General Info

Business Logo

City of Marysville, Ohio

209 S Main St, Marysville, OH 43040-1553
(937) 645-7350


Upcoming Solicitations

Number Deadline
2026 Removal of Water Treatment Plant Lime Lagoon Sludge Residuals
The purpose of this project is to remove the lime sludge from the water treatment plant’s lime sludge lagoon by means of pumping techniques for the City of Marysville. The quantities of sludge to be paid for under this contract shall be the calculated number of dry tons of sludge removed from the City’s lime sludge lagoon in accordance with the specifications herein and measured for payment as specified. Calculation of dry solids shall be by the following formula: CAKE SLUDGE DRY TONS = Wet lbs. removed x % Solids x Sp. Gr. (1.05) / 2,000 lbs. Solids Determination: The value for % solids will be determined by the Owner’s lab or by a certified testing laboratory. This is at no cost to the Contractor.
10/15/2026 05:00 PM UTC
New Well #7
Project consists of a new "rock" well #7 with a proposed rated capacity of 1,000 gpm, well pump testing / report and associated improvements including waterline connection to well, vertical turbine well pump with submersible motor, pitless adapter, utility rack for electrical equipment mounting, in-well water level sensor, valve / meter vault, and ancillary items. The City will be providing finished grade and will be adding approximately 3 feet of compacted material during or after the project.
10/22/2026 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
Warner Road Utilities, Phase 1
This project entails the extension of sanitary and water along Warner Road. The sanitary sewer will be extended from the east side of the City’s Pump Station #2, which is currently under construction and located just north of Kile Ditch. The sewer will run south along the west side of Industrial Drive for approximately 725-feet to Warner Road. The sewer will run along the south side of Warner Road from Industrial Drive for approximately 3,700-feet. The water main will be extended south along Warner Road from the terminus of the existing 12” water main on the north side of the road, which terminates at the west end of the existing Warner Industrial Corporate Center on the north side of Warner Road. The water main will be extended approximately 2,400-feet along Warner Road. The date of Substantial Completion and the Engineer's Estimate are now listed in Addendum #1
04/29/2022 05:30 PM UTC
Fourth Street Bridge Replacement
The project will replace the existing reinforced concrete slab structure on 4th street over town run with a 14' x 10' precast reinforced concrete box culvert. The project includes full depth pavement replacement, curb and gutter, concrete sidewalk, building repairs, and other improvements. The total project length is 275 feet. The date of Substantial Completion is November 30, 2022, and the date of readiness for final payment is December 31, 2022. The City's Estimate is $749.500.00
04/06/2022 05:15 PM UTC
2022 Paving Program
City of Marysville annual resurfacing program. This project includes the following: 1) Pavement resurfacing of approximately 21,000 LF of roadway. 2) Approximately 6,000 LF of curb, 41 curb ramps, and 5,000 SF of sidewalk. 3) Installation of pavement markings
03/25/2022 06:00 PM UTC
Walnut Street Culvert Replacement
-Installation of a 49' long 16'X7' box culvert under Walnut Street - Necessary restoration (including asphalt and curb replacement, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. City Estimate: $320,000
03/11/2022 06:00 PM UTC
Uptown Alley Improvements
This project consists of: - Removal of the existing asphalt within the alley followed by construction of a brick alley partially utilizing reclaimed bricks. - Installation of a dumpster and grease trap enclosure, decorative fencing, trench drain, planter beds, string lighting, and outdoor seating. - Necessary restoration (including asphalt, driveway, sidewalk and curb replacement, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. Engineer's Estimate: $617,487.50
01/19/2022 06:00 PM UTC
Fladt Rd Booster Pump Station
Project consists of two (2) new 40 hp (800 gpm) horizontal split case pumps, electric valves, instruments, and miscellaneous piping to provide boosted pressure to the south distribution area including the new Jerome Township Elevated Storage Tank. The work is located in the pedestal of the existing Fladt Road Elevated Storage Tank. An optional site visit / pre-bid meeting will be held on Tuesday, December 7th at 10:00 am at the Fladt Road Elevated Storage Tank.
12/16/2021 07:00 PM UTC
2022 Water Treatment Chemicals - Liquid Oxygen (pure)
The work consists of providing Liquid Oxygen for the City of Marysville Water Treatment Facility operations during the 2022 calendar year.
11/23/2021 03:01 PM UTC
2022 Water Treatment Chemicals - Bulk Soda Ash
The work consists of providing Bulk Soda Ash for the City of Marysville Water Treatment Facility operations during the 2022 calendar year: The ESTIMATED quantity is 2,500.000 lbs.
11/23/2021 03:01 PM UTC
2022 Water Treatment Chemicals - Sodium Metabisulfite for ozone quench
The work consists of providing Sodium Metabisulfite for ozone quench for the City of Marysville Water Treatment Facility operations during the 2022 calendar year:
11/23/2021 03:01 PM UTC
2022 Water Treatment Chemicals - Sodium hydroxide for pH adjustment, 50% strength
The work consists of providing Sodium hydroxide for the City of Marysville Water Treatment Facility operations during the 2022 calendar year.
11/23/2021 03:01 PM UTC
51 - 60 of 140 Solicitations
1 2 3 4 6 8 9 10 … 13 14