (6-4-2019) (91.2 KB)
Bid Tabulation - Awarded to X-Press Underground
Hudson Old School Green (6-19-2019) (86.5 KB)
Bid Tabulation - Awarded to Vizmeg Landscape
Owen Brown Street Remediation and Demolition Phase 2 - Bus Garage (82.7 KB)
Bid Tabulation
35 Documents

Upcoming Solicitations

Number Deadline
TREE MAINTENANCE
The proposed work consists of line clearance tree maintenance and municipal tree trimming and tree removal in the City of Hudson. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
07/25/2019 02:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
Barlow Community Center Roof Replacement and Repair
The proposed work consists of roof replacement and repairs at the Barlow Community Center.
07/23/2018 02:00 PM UTC
Hudson Drive Waterline Project
The proposed work consists of the installation of approximately 3,135 lineal feet of 12 inch, PVC, CERTALOK-DR14 water main and 1,850 lineal feet of 2-inch HDPE electrical conduit from Hudson Drive/Hudson Gate Drive intersection, along Hudson Drive and the Summit Metroparks Hike and Bike Trail to an existing 12-inch water main at the Metro RTA railroad tracks in the City of Hudson, Ohio.
07/10/2018 01:30 PM UTC
Installation and Construction for the Prospect Substation Improvement Project
The proposed work consists of furnishing all necessary labor, supervision, tools, material and equipment (with exception of major equipment furnished by the City and installed by the contractor) to complete each of the following project task items for construction of the Prospect Substation Improvements.
06/06/2018 01:00 PM UTC
Seasons Road Interchange Signal Equipment Procurement (PID 76721)
The purchase will consist of strain poles, mast arms, anchor bolts, conduit cells, and associated hardware all painted black. Equipment to be stored by Supplier until requested for delivery to the SUM-8-7.81 (PID 76721), a portion of which is located in the City of Hudson, Ohio. The project is Federally Funded.
05/22/2018 01:30 PM UTC
Major Equipment II for Prospect Substation Lot of Structures, Switches and bussing ReBid
The proposed work for the third contract will be to supply one (1) Lot of specified Structures, Switches and Bussing for the Prospect Substation Improvements in the City of Hudson, Ohio.
05/21/2018 01:00 PM UTC
Animal Collection and Disposal Services
The proposed work consists of services to collected and dispose of animal remains on City owned property listed in this document in the City of Hudson, Ohio.
04/26/2018 02:00 PM UTC
ONE (1) LOT OF STRUCTURES, SWITCHES AND BUSSING
The proposed work for the third contract will be to supply one (1) Lot of specified Structures, Switches and Bussing for the Prospect Substation Improvements in the City of Hudson, Ohio.
04/26/2018 01:20 PM UTC
SIX (6) 7.62 kV DISTRIBUTION VOLTAGE REGULATORS
The proposed work for the second contract will be to supply six (6) 7.62kV Distribution Voltage Regulators for the Prospect Substation Improvements in the City of Hudson, Ohio.
04/26/2018 01:10 PM UTC
TWO (2) 69Kv GAS CIRCUIT BREAKERS for THE PROSPECT SUBSTATION IMPROVEMENTS
The proposed work for the first contract consists of furnishing two (2) 69kV Gas Circuit Breakers for the Prospect Substation Improvements in the City of Hudson, Ohio.
04/26/2018 01:00 PM UTC
2018 Storm Sewer Lining
The proposed work consists of approximately 240 LF of 15-inch cured-in-place liner, 260 LF of 18-inch cured-in-place liner, 256 LF of 21-inch cured-in-place liner, 105 LF of 36-inch cured-in-place liner, and 150 LF of 42-inch cured-in-place liner for storm sewer at various locations in the City of Hudson, Ohio.
04/04/2018 01:30 PM UTC
31 - 40 of 77 Solicitations
1 2 4 6 7 8