General Info

Business Logo

City of Hudson, OH

1140 Terex Rd, Hudson, OH 44236-3771
(330) 342-1770

www.hudson.oh.us

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
SR 303 Safety Improvements (PID 117269) - REBID
The proposed work consists of modification of lane configurations, curb lines and ADA ramps along W. Streetsboro Street (SR 303) from Boston Mills Road to Atterbury Boulevard in the City of Hudson, Ohio.
08/05/2025 01:30 PM UTC
Valley View Road Culvert Repair
This project consists of the removal and replacement of a culvert in an existing drainage ditch off Valley View Road on private property and the reestablishment of the drainage ditch for approximately 50 Lineal Feet downstream in the City of Hudson, Ohio
08/05/2025 02:30 PM UTC
Towbridge Rear Yard Drainage Improvement
The proposed work consists of the reestablishment of an existing drainage ditch (Stefan’s Run) and cleaning and removing debris from the ditch for approximately 1,800 lineal feet to better promote positive flow of the existing upstream storm facilities in the City of Hudson, Ohio.
08/12/2025 01:30 PM UTC
Preventative Maintenance & Relay Testing of the Eastside Substation - REBID
The proposed work consists of preventative maintenance and relay testing at the Eastside Substation in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
08/12/2025 02:00 PM UTC
Herrick Park Drive Storm Improvements
The proposed work consists of the installation of new 8” PVC SDR 35 storm pipe, 12” PVC SDR 35 storm pipe, 2-2 catch basins to improve overland drainage near 7410 Herrick Park Drive as well as tying the new storm system into the existing storm facilities on Herrick Park Drive and improvements to an existing storm ditch & infrastructure off of Benjamin Circle in the City of Hudson, Ohio.
08/19/2025 01:30 PM UTC
Pickleball Courts Lighting Installation
The proposed work consists of the furnishing of all necessary labor, supervision, tools, material, and equipment (except for equipment furnished by OWNER and installed by the CONTRACTOR) to complete all Work necessary for the Pickleball Courts Lighting Installation in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
08/19/2025 02:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
Middleton and Stow Road Sidewalk Installation, Phase 1
The proposed work consists of the construction of Phase 1 ONLY of the plans which consists of approximately 2.52 miles of five (5) foot class C concrete sidewalk, storm improvements, ADA curb ramps, lighting upgrades, intersection improvements and signing along Middleton Road between Darrow Road (SR 91) and I-480 and Stow Road between Middleton Road and Chamberlin Blvd. Future phases of sidewalk construction along the west end of Middleton Road (between Valley View Road and Darrow Road) and Stow Road (between Chamberlin Blvd. and I-480) will be completed at a separate time under a separate contract. The project also includes driveway improvements, curb installation, necessary grading and restoration, water quality improvements and pavement repairs in the City of Hudson, Ohio. Bidders are strongly encouraged to visit the site and understand the limits of the project and existing conditions.
07/12/2022 01:30 PM UTC
Middleton Road / Stow Road Signal Improvements
The proposed work consists of the signalization of the intersection of Middleton Road and Stow Road. Signal features are to include infrastructure for future connection into City’s adaptive signal system, preemption, and connection to adjacent existing school zone flashers. Project includes the removal of an existing overhead flashing stop control assembly and stop signs in the City of Hudson, Ohio.
07/12/2022 01:30 PM UTC
S. Main Street Widening-Rebid (Federal #E171463; PID 106445)
The proposed work consists of a road widening for the addition of a center two-way turn lane, resurfacing, 5-foot-wide bike lanes and sidewalks on both the east and west side of SR 91 from Barlow Road to Stoney Hill Drive in the City of Hudson, Ohio.
07/06/2022 02:00 PM UTC
Seasons Road Waterline Extension
The proposed work consists of the installation of approximately 5,585 L.F. of new 12” watermain and its apparatuses along Seasons Road in the City of Hudson, Ohio.
06/21/2022 01:30 PM UTC
Stow and Middleton Road Signal Equipment Pole Procurement
The purchase will consist of poles, pole extensions (for lighting bracket arm/luminaire), mast arms, pedestals (bases, plates), anchor bolts, and all associated hardware all painted black, in accordance with the specifications which are on file in the office of the City Engineer. Equipment is to be stored by Supplier until requested for delivery to the Stow Road/Middleton Road Signal Improvements Project.
06/01/2022 02:00 PM UTC
Preventative Maintenance & Relay Testing of the Prospect Substation
The proposed work consists of preventative maintenance and relay testing at the Prospect Substation in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
05/24/2022 02:00 PM UTC
Veterans Trail Phase 3 (re-bid)
The proposed work consists of the installation of an approximate 6,000-foot gravel path to include fencing, drainage, and a pedestrian bridge from Barlow Road to Veterans Way in the City of Hudson, Ohio.
05/10/2022 01:30 PM UTC
2022 Storm Sewer Lining
The proposed work consists of, but is not limited to, the installation of 12-inch, 15-inch, and 30-inch cured-in-place storm sewer lining, as well as alternate work for the installation of 12-inch, 15-inch, 21-inch, and 30-inch cured-in-place storm sewer lining at various locations in the City of Hudson, Ohio.
05/03/2022 02:00 PM UTC
Stow and Middleton Road Signal Equipment Procurement
The purchase will consist of poles, pole extensions (for lighting bracket arm/luminaire), mast arms, pedestals (bases, plates), anchor bolts, and all associated hardware all painted black, in accordance with the specifications which are on file in the office of the City Engineer. Equipment is to be stored by Supplier until requested for delivery to the Stow Road/Middleton Road Signal Improvements Project.
05/03/2022 01:30 PM UTC
Division Street Storm Improvement Project (re-bid)
The proposed work consists of the installation of 370 LF of new 8” PVC SDR 35 storm sewer, 45 LF of new 12" PVC SDR 35 Storm Sewer, manholes, curb inlets, and new 6” storm laterals with cleanouts within the Historic District on Division Street between E. Main Street and College in the City of Hudson, Ohio.
04/27/2022 01:30 PM UTC
101 - 110 of 267 Solicitations
1 2 7 8 9 11 13 14 15 26 27