City of Marysville, Ohio
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
| Name * | Description | |
|---|---|---|
| 2016 odot construction and material specifications.pdf (6.83 MB) | ||
| general plan notes.pdf (18 KB) | ||
| public roadway plan notes.pdf (46.2 KB) | ||
| sanitary sewer plan notes.pdf (50.5 KB) | ||
| storm sewer plan notes.pdf (48.5 KB) | ||
| water plan notes.pdf (47.8 KB) | ||
| sanitary sewer specifications.pdf (1.1 MB) | ||
| water specifications.pdf (9.63 MB) | ||
| sanitary sewer standard drawings.pdf (1.66 MB) | ||
| stormwater standard drawings.pdf (2.11 MB) | ||
| street standard drawings.pdf (3.52 MB) | ||
| water standard drawings.pdf (2.37 MB) | ||
| marysville supplemental specifcations.pdf (773 KB) | ||
| stormwater drainage manual.pdf (2.89 MB) | ||
| marysville_2017 w-9.pdf (75.7 KB) | ||
| Number | Deadline |
|---|---|
|
301 N. Main Street Parking Lot
The construction of a new public parking lot located at 301 N. Main Street in uptown Marysville. Construction of the proposed parking lot includes the following items: clearing/grubbing, drive apron removal, sidewalk removal, pavement installation, curb installation, under drain installation, pavement markings, and permanent seeding.
ENGINEER'S ESTIMATE: $235,754.08
| 11/25/2026 08:00 PM UTC |
|
Aldersgate Park Restroom
This project is intending to construct a pre-engineered building to serve as a restroom at Aldersgate Park for the City of Marysville. Plans for the building construction and provided material can be found on Bid Express.
Construction of the building will include; Site preparation, construction of building foundation per the Aldersgate Park Restroom plans, building assembly and connection to electric, city water and sewer which will be installed to the building location by the City of Marysville prior to construction
VIRTUAL MEETING INVITE (Google Meets)
Aldersgate Park Restroom Pre-Bid Meeting
Friday, November 13 · 1:30 – 2:30pm
Time zone: America/New_York
Google Meet joining info
Video call link: https://meet.google.com/czn-mhyy-bmo
Or dial: (US) +1 904-580-8941 PIN: 536 275 083#
More phone numbers: https://tel.meet/czn-mhyy-bmo?pin=3480709781280
| 11/25/2026 08:00 PM UTC |
| Number | Deadline |
|---|---|
|
2021 Removal of Water Treatment Plant Lime Lagoon Sludge Residuals
The purpose of this project is to remove the lime sludge from the water treatment plant’s lime sludge lagoon by means of pumping techniques for the City of Marysville.
The quantities of sludge to be paid for under this contract shall be the calculated number of dry tons of sludge removed from the City’s lime sludge lagoon in accordance with the specifications herein and measured for payment as specified.
Calculation of dry solids shall be by the following formula:
CAKE SLUDGE DRY TONS = Wet lbs. removed x % Solids x Sp. Gr. (1.05) / 2,000 lbs.
Solids Determination: The value for % solids will be determined by the Owner’s lab or by a certified testing laboratory. This is at no cost to the Contractor.
| 07/02/2021 01:00 PM UTC |
|
2021 Utility Improvements
Engineer's Estimate: $3,630,000
This project will consist of:
Phase B: Water Treatment Plant Offsite Utilities (Bid items 1 - 50)
- Installation of approximately 2000 linear feet of 24” HDPE waterline (1900’ via open cut and 100’ via jack and bore), 5050 linear feet of 20” HDPE waterline (4735’ via open cut and 315’ via jack and bore), 1610 linear feet of 16” HDPE waterline (940’ via open cut and 670’ via directional drilling)
-Waterline infrastructure will also include two 24” gate valves, four 20” gate valves, 13 hydrants,
-Installation of approximately 1355 linear feet of 6” HDPE force main (685’ via open cut and 670’ via directional drilling).
-Force main infrastructure will also include the installation of 2 air release valves
-Installation of roadway infrastructure including timber guard rail, 500’ of curb, and a curb inlet
-Necessary restoration including driveway replacement, full depth pavement repair, seeding and mulching, and any other items necessary to restore the work area to its original or better condition
Phase A: West 5th Street Waterline Replacement (Bid items 51 - 84)
- Installation of approximately 1,180 linear feet of 8” C909 waterline pipe, 5 fire hydrant assemblies, and all associated waterline appurtenances.
-Relocation of 21 (1"") service taps, 1 (2"") service tap, 1 (3"") service tap, and 1 (8"") service tap.
- Proper abandonment of existing waterline and the removal of existing main line valves and fire hydrants assemblies.
-Necessary restoration including driveway replacement, full depth pavement repair, seeding and mulching, and any other items necessary to restore the work area to its original or better condition
| 06/11/2021 05:15 PM UTC |
|
Jerome Township Water Tower
The project consists of the following:
Constructing a new composite elevated storage tank with a capacity of 1.5 million gallons.
Site work includes the extension of several utilities that are being constructed at an adjacent construction site (Marysville Pump Station #2) as follows:
Access driveway
16-inch waterline
120 volt electric service
Fiberoptic line
Sanitary sewer from the tank
Natural Gas
Engineer's Estimate: $4,500,000.00
Pre-Bid Virtual Meeting (Info to Join) (5/19 @: 2PM)
meet.google.com/qua-yahk-eav
+1 929-260-4310
PIN: 153 531 647#
| 06/11/2021 05:15 PM UTC |
|
Pump Station # 2
The Pump Station #2 Improvements project will replace the City’s current Pump Station #2 with a pump station that will meet the ever-increasing sewer capacity demands within the southeastern portion of Union County. The existing Pump Station #2 is a 0.5 MGD pump station and is nearing its maximum capacity. The new pump station has a 1.5 MGD pumping capacity and is designed to expand (if needed) in the future to pump up to 2.5 MGD.
Engineer's Cost Estimate: $6,474,000.00
| 06/11/2021 05:15 PM UTC |
|
Hickory Run - Storm Sewer Improvements
- Installation of 400 LF of storm sewer (12", 24", & 36"), a headwall, and 3 manholes along Hickory Gate Drive
-Installation of a 52' long 8'X4' box culvert under Pepperbush Court
- Necessary restoration (including asphalt, driveway, sidewalk and curb replacement, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better.
Engineer's Estimate: $450,000
| 06/11/2021 05:00 PM UTC |
|
Uptown Alley Improvements
This project consists of:
- Removal of the existing asphalt within the alley followed by construction of a brick alley partially utilizing reclaimed bricks.
- Installation of a dumpster and grease trap enclosure, decorative fencing, planter beds, string lighting, and outdoor seating.
- Necessary restoration (including asphalt, driveway, sidewalk and curb replacement, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better.
Engineer's Estimate: $548,320.00
| 05/21/2021 05:00 PM UTC |
|
State Route 4 & Scott Farms Blvd Traffic Signal
City of Marysville Capital Improvement Project
| 04/06/2021 05:00 PM UTC |
|
S.R. 38 IMPROVEMENTS - PHASE 1
The Project consists of 1,213-ft of pavement edge removal and replacement with 18-inch straight curb, upgrading pedestrian facilities, storm improvements, lighting installation, resurfacing, and other miscellaneous related improvements. Engineer's Estimate is $825,000 (Base Bid)
An additional alternate bid project consist of 433-ft of sidewalk extension, drive reconstructions, and storm improvements. Engineer's Estimate is $111,000 (Alternate #1)
| 03/26/2021 07:00 PM UTC |
|
2021 Paving Program
The project consists of the following 2 projects:
1) City Paving Project includes
• Pavement planing and resurfacing of approximately
19,400 LF of roadway
• Approximately 3,500 SF of concrete sidewalk
including 43 curb ramps and approx. 3,600 LF of
curb
2) CDBG Sidewalk Improvements
• Approximately 8,600 SF of concrete sidewalk
including 8 curb ramps and approx. 800 LF of curb
| 03/26/2021 07:00 PM UTC |
|
Columbus Avenue Roadway Improvements, Phase 1
The project consists of the following:
• Roadway – 2,200 feet of roadway improvements along Columbus Avenue.
• Roadway improvements include pavement resurfacing, new curbing, drive approaches, sidewalks, asphalt shared use path, street lighting, and storm sewer.
• Storm Sewer – approximately 2,900 feet of new storm sewer, 18 new storm structures
• Maintenance of traffic to facilitate the construction of these improvements
• Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better.
The Engineer's Estimate is $2,170,000
| 03/12/2021 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.