General Info

Business Logo

City of Marysville, Ohio

209 S Main St, Marysville, OH 43040-1553
(937) 645-7350


Upcoming Solicitations

Number Deadline
2026 Removal of Water Treatment Plant Lime Lagoon Sludge Residuals
The purpose of this project is to remove the lime sludge from the water treatment plant’s lime sludge lagoon by means of pumping techniques for the City of Marysville. The quantities of sludge to be paid for under this contract shall be the calculated number of dry tons of sludge removed from the City’s lime sludge lagoon in accordance with the specifications herein and measured for payment as specified. Calculation of dry solids shall be by the following formula: CAKE SLUDGE DRY TONS = Wet lbs. removed x % Solids x Sp. Gr. (1.05) / 2,000 lbs. Solids Determination: The value for % solids will be determined by the Owner’s lab or by a certified testing laboratory. This is at no cost to the Contractor.
10/15/2026 05:00 PM UTC
New Well #7
Project consists of a new "rock" well #7 with a proposed rated capacity of 1,000 gpm, well pump testing / report and associated improvements including waterline connection to well, vertical turbine well pump with submersible motor, pitless adapter, utility rack for electrical equipment mounting, in-well water level sensor, valve / meter vault, and ancillary items. The City will be providing finished grade and will be adding approximately 3 feet of compacted material during or after the project.
10/22/2026 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
SR-31 Improvements, Phase 1 (PID 101063)
The project consists of the following: • Reconfiguration (from four (4) to five (5) lanes) of SR 31 starting north of the US 33 westbound ramp and terminating at Mill Road – approximately 650 linear feet • Reconfiguration (from three (3) to five (5) lanes) of SR 31 starting just at the SR 31 / Mill Road intersection to the Mill Wood Boulevard intersection – approximately 900 linear feet • Southbound turn lane installation north of Mill Wood Boulevard – approximately 900 linear feet • The project will include also curbing, storm sewer installation, striping, signage, street lighting, traffic signal replacement, sidewalk (west side from Mill Road to Mill Wood Boulevard) and shared use path (east side from Mill Road to Mill Wood Boulevard).
03/14/2018 07:30 PM UTC
Coleman's Crossing Traffic Signal
The project consists of the installation of a new traffic signal at the intersection of Coleman’s Crossing Blvd and East 5th Street/Charles Lane and includes the following: Combination signal support poles and signal heads. Traffic signal controller and cabinet. Installation of fiber optic cable and video detection system. Other necessary construction items related to traffic signal installation.
03/02/2018 07:00 PM UTC
2018 Paving Program
City of Marysville annual resurfacing program. This project includes the following: 1) Pavement resurfacing of approximately 19,000 LF of roadway. 2) Approximately 7,000 LF of curb, 57 curb ramps, and 5,000 SF of sidewalk. 3) Installation of pavement markings
03/02/2018 07:00 PM UTC
West 5th Street Sidewalk Improvements
Sidewalk improvements including approx. 9,100 SF fo sidewalk and 9 curb ramps. This project is being funded by ODOT's Safe Routes to School Program.
11/16/2017 06:00 PM UTC
Mill Valley Stormwater Improvements
The City of Marysville Mill Valley Stormwater Improvement project includes the following: Removal of two (2) stormwater detention basins by filling in the detention basins with suitable fill material to the proposed elevations and the removal of a non-functioning stormwater pump station, including all associated storm piping, storm structures and electrical items. Installation of approximately 1200 linear feet of storm sewer ranging from 12” to 48” in diameter, 8 storm manholes and 1 storm headwall. Necessary restoration (including fencing, topsoil, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better.
08/28/2017 05:30 PM UTC
Coleman's Crossing Traffic Signal
The project consists of the installation of a new traffic signal at the intersection of Coleman’s Crossing Blvd and East 5th Street/Charles Lane and includes the following: Combination signal support poles and signal heads. Traffic signal controller and cabinet. Installation of fiber optic cable and video detection system. Other necessary construction items related to traffic signal installation.
08/23/2017 06:00 PM UTC
33 Innovation Park, Phase 1
The 33 Innovation Park, Phase 1 project consists of the installation of a new public roadway (including curbing and an asphalt multi-use path) and associated public utilities (sanitary sewer, waterline, and storm sewer). The project also includes the widening of Industrial Parkway for a proposed turn lane. The City's approximate budget for this project is $1,600,000.
06/21/2017 05:30 PM UTC
Water Division 2017 Materials
City of Marysville Division of Water 2017 Materials Contract
04/24/2017 05:00 PM UTC
City of Marysville South Court Street and West 6th Street Waterline Replacment
City of Marysville Capital Improvement Project involving waterline replacement along sections of South Court Street and West 6th Street.
04/11/2017 05:30 PM UTC
City of Marysville 2017 Paving Program
City of Marysville's annual paving program.
03/21/2017 06:00 PM UTC
131 - 140 of 140 Solicitations
1 2 … 6 7 8 9 10 11 12 14 Next →