Upcoming Solicitations

Number Deadline
2026 Removal of Water Treatment Plant Lime Lagoon Sludge Residuals
The purpose of this project is to remove the lime sludge from the water treatment plant’s lime sludge lagoon by means of pumping techniques for the City of Marysville. The quantities of sludge to be paid for under this contract shall be the calculated number of dry tons of sludge removed from the City’s lime sludge lagoon in accordance with the specifications herein and measured for payment as specified. Calculation of dry solids shall be by the following formula: CAKE SLUDGE DRY TONS = Wet lbs. removed x % Solids x Sp. Gr. (1.05) / 2,000 lbs. Solids Determination: The value for % solids will be determined by the Owner’s lab or by a certified testing laboratory. This is at no cost to the Contractor.
10/15/2026 05:00 PM UTC
New Well #7
Project consists of a new "rock" well #7 with a proposed rated capacity of 1,000 gpm, well pump testing / report and associated improvements including waterline connection to well, vertical turbine well pump with submersible motor, pitless adapter, utility rack for electrical equipment mounting, in-well water level sensor, valve / meter vault, and ancillary items. The City will be providing finished grade and will be adding approximately 3 feet of compacted material during or after the project.
10/22/2026 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
2020 Paving Program
City of Marysville annual resurfacing program. This project includes the following: 1) Pavement resurfacing of approximately 9,000 LF of roadway. 2) Including curb ramps, curb, and sidewalk replacement. 3) Installation of pavement markings.
02/24/2020 07:00 PM UTC
SR-31 Improvements, Phase 2 (PID 106441)
The project consists of the following: • Construct a new Ramp ‘E’ spur to connect S.R. 31 to U.S. 33 across from existing Ramp ’F’ – approximately 500 linear feet • Add an additional lane to existing Ramp ‘E’ – approximately 350 linear feet • Construct an extension of Northwoods Drive between S.R. 31 and Mill Road – approximately 725 linear feet • Convert a three leg intersection to a four leg intersection with the construction of a new round-a-bout • Extend Cobblestone Way to the proposed Northwoods Drive extension – approximately 350 linear feet • The widening of Ramp ‘E’ will require extending the existing culvert. • A new culvert will be needed for the new Ramp ‘E’ spur. • The project will include also curbing, storm sewer installation, striping, signage, street lighting, traffic signal replacement, sidewalks, shared use path, sanitary sewer, and water line installation.
02/13/2020 04:30 PM UTC
East 6th Street Waterline Replacement
• Installation of approximately 2,970 linear feet of 8” C909 waterline pipe, 9 fire hydrant assemblies, and all associated waterline appurtenances. • Relocation of approximately 48 water service taps. • Proper abandonment of existing waterline and the removal of existing main line valves and fire hydrants assemblies. • Necessary restoration (including asphalt, driveway, sidewalk and curb replacement, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. • Via Alternate Bids, this work may also contain additional waterline installation, relocation of water service taps, fire hydrants, and abandonment of existing waterline along Walnut Street.
02/07/2020 06:30 PM UTC
Farm Land Lease - Beecher Gamble Road
The City of Marysville is awarding a two year lease of crop acres for the following property: 12901 Beecher Gamble Road adjacent to the Wastewater Reclamation Facility consisting of approximately 33 acres located in Union County, Ohio, owned by the City of Marysville. If you have any questions on using Bid Express please contact Chad Green at cgreen@marysvilleohio.org or (937) 645-7376
01/10/2020 06:00 PM UTC
Farm Land Lease - Industrial Parkway
The City of Marysville is awarding a two year lease of crop acres for the following property:Industrial Parkway (between Coleman’s Crossing and Suntra Way) consisting of approximately 175 acres located in Union County, Ohio, owned by the City of Marysville. The planted crops shall be low growing (i.e. soybeans) to ensure views of the property will not be obstructed. If you have any questions on using Bid Express please contact Chad Green at cgreen@marysvilleohio.org or (937) 645-7376
01/10/2020 06:00 PM UTC
2020 Pebble Lime
The work consists of providing Pebble Lime (estimated quantity is 3,000,000 lbs) for the City of Marysville's water treatment plant operations during the 2020 calendar year.
12/17/2019 06:30 PM UTC
2020 Carbon Dioxide
The work consists of providing Carbon Dioxide (estimated quantity is 300,000 lbs) for the City of Marysville's water treatment plant operations during the 2020 calendar year
12/17/2019 06:30 PM UTC
2020 Propane
The work consists of providing PROPANE to the City of Marysville in the 2020 calendar year.
11/22/2019 03:00 PM UTC
2020 Ferric Chloride Solution
The work consists of providing FERRIC CHLORIDE SOLUTION to the City of Marysville in the 2020 calendar year.
11/22/2019 03:00 PM UTC
2020 Nitrate Solution
The work consists of providing NITRATE SOLUTION for the control of hydrogen sulfide to the City of Marysville in the 2020 calendar year.
11/22/2019 03:00 PM UTC
101 - 110 of 140 Solicitations