City of Marysville, Ohio
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
209 S Main St, Marysville, OH 43040-1553
(937) 645-7350
| Name * | Description | |
|---|---|---|
| 2016 odot construction and material specifications.pdf (6.83 MB) | ||
| general plan notes.pdf (18 KB) | ||
| public roadway plan notes.pdf (46.2 KB) | ||
| sanitary sewer plan notes.pdf (50.5 KB) | ||
| storm sewer plan notes.pdf (48.5 KB) | ||
| water plan notes.pdf (47.8 KB) | ||
| sanitary sewer specifications.pdf (1.1 MB) | ||
| water specifications.pdf (9.63 MB) | ||
| sanitary sewer standard drawings.pdf (1.66 MB) | ||
| stormwater standard drawings.pdf (2.11 MB) | ||
| street standard drawings.pdf (3.52 MB) | ||
| water standard drawings.pdf (2.37 MB) | ||
| marysville supplemental specifcations.pdf (773 KB) | ||
| stormwater drainage manual.pdf (2.89 MB) | ||
| marysville_2017 w-9.pdf (75.7 KB) | ||
| Number | Deadline |
|---|---|
|
2026 Removal of Water Treatment Plant Lime Lagoon Sludge Residuals
The purpose of this project is to remove the lime sludge from the water treatment plant’s lime sludge lagoon by means of pumping techniques for the City of Marysville.
The quantities of sludge to be paid for under this contract shall be the calculated number of dry tons of sludge removed from the City’s lime sludge lagoon in accordance with the specifications herein and measured for payment as specified.
Calculation of dry solids shall be by the following formula:
CAKE SLUDGE DRY TONS = Wet lbs. removed x % Solids x Sp. Gr. (1.05) / 2,000 lbs.
Solids Determination: The value for % solids will be determined by the Owner’s lab or by a certified testing laboratory. This is at no cost to the Contractor.
| 10/15/2026 05:00 PM UTC |
|
New Well #7
Project consists of a new "rock" well #7 with a proposed rated capacity of 1,000 gpm, well pump testing / report and associated improvements including waterline connection to well, vertical turbine well pump with submersible motor, pitless adapter, utility rack for electrical equipment mounting, in-well water level sensor, valve / meter vault, and ancillary items. The City will be providing finished grade and will be adding approximately 3 feet of compacted material during or after the project.
| 10/22/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
Uptown Alley Improvements
This project consists of:
- Removal of the existing asphalt within the alley followed by construction of a brick alley partially utilizing reclaimed bricks.
- Installation of a dumpster and grease trap enclosure, decorative fencing, planter beds, string lighting, and outdoor seating.
- Necessary restoration (including asphalt, driveway, sidewalk and curb replacement, seeding, plantings, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better.
Engineer's Estimate: $548,320.00
| 05/21/2021 05:00 PM UTC |
|
State Route 4 & Scott Farms Blvd Traffic Signal
City of Marysville Capital Improvement Project
| 04/06/2021 05:00 PM UTC |
|
S.R. 38 IMPROVEMENTS - PHASE 1
The Project consists of 1,213-ft of pavement edge removal and replacement with 18-inch straight curb, upgrading pedestrian facilities, storm improvements, lighting installation, resurfacing, and other miscellaneous related improvements. Engineer's Estimate is $825,000 (Base Bid)
An additional alternate bid project consist of 433-ft of sidewalk extension, drive reconstructions, and storm improvements. Engineer's Estimate is $111,000 (Alternate #1)
| 03/26/2021 07:00 PM UTC |
|
2021 Paving Program
The project consists of the following 2 projects:
1) City Paving Project includes
• Pavement planing and resurfacing of approximately
19,400 LF of roadway
• Approximately 3,500 SF of concrete sidewalk
including 43 curb ramps and approx. 3,600 LF of
curb
2) CDBG Sidewalk Improvements
• Approximately 8,600 SF of concrete sidewalk
including 8 curb ramps and approx. 800 LF of curb
| 03/26/2021 07:00 PM UTC |
|
Columbus Avenue Roadway Improvements, Phase 1
The project consists of the following:
• Roadway – 2,200 feet of roadway improvements along Columbus Avenue.
• Roadway improvements include pavement resurfacing, new curbing, drive approaches, sidewalks, asphalt shared use path, street lighting, and storm sewer.
• Storm Sewer – approximately 2,900 feet of new storm sewer, 18 new storm structures
• Maintenance of traffic to facilitate the construction of these improvements
• Necessary restoration (including grading, seeding, erosion control, etc.) and other miscellaneous items required to restore the area to its original condition, or better.
The Engineer's Estimate is $2,170,000
| 03/12/2021 07:00 PM UTC |
|
Marysville Bridge Design RFQ
The City of Marysville, Ohio, wishes to receive Letters of Interest (LOI) from an Engineering Consultant (or team including sub-consultants) to assist the City with the East 4th Street Bridge Replacement and the new Mill Valley/Upland Reservoir Pedestrian Connector Path and Bridge projects. The project scope shall be sufficient to prepare all final construction documents including the necessary survey, soils testing, calculations, permitting (Ohio EPA, Army Corps, Jerome Township, and Union County Building Department, etc.) and construction services for both the East 4th Street Bridge Replacement and the Mill Valley/Upland Reservoir Pedestrian Connector Path and Bridge.
The project will consist of two areas of interest. The first portion of the project will consist of the design, removal, and replacement of the East Fourth Street Bridge over Town Run between Plum Street and Walnut Street. The second portion of the project is the new Mill Valley/Upland Reservoir Pedestrian Connector Path and Bridge. This portion of the project includes the installation of 4,562 feet of 10 foot wide trail and a bridge that will span Mill Creek. The proposed bridge will have an approximate length of 170 feet.
All submittals should be emailed directly to the Assistant City Engineer, Chad Green, P.E. (cgreen@marysvilleohio.org) by 4:00 p.m. on Friday, February 5, 2021
| 02/05/2021 09:00 PM UTC |
|
2021 Propane
The work consists of providing PROPANE for the City of Marysville Wastewater Reclamation Facility operations during the 2021 calendar year:
| 11/24/2020 03:00 PM UTC |
|
2021 Nitrate Solution
The work consists of providing NITRATE SOLUTION for the City of Marysville Wastewater Reclamation Facility operations during the 2021 calendar year:
| 11/24/2020 03:00 PM UTC |
|
2021 Ferric Chloride Solution
The work consists of providing FERRIC CHLORIDE SOLUTION for the City of Marysville Wastewater Reclamation Facility operations during the 2021 calendar year:
| 11/24/2020 03:00 PM UTC |
|
2021 Pebble Lime
The work consists of providing Pebble Lime (estimated quantity is 3,000,000 lbs.) for the City of Marysville's water treatment plant operations during the 2021 calendar year
| 11/24/2020 03:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.