General Info

Business Logo

Port of Lake Charles

1161 W Sallier Street, Lake Charles, LA 70601
(337) 439-3661 x3538

The Port and the Calcasieu Ship Channel offer reliable shipping with proven historical performance—and are prepared for future growth. More than $108 billion in industrial projects have been recently completed, underway or announced on and around the Port and Calcasieu Ship Channel areas because of their capabilities and capacity, making it one of the fastest growing gulf coast ports in the United States.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CP26001
Statement of Qualifications for Industrial Lead Railroad Rehabilitation
04/10/2026 10:00 PM UTC
CP26002
Statement of Qualifications for Shed 8 Access Road Reconstruction at City Docks
04/10/2026 10:00 PM UTC
CP26003
Statement of Qualifications for Industrial Canal Heavy Cargo Logistics Enhancement
04/10/2026 10:00 PM UTC
CP25011
Bulk Terminal No. 1 (BT-1) Dock Modifications for New Portal-Mounted Mobile Harbor Cranes (LPS1) & (LPS2)
04/13/2026 03:00 PM UTC
CP25012
Bulk Terminal No. 1 (BT-1) Site Electrical Upgrades for Main Switchgear & Dockside Equipment
04/13/2026 03:00 PM UTC
CP24008
Industrial Canal Bulk Grain Facility
04/21/2026 03:00 PM UTC
2026-02
SAR or approved equal conveyor belting per the attached specifications. Bids must have freight included in pricing, and a spec sheet showing the DIN value, included with your bid. Any bid without the spec sheet will be considered non responsive.
04/28/2026 03:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
18001-2
Koch Loader Gantry Motor/Gearbox
08/06/2018 03:00 PM UTC
MP18031
PEBCO Chute Repair Parts
08/06/2018 03:00 PM UTC
Switch Ties 2018
Ties shall be new, creosote treated, Grade 5 hardwood and 100% end plated. Cost of tie to include freight to the Port of Lake Charles, 150 Marine Street, Lake Charles, LA 70601. Prices are to be held for (1) year from the date of award.
07/30/2018 03:00 PM UTC
18001-1
Movable Structure
07/16/2018 03:00 PM UTC
2018 Idlers
Idlers shall be CEMA D with an external sealing system, have sealed bearings with grease, shall have a minimum of 1” solid steel shaft, and shall be a minimum of 9 gauge steel, Martin brand or equal. If an alternate brand is quoted, you must attach a separate sheet listing all deviations, and the specification sheet of brand quoted, is requested with bid. All freight shall be included with unit cost. Prices are to be held for (1) year from date of award. Idlers will be purchased in various quantities as needed with freight included. The District reserves the right to make a determination as to the quality of the deviation.
07/06/2018 03:00 PM UTC
2018 Conveyor Belting
Conveyor belting shall be 3 ply or 4 ply as specified on the attached form. All belting shall have a DIN value of 125 or less. Bids must have freight included in pricing, and a spec sheet showing the DIN value, included with your bid. Any bid without the spec sheet will be considered non responsive.
07/03/2018 03:00 PM UTC
18001
Movable Structure
06/25/2018 03:00 PM UTC
CP16008 - CMAR
Request for Qualifications for CMAR - Construction Manager At-Risk for Rehabilitation of Berths 2 & 3 at City Docks
06/13/2018 08:00 PM UTC
CP16002
Shed 17 Ladder Tracks and City Docks Rail Improvements
06/05/2018 03:00 PM UTC
MP18014 - 2
LED Lights for Shed 7
05/14/2018 03:00 PM UTC
141 - 150 of 217 Solicitations
1 2 11 12 13 15 17 18 19 20 21 22