General Info

Business Logo

City of Marysville, Ohio

209 S Main St, Marysville, OH 43040-1553
(937) 645-7350


Upcoming Solicitations

Number Deadline
301 N. Main Street Parking Lot
The construction of a new public parking lot located at 301 N. Main Street in uptown Marysville. Construction of the proposed parking lot includes the following items: clearing/grubbing, drive apron removal, sidewalk removal, pavement installation, curb installation, under drain installation, pavement markings, and permanent seeding. ENGINEER'S ESTIMATE: $235,754.08
11/25/2026 08:00 PM UTC
Aldersgate Park Restroom
This project is intending to construct a pre-engineered building to serve as a restroom at Aldersgate Park for the City of Marysville. Plans for the building construction and provided material can be found on Bid Express. Construction of the building will include; Site preparation, construction of building foundation per the Aldersgate Park Restroom plans, building assembly and connection to electric, city water and sewer which will be installed to the building location by the City of Marysville prior to construction VIRTUAL MEETING INVITE (Google Meets) Aldersgate Park Restroom Pre-Bid Meeting Friday, November 13 · 1:30 – 2:30pm Time zone: America/New_York Google Meet joining info Video call link: https://meet.google.com/czn-mhyy-bmo Or dial: ‪(US) +1 904-580-8941‬ PIN: ‪536 275 083‬# More phone numbers: https://tel.meet/czn-mhyy-bmo?pin=3480709781280
11/25/2026 08:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
2022 Water Treatment Chemicals - Ferric Chloride (Bulk)
The work consists of providing Ferric Chloride (Bulk) for the City of Marysville Water Treatment Facility operations during the 2022 calendar year: The ESTIMATED quantity is 52,000 lbs.
11/23/2021 03:01 PM UTC
2022 Water Treatment Chemicals - Sodium hypochlorite
The work consists of providing Sodium hypochlorite for the City of Marysville Water Treatment Facility operations during the 2022 calendar year.
11/23/2021 03:01 PM UTC
2022 Water Treatment Chemicals - Powder Activated Carbon, Bulk
The work consists of providing Powder Activated Carbon for the City of Marysville Water Treatment Facility operations during the 2022 calendar year:
11/23/2021 03:01 PM UTC
2022 Wastewater Treatment Chemicals - Ferric Chloride Solution
The work consists of providing Ferric Chloride Solution for the City of Marysville Water Reclamation Facility operations during the 2022 calendar year: The ESTIMATED quantity is 110,000 gallons.
11/23/2021 03:00 PM UTC
2022 Wastewater Treatment Chemicals - Nitrate Solution
The work consists of providing Nitrate Solution for the City of Marysville Wastewater Reclamation Facility operations during the 2022 calendar year. The ESTIMATED quantity is 100,000 gallons.
11/23/2021 03:00 PM UTC
2022 Wastewater Treatment Chemicals - Propane
The work consists of providing Propane for the City of Marysville Water Reclamation Facility operations during the 2022 calendar year. The ESTIMATED quantity is 110,000 gallons
11/23/2021 03:00 PM UTC
New Well # 6
Project consists of a new "rock" well #6 with a proposed rated capacity of 1,000 gpm and associated improvements including waterline connection to well, 16' x 10' (nominal) pre-cast concrete well house (complete with elecrical lighting, heat, ventilation, etc.), vertical turbine well pump, motor, water level sensor, flow meter, and anscillary items.
10/14/2021 06:00 PM UTC
Water Reclamation Facility Garage
The project consists of the installation of the following: • Construction of a 4800 square foot storage/work garage. • Associated site improvements related to the construction of the new garage such as asphalt paving extension. • New sanitary and water service lines. • Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. Engineer's Estimate: $1,450,000
08/02/2021 08:00 PM UTC
Uptown Alley Improvements
This project consists of: - Removal of the existing asphalt within the alley followed by construction of a brick alley partially utilizing reclaimed bricks. - Installation of a dumpster and grease trap enclosure, decorative fencing, planter beds, string lighting, and outdoor seating. - Necessary restoration (including asphalt, driveway, sidewalk and curb replacement, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. Engineer's Estimate: $606,820
07/30/2021 05:00 PM UTC
Restroom & Concessions Building - Union County Joint Recreation District
The City of Marysville has purchased the materials for a pre-engineered building for the Union County Joint Recreation District. The selected contractor will be responsible for the building installation of the 1,000 Sq. Ft. pre-engineered structure as per plan.
07/06/2021 05:00 PM UTC
71 - 80 of 145 Solicitations
1 2 3 4 5 6 8 10 11 12 13 14 15