City of Marysville, Ohio
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
| Name * | Description | |
|---|---|---|
| 2016 odot construction and material specifications.pdf (6.83 MB) | ||
| general plan notes.pdf (18 KB) | ||
| public roadway plan notes.pdf (46.2 KB) | ||
| sanitary sewer plan notes.pdf (50.5 KB) | ||
| storm sewer plan notes.pdf (48.5 KB) | ||
| water plan notes.pdf (47.8 KB) | ||
| sanitary sewer specifications.pdf (1.1 MB) | ||
| water specifications.pdf (9.63 MB) | ||
| sanitary sewer standard drawings.pdf (1.66 MB) | ||
| stormwater standard drawings.pdf (2.11 MB) | ||
| street standard drawings.pdf (3.52 MB) | ||
| water standard drawings.pdf (2.37 MB) | ||
| marysville supplemental specifcations.pdf (773 KB) | ||
| stormwater drainage manual.pdf (2.89 MB) | ||
| marysville_2017 w-9.pdf (75.7 KB) | ||
| Number | Deadline |
|---|---|
|
301 N. Main Street Parking Lot
The construction of a new public parking lot located at 301 N. Main Street in uptown Marysville. Construction of the proposed parking lot includes the following items: clearing/grubbing, drive apron removal, sidewalk removal, pavement installation, curb installation, under drain installation, pavement markings, and permanent seeding.
ENGINEER'S ESTIMATE: $235,754.08
| 11/25/2026 08:00 PM UTC |
|
Aldersgate Park Restroom
This project is intending to construct a pre-engineered building to serve as a restroom at Aldersgate Park for the City of Marysville. Plans for the building construction and provided material can be found on Bid Express.
Construction of the building will include; Site preparation, construction of building foundation per the Aldersgate Park Restroom plans, building assembly and connection to electric, city water and sewer which will be installed to the building location by the City of Marysville prior to construction
VIRTUAL MEETING INVITE (Google Meets)
Aldersgate Park Restroom Pre-Bid Meeting
Friday, November 13 · 1:30 – 2:30pm
Time zone: America/New_York
Google Meet joining info
Video call link: https://meet.google.com/czn-mhyy-bmo
Or dial: (US) +1 904-580-8941 PIN: 536 275 083#
More phone numbers: https://tel.meet/czn-mhyy-bmo?pin=3480709781280
| 11/25/2026 08:00 PM UTC |
| Number | Deadline |
|---|---|
|
Marysville Bridge Design RFQ
The City of Marysville, Ohio, wishes to receive Letters of Interest (LOI) from an Engineering Consultant (or team including sub-consultants) to assist the City with the East 4th Street Bridge Replacement and the new Mill Valley/Upland Reservoir Pedestrian Connector Path and Bridge projects. The project scope shall be sufficient to prepare all final construction documents including the necessary survey, soils testing, calculations, permitting (Ohio EPA, Army Corps, Jerome Township, and Union County Building Department, etc.) and construction services for both the East 4th Street Bridge Replacement and the Mill Valley/Upland Reservoir Pedestrian Connector Path and Bridge.
The project will consist of two areas of interest. The first portion of the project will consist of the design, removal, and replacement of the East Fourth Street Bridge over Town Run between Plum Street and Walnut Street. The second portion of the project is the new Mill Valley/Upland Reservoir Pedestrian Connector Path and Bridge. This portion of the project includes the installation of 4,562 feet of 10 foot wide trail and a bridge that will span Mill Creek. The proposed bridge will have an approximate length of 170 feet.
All submittals should be emailed directly to the Assistant City Engineer, Chad Green, P.E. (cgreen@marysvilleohio.org) by 4:00 p.m. on Friday, February 5, 2021
| 02/05/2021 09:00 PM UTC |
|
2021 Propane
The work consists of providing PROPANE for the City of Marysville Wastewater Reclamation Facility operations during the 2021 calendar year:
| 11/24/2020 03:00 PM UTC |
|
2021 Nitrate Solution
The work consists of providing NITRATE SOLUTION for the City of Marysville Wastewater Reclamation Facility operations during the 2021 calendar year:
| 11/24/2020 03:00 PM UTC |
|
2021 Ferric Chloride Solution
The work consists of providing FERRIC CHLORIDE SOLUTION for the City of Marysville Wastewater Reclamation Facility operations during the 2021 calendar year:
| 11/24/2020 03:00 PM UTC |
|
2021 Pebble Lime
The work consists of providing Pebble Lime (estimated quantity is 3,000,000 lbs.) for the City of Marysville's water treatment plant operations during the 2021 calendar year
| 11/24/2020 03:00 PM UTC |
|
2021 Carbon Dioxide
The work consists of providing Carbon Dioxide (estimated quantity is 300,000 lbs.) for the City of Marysville's water treatment plant operations during the 2021 calendar year
| 11/24/2020 03:00 PM UTC |
|
2021 Chlorine
The work consists of providing Chlorine in 150 lb. cylinders (estimated quantity is 50,000 lbs.) for the City of Marysville's water treatment plant operations during the 2021 calendar year
| 11/24/2020 03:00 PM UTC |
|
2021 Bulk Soda Ash
The work consists of providing Bulk Soda Ash (estimated quantity is 2,500,000 lbs.) for the City of Marysville's water treatment plant operations during the 2021 calendar year
| 11/24/2020 03:00 PM UTC |
|
2021 Hydrofluorosilicic Acid
The work consists of providing Hydrofluorosilicic Acid (Acid 25% in 330 gallon totes, estimated quantity is 23,100 lbs.) for the City of Marysville's water treatment plant operations during the 2021 calendar year
| 11/24/2020 03:00 PM UTC |
|
2021 Sodium Polyphosphate Blend, Granular
The work consists of providing Sodium Polyphosphate Blend, Granular in 50 lb bags (estimated quantity is 3,500 lbs.) for the City of Marysville's water treatment plant operations during the 2021 calendar year
| 11/24/2020 03:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.