General Info

Business Logo

City of Hudson, OH

1140 Terex Rd, Hudson, OH 44236-3771
(330) 342-1770

www.hudson.oh.us

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Gazebo ADA Chair Lift Installation
The proposed work consists of the installation of a new combination stair and ADA lift assembly at the Hudson Bandstand Gazebo, as part of the Gazebo Legacy Project in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
05/26/2026 02:00 PM UTC
Fiber to the Home, Year 2, Area 1
The proposed work includes the installation of new fiber optic infrastructure, including approximately 17,816 lineal feet of 1.5-inch underground HDPE fiber conduit via horizontal directional drilling, 14,156 lineal feet of 2 x 1.5-inch underground HDPE fiber conduit (2 parallel conduit runs pulled together) via horizontal directional drilling, 9,460 lineal feet of new aerial fiber, approximately 53,471 lineal feet of fiber optic cable (various strand count), installation of underground fiber vaults and handholes and the subsequent installation of fiber optic cable and appurtenances, and testing in the City of Hudson, Ohio. Bidders are required to provide a price for Labor Only.
05/27/2026 01:30 PM UTC
2026 Concrete Program (2nd Re-bid)
The proposed work consists of sidewalk replacement, sandstone sidewalk removal and replacement, handicap ramp installation, and curb replacement at various locations in the City of Hudson, Ohio.
06/11/2026 02:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Lake Forest Sidewalk and Road Realignment and Boston Mills Road Multi-Use Path
The proposed work on Lake Forest Drive includes the installation of approximately 1,800 LF of new five (5) foot wide Class C sidewalk, storm improvements, curbing, pedestrian improvements, driveway improvements, grading and restoration between Boston Mills Road and Essex Circle. The project also includes the realignment of Lake Forest Drive for approximately 230 feet. The proposed work on Boston Mills Road consists of the construction of approximately 3,600 feet of new 10’ wide multi-use path, including the installation of two timber boardwalks and a bridge over Lake Forest, an 8’ stone path through the Park will also be installed. Some of the existing multi-use paths along Boston Mills Road will also be used and upgraded between 115 Executive Parkway and Lake Forest Drive in the City of Hudson, Ohio.
09/10/2025 02:00 PM UTC
2025-2026 Residential Driveway Plowing Program
The proposed work consists of snow plowing services of residential driveways (and possible alternates involving snow clearing and salt application) to assist seniors and adults with disabilities within the City of Hudson, Ohio. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
08/26/2025 02:00 PM UTC
Pickleball Courts Lighting Installation
The proposed work consists of the furnishing of all necessary labor, supervision, tools, material, and equipment (except for equipment furnished by OWNER and installed by the CONTRACTOR) to complete all Work necessary for the Pickleball Courts Lighting Installation in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
08/19/2025 02:00 PM UTC
Herrick Park Drive Storm Improvements
The proposed work consists of the installation of new 8” PVC SDR 35 storm pipe, 12” PVC SDR 35 storm pipe, 2-2 catch basins to improve overland drainage near 7410 Herrick Park Drive as well as tying the new storm system into the existing storm facilities on Herrick Park Drive and improvements to an existing storm ditch & infrastructure off of Benjamin Circle in the City of Hudson, Ohio.
08/19/2025 01:30 PM UTC
Preventative Maintenance & Relay Testing of the Eastside Substation - REBID
The proposed work consists of preventative maintenance and relay testing at the Eastside Substation in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
08/12/2025 02:00 PM UTC
Towbridge Rear Yard Drainage Improvement
The proposed work consists of the reestablishment of an existing drainage ditch (Stefan’s Run) and cleaning and removing debris from the ditch for approximately 1,800 lineal feet to better promote positive flow of the existing upstream storm facilities in the City of Hudson, Ohio.
08/12/2025 01:30 PM UTC
Valley View Road Culvert Repair
This project consists of the removal and replacement of a culvert in an existing drainage ditch off Valley View Road on private property and the reestablishment of the drainage ditch for approximately 50 Lineal Feet downstream in the City of Hudson, Ohio
08/05/2025 02:30 PM UTC
SR 303 Safety Improvements (PID 117269) - REBID
The proposed work consists of modification of lane configurations, curb lines and ADA ramps along W. Streetsboro Street (SR 303) from Boston Mills Road to Atterbury Boulevard in the City of Hudson, Ohio.
08/05/2025 01:30 PM UTC
Well #2 Rehabilitation Project
The proposed work consists of consists of testing, removal, cleaning, repair and reinstallation of the Water Treatment Plant Well # 2 in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
07/22/2025 02:00 PM UTC
Meadowood Lane Culvert Improvements
The proposed work consists of the removal and replacement of two storm culverts under two sections of Meadowood Lane, the removal and replacement of an existing storm structure, and grading work in order to promote positive drainage into the proposed storm system in the City of Hudson, Ohio.
07/15/2025 01:30 PM UTC
31 - 40 of 305 Solicitations
1 2 4 6 7 8 9 30 31