General Info

Business Logo

City of Marysville, Ohio

209 S Main St, Marysville, OH 43040-1553
(937) 645-7350


Upcoming Solicitations

Number Deadline
2026 Removal of Water Treatment Plant Lime Lagoon Sludge Residuals
The purpose of this project is to remove the lime sludge from the water treatment plant’s lime sludge lagoon by means of pumping techniques for the City of Marysville. The quantities of sludge to be paid for under this contract shall be the calculated number of dry tons of sludge removed from the City’s lime sludge lagoon in accordance with the specifications herein and measured for payment as specified. Calculation of dry solids shall be by the following formula: CAKE SLUDGE DRY TONS = Wet lbs. removed x % Solids x Sp. Gr. (1.05) / 2,000 lbs. Solids Determination: The value for % solids will be determined by the Owner’s lab or by a certified testing laboratory. This is at no cost to the Contractor.
10/15/2026 05:00 PM UTC
New Well #7
Project consists of a new "rock" well #7 with a proposed rated capacity of 1,000 gpm, well pump testing / report and associated improvements including waterline connection to well, vertical turbine well pump with submersible motor, pitless adapter, utility rack for electrical equipment mounting, in-well water level sensor, valve / meter vault, and ancillary items. The City will be providing finished grade and will be adding approximately 3 feet of compacted material during or after the project.
10/22/2026 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
Uptown Alley Improvements
This project consists of: - Removal of the existing asphalt within the alley followed by construction of a brick alley partially utilizing reclaimed bricks. - Installation of a dumpster and grease trap enclosure, decorative fencing, planter beds, string lighting, and outdoor seating. - Necessary restoration (including asphalt, driveway, sidewalk and curb replacement, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. Engineer's Estimate: $548,320.00
05/21/2021 05:00 PM UTC
State Route 4 & Scott Farms Blvd Traffic Signal
City of Marysville Capital Improvement Project
04/06/2021 05:00 PM UTC
S.R. 38 IMPROVEMENTS - PHASE 1
The Project consists of 1,213-ft of pavement edge removal and replacement with 18-inch straight curb, upgrading pedestrian facilities, storm improvements, lighting installation, resurfacing, and other miscellaneous related improvements. Engineer's Estimate is $825,000 (Base Bid) An additional alternate bid project consist of 433-ft of sidewalk extension, drive reconstructions, and storm improvements. Engineer's Estimate is $111,000 (Alternate #1)
03/26/2021 07:00 PM UTC
2021 Paving Program
The project consists of the following 2 projects: 1) City Paving Project includes • Pavement planing and resurfacing of approximately 19,400 LF of roadway • Approximately 3,500 SF of concrete sidewalk including 43 curb ramps and approx. 3,600 LF of curb 2) CDBG Sidewalk Improvements • Approximately 8,600 SF of concrete sidewalk including 8 curb ramps and approx. 800 LF of curb
03/26/2021 07:00 PM UTC
Columbus Avenue Roadway Improvements, Phase 1
The project consists of the following: • Roadway – 2,200 feet of roadway improvements along Columbus Avenue. • Roadway improvements include pavement resurfacing, new curbing, drive approaches, sidewalks, asphalt shared use path, street lighting, and storm sewer. • Storm Sewer – approximately 2,900 feet of new storm sewer, 18 new storm structures • Maintenance of traffic to facilitate the construction of these improvements • Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better. The Engineer's Estimate is $2,170,000
03/12/2021 07:00 PM UTC
Marysville Bridge Design RFQ
The City of Marysville, Ohio, wishes to receive Letters of Interest (LOI) from an Engineering Consultant (or team including sub-consultants) to assist the City with the East 4th Street Bridge Replacement and the new Mill Valley/Upland Reservoir Pedestrian Connector Path and Bridge projects. The project scope shall be sufficient to prepare all final construction documents including the necessary survey, soils testing, calculations, permitting (Ohio EPA, Army Corps, Jerome Township, and Union County Building Department, etc.) and construction services for both the East 4th Street Bridge Replacement and the Mill Valley/Upland Reservoir Pedestrian Connector Path and Bridge. The project will consist of two areas of interest. The first portion of the project will consist of the design, removal, and replacement of the East Fourth Street Bridge over Town Run between Plum Street and Walnut Street. The second portion of the project is the new Mill Valley/Upland Reservoir Pedestrian Connector Path and Bridge. This portion of the project includes the installation of 4,562 feet of 10 foot wide trail and a bridge that will span Mill Creek. The proposed bridge will have an approximate length of 170 feet. All submittals should be emailed directly to the Assistant City Engineer, Chad Green, P.E. (cgreen@marysvilleohio.org) by 4:00 p.m. on Friday, February 5, 2021
02/05/2021 09:00 PM UTC
2021 Propane
The work consists of providing PROPANE for the City of Marysville Wastewater Reclamation Facility operations during the 2021 calendar year:
11/24/2020 03:00 PM UTC
2021 Nitrate Solution
The work consists of providing NITRATE SOLUTION for the City of Marysville Wastewater Reclamation Facility operations during the 2021 calendar year:
11/24/2020 03:00 PM UTC
2021 Ferric Chloride Solution
The work consists of providing FERRIC CHLORIDE SOLUTION for the City of Marysville Wastewater Reclamation Facility operations during the 2021 calendar year:
11/24/2020 03:00 PM UTC
2021 Pebble Lime
The work consists of providing Pebble Lime (estimated quantity is 3,000,000 lbs.) for the City of Marysville's water treatment plant operations during the 2021 calendar year
11/24/2020 03:00 PM UTC
81 - 90 of 140 Solicitations
1 2 … 5 6 7 9 11 12 13 14