EC-02-10060-26
Storage Tank Removal Project
Paul's Auto Service
Baldwin Township, Allegheny County
Estimated Amount: $0 to $100,000 (Small Business Only)
Term: 90 calendar days
No Bid Bond Required
Principal Items of Work and Approximate Quantities:
Removal of 4 fiberglass underground storage tanks. (Two 8,000 gallon and two 6,000 gallon tanks.)
Four tanks are presumed to be empty (less than an inch of fluid at the last inspection). There may be a need to pump the tanks if water or product is found in them.
A closure report is required as well as closure sampling.
| 11/05/2026 07:00 PM UTC |
|
OOGM FS26-6
Cleaning Out and Plugging Twenty-Three (23) Orphan Gas Wells
Mahoning and Redbank Townships, Armstrong County
Porter and Redbank Townships, Clarion County
Estimated Amount: $1,000,000 to $5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug twenty-three (23) orphan gas wells, estimated to be 1,000-3,600 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 7, 2026, and October 8, 2026, at 9:00 a.m.
Department representatives will meet contractors at:
Gumtown Memorial Park
240 Water Street
New Bethlehem, PA 16242
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 11/12/2026 07:00 PM UTC |
|
OSM 02(1454)102.1
Abandoned Mine Reclamation Project
Beulah Road Wilkins Township (Lucia Drive)
Wilkins Township, Allegheny County
Estimated Amount: $1,000,000 to $5,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.
Clearing and Grubbing, 1 L.S.
Trench Excavation, 2,575 C.Y.
Subsurface Drain – Eight-Inch (8”) Nominal Diameter Perforated PVC SDR-35 Pipe, 1,088 L.F.
Subsurface Drain – Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 78 L.F.
Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 3,680 C.Y.
Subsurface Drain – AASHTO No. 57 Coarse Aggregate, 173 C.Y.
Subsurface Drain – Precast Concrete Inlet, 1 EACH
Subsurface Drain – Precast Concrete Manhole, 1 EACH
Segmented Retaining Wall with Geogrid Reinforcement - Retaining Wall, 3,150 S.F.
Segmented Retaining Wall with Geogrid Reinforcement - Eight-Inch (8") Nominal Diameter Perforated PVC SDR-35 Pipe, 898 L.F.
Concrete Patio Replacement, 250 S.Y.
Site Restoration – Seeding, 1 L.S.
Site Restoration – Topsoil, 20 TON
Site Restoration – Miscellaneous, 1 L.S.
MANDATORY Pre-Bid Conference will be held on: October 28, 2026, at 2:00 PM.
A link is available on the first page of the Final Bid Information to join the Teams Meeting.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 11/12/2026 07:00 PM UTC |
|
OSM 11,65(0948,4371)101.1
Abandoned Mine Reclamation Project
South Nanty Glo 2
Nanty Glo Borough and Jackson Township, Cambria County
Municipality of Murrysville, Westmoreland County
Estimated Amount: $1,000,000 to $5,000,000
Term: 720 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance with Wash Rack, 2 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter), 5,912 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter
Tube,351 L.F.
Clearing and Grubbing, 23.4 ACRE
Grading – Grading, 122,489 C.Y..
Grading – Ripping, 14.4 ACRE
Planting – Planting Preparation, 23.4 ACRE
Planting – Tree Seedlings, 9,790 EACH
Planting – Grass Seed, 713 LB.
Subsurface Drain, 4,520 L.F.
Chimney/Blanket Drain – AASHTO No. 8 Aggregate, 270 TON
Chimney/Blanket Drain – R-4 Rock, 104 S.Y.
Chimney/Blanket Drain – Filter Fabric, 312 S.Y.
Permanent Channel Excavation, 1,626 C.Y.
Erosion Matting, 4,642 S.Y.
Stilling Basin, 231 S.F.
Coal Refuse Disposal, 44,073 C.Y.
Coal Ash Addition – Supply and Delivery, 24,628 TON
Coal Ash Addition – Coordination, 1 L.S.
Coal Ash Addition – Placement, 24,628 TON
Access Road – Construction, 1 L.S.
Access Road – Maintenance Stone, 100 TON
Construction Surveying, Type A, 1 L.S.
| 11/12/2026 07:00 PM UTC |
|
OSM 32(3821)101.1
Abandoned Mine Lands Reclamation Project with Passive Treatment System
State Game Lands 332
Blacklick and Young Townships, Indiana County
Estimated Amount: Greater than $5,000,000
Term: 720 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
AML PRINCIPAL ITEMS:
Diversion and Care of Water, 1 L.S.
Alkaline Addition - Agricultural Limestone - Supply and Delivery, 61,200 TON
Alkaline Addition - Beneficial Ash - Supply and Delivery, 135,000 TON
Alkaline Addition - Application of Alkaline Materials, 196,200 TON
Grading - Area 1, 314,200 C.Y.
Grading - Area 2, 384,700 C.Y.
Grading - Area 3, 126,500 C.Y.
Grading - Area 4, 158,100 C.Y.
Grading - Area 5, 185,800 C.Y.
Diversion Channel and Ford Crossing Excavation, 1,616 C.Y.
Stone Aggregate, 24 TON
Rock Lining - Stream Relocation, 1,814 S.Y.
Rock Lining - Ford Crossing, 212 S.Y.
Seeding - Seed Bed Preparation, 59 ACRE
Seeding - Seed - Type 1, 2,021 LB.
Seeding - Seed - Type 2, 2,847 LB.
Seeding - Mulching, 59 ACRE
Construction Surveying, 1 L.S.
PTS PRINCIPAL ITEMS:
Wet Seal Tie-In – See Schedule of Prices Subitems
H-Flume, 1 L.S.
Agri Drain Smart Drainage Systems® - See Schedule of Prices Subitems
Terraced Iron Formation Channel - See Schedule of Prices Subitems
Holding and Settling Ponds - See Schedule of Prices Subitems
Auto Flushing Vertical Flow Ponds - See Schedule of Prices Subitems
Jennings-Type Vertical Flow Pond - See Schedule of Prices Subitems
Aerobic Wetland - See Schedule of Prices Subitems
Dewatering Basin – See Schedule of Prices Subitems
| 11/12/2026 07:00 PM UTC |
|
AMD 56(2524)104.1
Abandoned Mine Drainage Abatement Project
Oven Run Site B (AFVFP Stone Cleaning)
Shade Township, Somerset County
Estimated Amount: $300,000 to $500,000
Term: 120 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Limestone Bed Aggregate Cleaning – AASHTO No. 1 – 7830 C.Y.
Limestone Coarse Aggregate AASHTO No. 1 – 63 TON
| 11/19/2026 07:00 PM UTC |
|
OOGM 26-2
Cleaning Out and Plugging Twenty-Five (25) Orphan Gas Wells
Wetmore Township, McKean County
Estimated Amount: $1,000,000 to $5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug twenty-five (25) orphan gas wells, estimated to be 1,500 – 2,600 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 27th, 2026, at 9 A.M. & October 28th, 2026, at 10 A.M.
Department representatives will meet contractors at:
Tuesday, October 27th at 9:00 am (Day 1)
Meet at FR295A Stone Pit (See map in bid documents)
Coordinates: 41.721987, -78.818326
Wednesday, October 28th at 10:00 am (Day 2)
Meet at FR279 Stone Pit (Different time and location from day 1. See map in bid documents)
Coordinates: 41.725668, -78.784642
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OFTHE BID.
| 12/03/2026 07:00 PM UTC |
|
OSM 10,43(2910,4508)101.1
Abandoned Mine Reclamation Project
North Liberty South
Slippery Rock Township, Butler County
Liberty Township, Mercer County
Estimated Amount: $300,000 to $500,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 5,000 L.F.
Dewatering Impoundment, 1 L.S.
Clearing and Grubbing, 20 ACRE
Brush Barrier, 730 L.F.
Grading – Grading Area 1, 90,000 C.Y.
Grading – Grading Area 2, 34,000 C.Y.
Planting – Planting Preparation, 20 ACRE
Planting – Grass Seed, 1,200 LB.
Construction Surveying, Type B, 1 L.S.
| 12/03/2026 07:00 PM UTC |
|
OSM 35(2193)101.1
Abandoned Mine Reclamation Project
Rocky Glen Pond
Moosic Borough, Lackawanna County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 300 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Grading – 21,200 Cubic Yards
Backfill Mine Openings – 870 Cubic Yards
Bat Gates – 40 Linear Feet (4 Gates)
Seeding – 12 Acres
| 12/03/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSM 17(6868)101.1
Abandoned Mine Reclamation Project, Smoke Run East, Gulich Township and Ramey Borough, Clearfield County
Estimated Amount: $500,000 to $1,000,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter
Sock, 3,300 L.F.
Access Road – AASHTO No. 1 Coarse Aggregate, 2,600 C.Y.
Access Road – PA DOT 2A Coarse Aggregate, 1,300 C.Y.
Grading, 98,950 C.Y.
Smooth-Interior Corrugated Polyethylene Pipe – Thirty-six Inch (36”) Diameter, 220 L.F.
Walking Trail, 1,330 S.Y.
Tree Planting, 110 Each,
Subsurface Drain – Twelve-Inch (12”) Perforated Smooth-Interior Corrugated
Polyethylene Pipe, 2,010 L.F.
Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 655 C.Y.
| 03/02/2023 07:00 PM UTC |
|
OOGM FS22-20
Cleaning Out and Plugging Nineteen (19) Orphan Gas Wells, Farmington and Highland Townships, Clarion County and Green and Barnett Townships, Forest County
Estimated Amount: $1,000,000-$5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug Nineteen (19) orphan gas wells, estimated to be 660 to 3,300 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: February 7, 2023 at 9:00 a.m.
Department representatives will meet contractors at: Farmington Township Volunteer Fire Co. Parking Lot. 6785 Route 36, Leeper, PA
16233. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 02/23/2023 07:00 PM UTC |
|
OOGM FS22-21
Cleaning Out and Plugging Twenty-Three (23) Orphan Gas Wells, Farmington, Knox, and Washington Townships and Hawthorn Borough, Clarion County
Estimated Amount: $1,000,000 to $5,000,000
Term: 420 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug Twenty Three (23) orphan gas wells, estimated to be 660 to 3,300 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: February 1, 2023, at 9:00 a.m.
Department representatives will meet contractors at: Washington Township Volunteer Fire Hall Parking Lot, 19877 PA-208, Fryburg, PA
16326. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 02/14/2023 07:00 PM UTC |
|
OOGM FS22-22
Cleaning Out and Plugging Twenty (20) Orphan Gas Wells, Beaver, Richland, and Licking Townships, Clarion County
Estimated Amount: $1,000,000 to $5,000,000
Term: 420 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug Twenty (20) orphan gas wells, estimated to be 1,000 to 2,000 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: February 2, 2023, at 9:00 a.m.
Department representatives will meet contractors at: Large Parking Lot Off Knox Exit South of I 80 East. Lat N 41 11’00” Long W-79 32’28”. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 02/14/2023 07:00 PM UTC |
|
OSM 65(1233)101.1
Abandoned Mine Reclamation Project, Delmont Mine, Hempfield Township, Westmoreland County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1
L.S.
Clearing and Grubbing, 1 L.S.
Selective Grading, 1 L.S.
AASHTO No. 57 Aggregate, 50 ton
Seeding, 4,500 S.Y.
| 02/09/2023 07:00 PM UTC |
|
OOGM FS22-14
Cleaning Out and Plugging Nineteen (19) Orphan Gas Wells, Cornplanter Township, Venango County
Estimated Amount: $1,000,000 to $5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug nineteen (19) orphan gas wells, estimated to be 500 to 985 and potentially 4,330 to 5,400 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: January 24th at 9:00 a.m.
Department representatives will meet contractors at: Oil Creek Park Train Station. Lat N 41 28’59” Long W -79 41’31”
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 02/07/2023 07:00 PM UTC |
|
OOGM FS22-15
Cleaning Out and Plugging Nineteen (19) Orphan Gas Wells, Sugarcreek Borough and Cranberry Township, Venango County
Estimated Amount: $1,000,000 to $5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug nineteen (19) orphan gas wells, estimated to be 700 to 985 and 4,330 to 5,400 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: January 25th at 9:00 a.m.
Rte. 322 west of Franklin Pa ½ mile. Large parking lot on west side of road by 121-29780. Lat N41 24’24” Long W-79 51’19”.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 02/07/2023 07:00 PM UTC |
|
OOGM FS22-2
Cleaning Out and Plugging Fourteen (14) Orphan Gas Wells, Cecil, North Franklin, Buffalo, and Canton Townships, Washington County
Estimated Amount: $1,000,000 to $5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug fourteen (14) orphan gas wells, estimated to be 2,000 to 4,607 feet
in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: January 11th and January 12th at 9:00 a.m.
Department representatives will meet contractors at: Washington Crown Center (1500 W Chestnut St, Washington, PA 15301)
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 01/31/2023 07:00 PM UTC |
|
OOGM FS22-7
Cleaning Out and Plugging Seventeen (17) Orphan Gas Wells, Bethel, Kittanning, Manor, Gilpin, and South Buffalo Townships, Armstrong County
Estimated Amount: $1,000,000 to $5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug seventeen (17) orphan gas wells, estimated to be 1,337 to 3,577 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: January 19th at 9:00 a.m.
Department representatives will meet contractors at: Park and Ride off of Rte. 28 Slate Lick exit. (Freeport Rd. South of Rte. 28 in Slate
Lick South Buffalo Township, Freeport, PA 16229)
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 01/31/2023 07:00 PM UTC |
|
OOGM FS22-13
Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells, Boggs, Cowanshannock, Valley, and Wayne Townships, Armstrong County
Estimated Amount: $1,000,000 to $5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug fifteen (15) orphan gas wells, estimated to be 1,337 to 3,577 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: January 18th at 9:00 a.m.
Department representatives will meet contractors at: Vision Hill Worship Center, 13374 US 422, Kittanning, PA 16201
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 01/31/2023 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.