General Info

Business Logo

City of Marysville, Ohio

209 S Main St, Marysville, OH 43040-1553
(937) 645-7350


Upcoming Solicitations

Number Deadline
301 N. Main Street Parking Lot
The construction of a new public parking lot located at 301 N. Main Street in uptown Marysville. Construction of the proposed parking lot includes the following items: clearing/grubbing, drive apron removal, sidewalk removal, pavement installation, curb installation, under drain installation, pavement markings, and permanent seeding. ENGINEER'S ESTIMATE: $235,754.08
11/25/2026 08:00 PM UTC
Aldersgate Park Restroom
This project is intending to construct a pre-engineered building to serve as a restroom at Aldersgate Park for the City of Marysville. Plans for the building construction and provided material can be found on Bid Express. Construction of the building will include; Site preparation, construction of building foundation per the Aldersgate Park Restroom plans, building assembly and connection to electric, city water and sewer which will be installed to the building location by the City of Marysville prior to construction VIRTUAL MEETING INVITE (Google Meets) Aldersgate Park Restroom Pre-Bid Meeting Friday, November 13 · 1:30 – 2:30pm Time zone: America/New_York Google Meet joining info Video call link: https://meet.google.com/czn-mhyy-bmo Or dial: ‪(US) +1 904-580-8941‬ PIN: ‪536 275 083‬# More phone numbers: https://tel.meet/czn-mhyy-bmo?pin=3480709781280
11/25/2026 08:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
2027 Sanitary Sewer Cured-in-Place Pipe (CIPP) Lining Project
The work consists of completing cured-in-place pipe lining (CIPP). Specifications include Traffic Control, TV Inspection, Cleaning, Chemical Grouting, CIPP, Service Connection Liner, Polyurea Manhole Rehabilitation, Temporary Bypass Pumping. Project Location • Between 7th and 8th Street from Grove Street to S. Court Street • Between 5th and 6th Street from Chestnut Street to Poplar Street Pre-Bid Meeting Information (VIRTUAL) Date: November 12, 2026 Time: 1:00 PM https://teams.microsoft.com/meet/2378991686536148?p=jPklmmYPdA3SNmDhbG Meeting ID: 237 899 168 653 614 8 Password: 2dj2rG66
11/20/2026 03:00 PM UTC
2027 Water Treatment Chemicals - Carbon Dioxide
The City of Marysville has issued an Invitation to bid on the following water treatment chemicals: Carbon Dioxide (CO2). The bid consists of supplying and delivering the chemicals to the City of Marysville Water Treatment at 18000 Raymond Road for operations during the 2027 calendar year. The ESTIMATED quantities are: Carbon Dioxide (CO2) - 600,000 lbs. Any quantity specified is an estimate only. The City of Marysville will purchase just the quantities necessary, at various times, to perform the intended operation. The purchased quantities may be equal to, less than, or greater than, the estimate.
11/12/2026 03:00 PM UTC
2027 Wastewater Treatment Chemicals - Nitrate Solution
The City of Marysville has issued an Invitation to bid on the following wastewater treatment chemicals: Nitrate Solution (Liquid Calcium Nitrate). The bid consists of supplying and delivering the chemicals to the City of Marysville wastewater division facilities including pump stations and collections facility for operations during the 2027 calendar year. These require remote monitoring. The ESTIMATED quantities are: Nitrate Solution (Liquid Calcium Nitrate) - 80,000 gallons Any quantity specified is an estimate only. The City of Marysville will purchase just the quantities necessary, at various times, to perform the intended operation. The purchased quantities may be equal to, less than, or greater than, the estimate.
11/12/2026 03:00 PM UTC
New Well #7
Project consists of a new "rock" well #7 with a proposed rated capacity of 1,000 gpm, well pump testing / report and associated improvements including waterline connection to well, vertical turbine well pump with submersible motor, pitless adapter, utility rack for electrical equipment mounting, in-well water level sensor, valve / meter vault, and ancillary items. The City will be providing finished grade and will be adding approximately 3 feet of compacted material during or after the project.
10/22/2026 06:00 PM UTC
2026 Removal of Water Treatment Plant Lime Lagoon Sludge Residuals
The purpose of this project is to remove the lime sludge from the water treatment plant’s lime sludge lagoon by means of pumping techniques for the City of Marysville. The quantities of sludge to be paid for under this contract shall be the calculated number of dry tons of sludge removed from the City’s lime sludge lagoon in accordance with the specifications herein and measured for payment as specified. Calculation of dry solids shall be by the following formula: CAKE SLUDGE DRY TONS = Wet lbs. removed x % Solids x Sp. Gr. (1.05) / 2,000 lbs. Solids Determination: The value for % solids will be determined by the Owner’s lab or by a certified testing laboratory. This is at no cost to the Contractor.
10/15/2026 05:00 PM UTC
UNI-East 5th Street
Project overview: • Construction of Traffic Calming Improvement along E. 5th Street from Walnut Street to Poplar Street. • The project will include pavement planing, curb replacement, drainage improvements, enhanced pedestrian crossings, street lighting, streetscaping, pavement marking, and necessary traffic control devices. A Pre-Bid Conference will be held at City Hall, 209 South Main St., Marysville, Ohio on Friday, April 24, 2026 at 11:00 a.m. Due to the public location of this work, prospective bidders are encouraged to inspect the project areas and existing facilities at any time and submit all questions through www.bidexpress.com.
05/08/2026 03:00 PM UTC
Tertiary Filter Upgrade - Water Reclamation Facility - RFQ
The City of Marysville is requesting Statements of Qualifications from Construction Manager at Risk (CMAR) organizations for the construction of the following Project, and for related pre-construction and procurement CMAR services: Tertiary Filter Upgrade – Water Reclamation Facility 50225-001 Statements of Qualifications demonstrating qualifications and ability to provide CMAR services and construct the Project shall be submitted to Cory Smith, Wastewater Superintendent via email to csmith@marysvilleohio.org until April 17, 2026 at 9:00 A.M. After that time, Marysville will no longer accept Statements of Qualifications. The CMAR Contract will include the following services and Work: • Construction Manager at Risk services including public sector construction, specifically at a wastewater treatment facility and procurement services seeking qualified construction subcontractors for specified Work packages. • Preconstruction services including, but not limited to, scheduling, cost estimating, constructability review, preliminary and final Guaranteed Maximum Price (GMP) development and open book pricing. Owner anticipates that the CMAR’s Contract Price will be approximately $3,000,000 with a range from $2,000,000 to $4,500,000 (Class IV estimated). The Project is anticipated to be fully funded using City Wastewater Funds with the CMAR pre-construction services and budgetary Contract Price included in the 2026-2027 fiscal year budget. The CMAR Contract has an expected start date September 2026 and duration for construction of 15 months. Project information and Proposal Documents for the CMAR Contract can be found on Bid Express (www.bidexpress.com). Questions about the Project should be posted on Bid Express. Selection of the Construction Manager at Risk will be made using a two-step process. • Step One: Owner will receive Statements of Qualifications. • Step Two: The most highly qualified Proposers will receive a Request for Proposals and will submit a detailed Proposal for the CMAR Contract for the Owner’s consideration.
04/17/2026 01:00 PM UTC
2026 Paving Program
The project consists of the following: • Pavement planing and re-surfacing of approximately 8,500 L.F of roadway • Including curb ramp, curb, and sidewalk replacement • Pavement planning and re-surfacing with generally two (2) inches of asphalt concrete surface course • Installation of pavement markings
04/02/2026 05:00 PM UTC
Colemans Crossing & Honda Marysville Traffic Signal
This project consists of installing a traffic signal, including curb ramp replacement, signage and pavement marking modifications, at the intersection of Colemans Crossing Boulevard and the Honda Marysville/Wal-Mart drive in the City of Marysville, Ohio. There will be a Pre-Bid Meeting held virtually on February 27, 2026 at 10:00 A.M. via the link provided below. Following the Pre-Bid Meeting, prospective Bidders are encouraged to inspect the project area and existing facilities. VIRTUAL Pre-Bid Meeting: Colemans Crossing & Honda Marysville Traffic Signal Friday, February 27 ⋅ 10:00 – 11:00am Time zone: America/New_York Google Meet joining info Video call link: https://meet.google.com/mnx-qanr-tfy Join by phone: ‪(US) +1 440-652-2236‬ PIN: ‪927 633 336‬#‬‬‬‬
03/13/2026 02:00 PM UTC
Waterline Improvements - Kimberly Drive & Briarwood Drive
This project will include the cutting, capping, and abandonment of the existing 8" waterlines along Kimberly and Briarwood Drives, which are to be replaced with 1092 and 926 LF of 8" waterline, respectively. This project will also include a pavement mill and overlay of Kimberly Drive and Briarwood Drive. Necessary maintenance of traffic, roadway striping, seeding, erosion control, and other miscellaneous items are required to restore the areas to their original condition. There will be a Pre-Bid Meeting held virtually on February 4, 2026 at 1:00 P.M. via the link provided below. Following the Pre-Bid Meeting, prospective Bidders are encouraged to inspect the project area and existing facilities. VIRTUAL Pre-Bid Meeting: Waterline Improvements - Kimberly Drive & Briarwood Drive Wednesday, February 4 · 1:00 – 2:00pm Time zone: America/New_York Google Meet joining info Video call link: https://meet.google.com/sbd-qyhv-yxd Or dial: ‪(US) +1 443-671-4649‬ PIN: ‪463 179 471‬# More phone numbers: https://tel.meet/sbd-qyhv-yxd?pin=8695283567406
02/25/2026 06:00 PM UTC
1 - 10 of 145 Solicitations
← Previous 1 3 4 5 6 7 8 9 … 14 15