Pennsylvania Department of Environmental Protection
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
EC-02-10060-26
Storage Tank Removal Project
Paul's Auto Service
Baldwin Township, Allegheny County
Estimated Amount: $0 to $100,000 (Small Business Only)
Term: 90 calendar days
No Bid Bond Required
Principal Items of Work and Approximate Quantities:
Removal of 4 fiberglass underground storage tanks. (Two 8,000 gallon and two 6,000 gallon tanks.)
Four tanks are presumed to be empty (less than an inch of fluid at the last inspection). There may be a need to pump the tanks if water or product is found in them.
A closure report is required as well as closure sampling.
| 11/05/2026 07:00 PM UTC |
|
OOGM FS26-6
Cleaning Out and Plugging Twenty-Three (23) Orphan Gas Wells
Mahoning and Redbank Townships, Armstrong County
Porter and Redbank Townships, Clarion County
Estimated Amount: $1,000,000 to $5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug twenty-three (23) orphan gas wells, estimated to be 1,000-3,600 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 7, 2026, and October 8, 2026, at 9:00 a.m.
Department representatives will meet contractors at:
Gumtown Memorial Park
240 Water Street
New Bethlehem, PA 16242
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 11/12/2026 07:00 PM UTC |
|
OSM 02(1454)102.1
Abandoned Mine Reclamation Project
Beulah Road Wilkins Township (Lucia Drive)
Wilkins Township, Allegheny County
Estimated Amount: $1,000,000 to $5,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.
Clearing and Grubbing, 1 L.S.
Trench Excavation, 2,575 C.Y.
Subsurface Drain – Eight-Inch (8”) Nominal Diameter Perforated PVC SDR-35 Pipe, 1,088 L.F.
Subsurface Drain – Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 78 L.F.
Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 3,680 C.Y.
Subsurface Drain – AASHTO No. 57 Coarse Aggregate, 173 C.Y.
Subsurface Drain – Precast Concrete Inlet, 1 EACH
Subsurface Drain – Precast Concrete Manhole, 1 EACH
Segmented Retaining Wall with Geogrid Reinforcement - Retaining Wall, 3,150 S.F.
Segmented Retaining Wall with Geogrid Reinforcement - Eight-Inch (8") Nominal Diameter Perforated PVC SDR-35 Pipe, 898 L.F.
Concrete Patio Replacement, 250 S.Y.
Site Restoration – Seeding, 1 L.S.
Site Restoration – Topsoil, 20 TON
Site Restoration – Miscellaneous, 1 L.S.
MANDATORY Pre-Bid Conference will be held on: October 28, 2026, at 2:00 PM.
A link is available on the first page of the Final Bid Information to join the Teams Meeting.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 11/12/2026 07:00 PM UTC |
|
OSM 11,65(0948,4371)101.1
Abandoned Mine Reclamation Project
South Nanty Glo 2
Nanty Glo Borough and Jackson Township, Cambria County
Municipality of Murrysville, Westmoreland County
Estimated Amount: $1,000,000 to $5,000,000
Term: 720 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance with Wash Rack, 2 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter), 5,912 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter
Tube,351 L.F.
Clearing and Grubbing, 23.4 ACRE
Grading – Grading, 122,489 C.Y..
Grading – Ripping, 14.4 ACRE
Planting – Planting Preparation, 23.4 ACRE
Planting – Tree Seedlings, 9,790 EACH
Planting – Grass Seed, 713 LB.
Subsurface Drain, 4,520 L.F.
Chimney/Blanket Drain – AASHTO No. 8 Aggregate, 270 TON
Chimney/Blanket Drain – R-4 Rock, 104 S.Y.
Chimney/Blanket Drain – Filter Fabric, 312 S.Y.
Permanent Channel Excavation, 1,626 C.Y.
Erosion Matting, 4,642 S.Y.
Stilling Basin, 231 S.F.
Coal Refuse Disposal, 44,073 C.Y.
Coal Ash Addition – Supply and Delivery, 24,628 TON
Coal Ash Addition – Coordination, 1 L.S.
Coal Ash Addition – Placement, 24,628 TON
Access Road – Construction, 1 L.S.
Access Road – Maintenance Stone, 100 TON
Construction Surveying, Type A, 1 L.S.
| 11/12/2026 07:00 PM UTC |
|
OSM 32(3821)101.1
Abandoned Mine Lands Reclamation Project with Passive Treatment System
State Game Lands 332
Blacklick and Young Townships, Indiana County
Estimated Amount: Greater than $5,000,000
Term: 720 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
AML PRINCIPAL ITEMS:
Diversion and Care of Water, 1 L.S.
Alkaline Addition - Agricultural Limestone - Supply and Delivery, 61,200 TON
Alkaline Addition - Beneficial Ash - Supply and Delivery, 135,000 TON
Alkaline Addition - Application of Alkaline Materials, 196,200 TON
Grading - Area 1, 314,200 C.Y.
Grading - Area 2, 384,700 C.Y.
Grading - Area 3, 126,500 C.Y.
Grading - Area 4, 158,100 C.Y.
Grading - Area 5, 185,800 C.Y.
Diversion Channel and Ford Crossing Excavation, 1,616 C.Y.
Stone Aggregate, 24 TON
Rock Lining - Stream Relocation, 1,814 S.Y.
Rock Lining - Ford Crossing, 212 S.Y.
Seeding - Seed Bed Preparation, 59 ACRE
Seeding - Seed - Type 1, 2,021 LB.
Seeding - Seed - Type 2, 2,847 LB.
Seeding - Mulching, 59 ACRE
Construction Surveying, 1 L.S.
PTS PRINCIPAL ITEMS:
Wet Seal Tie-In – See Schedule of Prices Subitems
H-Flume, 1 L.S.
Agri Drain Smart Drainage Systems® - See Schedule of Prices Subitems
Terraced Iron Formation Channel - See Schedule of Prices Subitems
Holding and Settling Ponds - See Schedule of Prices Subitems
Auto Flushing Vertical Flow Ponds - See Schedule of Prices Subitems
Jennings-Type Vertical Flow Pond - See Schedule of Prices Subitems
Aerobic Wetland - See Schedule of Prices Subitems
Dewatering Basin – See Schedule of Prices Subitems
| 11/12/2026 07:00 PM UTC |
|
AMD 56(2524)104.1
Abandoned Mine Drainage Abatement Project
Oven Run Site B (AFVFP Stone Cleaning)
Shade Township, Somerset County
Estimated Amount: $300,000 to $500,000
Term: 120 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Limestone Bed Aggregate Cleaning – AASHTO No. 1 – 7830 C.Y.
Limestone Coarse Aggregate AASHTO No. 1 – 63 TON
| 11/19/2026 07:00 PM UTC |
|
OOGM 26-2
Cleaning Out and Plugging Twenty-Five (25) Orphan Gas Wells
Wetmore Township, McKean County
Estimated Amount: $1,000,000 to $5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug twenty-five (25) orphan gas wells, estimated to be 1,500 – 2,600 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 27th, 2026, at 9 A.M. & October 28th, 2026, at 10 A.M.
Department representatives will meet contractors at:
Tuesday, October 27th at 9:00 am (Day 1)
Meet at FR295A Stone Pit (See map in bid documents)
Coordinates: 41.721987, -78.818326
Wednesday, October 28th at 10:00 am (Day 2)
Meet at FR279 Stone Pit (Different time and location from day 1. See map in bid documents)
Coordinates: 41.725668, -78.784642
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OFTHE BID.
| 12/03/2026 07:00 PM UTC |
|
OSM 10,43(2910,4508)101.1
Abandoned Mine Reclamation Project
North Liberty South
Slippery Rock Township, Butler County
Liberty Township, Mercer County
Estimated Amount: $300,000 to $500,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 5,000 L.F.
Dewatering Impoundment, 1 L.S.
Clearing and Grubbing, 20 ACRE
Brush Barrier, 730 L.F.
Grading – Grading Area 1, 90,000 C.Y.
Grading – Grading Area 2, 34,000 C.Y.
Planting – Planting Preparation, 20 ACRE
Planting – Grass Seed, 1,200 LB.
Construction Surveying, Type B, 1 L.S.
| 12/03/2026 07:00 PM UTC |
|
OSM 35(2193)101.1
Abandoned Mine Reclamation Project
Rocky Glen Pond
Moosic Borough, Lackawanna County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 300 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Grading – 21,200 Cubic Yards
Backfill Mine Openings – 870 Cubic Yards
Bat Gates – 40 Linear Feet (4 Gates)
Seeding – 12 Acres
| 12/03/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSM 64(4272,4271)102.1
Abandoned Mine Reclamation Project, Forest City East - PFBC Access, Forest City Borough, Susquehanna County and Clinton Township, Wayne County
Estimated Amount: $1,000,000 to $5,000,000
Term: 500 Calendar Days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
o Grading – 281,000 cubic yards
o Pipe – 1,400 linear feet
o Drainage Excavation – 3,200 cubic yards
o Rock Lining – 2,400 square yards
o Type D-W Endwalls – 9 each
o Manholes – 2 each
Mandatory Pre-Bid Meeting: BDISBO Training will be held via Teams on Wednesday, June 29,
2022, at 3:00 PM. All plan holders will be provided with the link to this meeting upon the issue. If you are interested in bidding on this project and are not a plan holder, please contact the Construction Contracts Section at 717-772-4016 so that they may provide you with details needed to attend the meeting or contact Construction Contracts via email at RA-ConstructionContr@pa.gov.
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
*Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 6%, VBE - 3%.
If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1.
If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5).
If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5).
Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule.
Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 07/21/2022 06:00 PM UTC |
|
OSM 40,54(1385,3723,3722)101.1
Abandoned Mine Reclamation Project
Audenried Coal to Solar Project - Phase 1
Hazle Township, Luzerne County and
Kline Township, Schuylkill County
Estimated Amount: Greater Than $5,000,000
No Goals Determined
Term: 575 Calendar Days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Removal and Disposal of Structures – 4
Grading, Hauling and Compaction -1,970,130 C.Y.
Disposal of Asbestos Waste – 40 Tons
Drainage Excavation – 2,977 C.Y.
Rock Lining – 620 S.Y.
Seeding – 155 ACRE
| 07/14/2022 06:00 PM UTC |
|
OSM 63(3803)102.1
Abandoned Mine Reclamation Project
Monongahela South No. 1 - Phase 2
City of Monongahela, Washington County
Estimated Amount: $300,000-$500,000
Term: 100 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Excavation and Backfilling
A. Excavation 6,080 CY
B. Backfill 5,830 CY
Subsurface Drains
A. Toe Key 192 LF
Geogrid Reinforcements 23,650 SY
Cast in-place Concrete Driveway 2,752 SF
Gravel Driveway 4,666 SF
MANDATORY Pre-Bid Conference will be held on:
May 3, 2022 at 10:00 a.m.
Department representatives will meet contractors at:
DEP Cambria District Office
286 Industrial Park Road, Ebensburg, PA 15931
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 05/19/2022 06:00 PM UTC |
|
OSM 32(2443)101.1
Abandoned Mine Reclamation Project, Taylorsville South
Green Township, Indiana County
Estimated Amount: $100,000 to $200,000
Small Business Only
Term: 180 Calendar Days
Bid Bond is Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.
Clearing and Grubbing, 1 L.S.
Sealing Mine Entries – Twelve-Inch (12”) PVC Pipe, 80 L.F.
Grading, 2,500 C.Y.
Trench Excavation, 450 C.Y.
Twelve-Inch (12”) PVC Pipe – PVC Pipe, 470 L.F.
Subsurface Drain – Twelve-Inch (12”) PVC Pipe, 135 L.F.
Smooth Interior Corrugated Polyethylene Pipe, 190 L.F.
Channel Excavation, 150 C.Y.
Seeding, 1 L.S.
| 04/07/2022 06:00 PM UTC |
|
OSM 03(1109)101.1
Abandoned Mine Reclamation Project, Brownstown East, Kiskiminetas Township, Armstrong County
Estimated Amount: $100,000 to $200,000
Small Business Only
Term: 180 Calendar Days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Gas Facility Protection, 1 L.S.
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.
Clearing and Grubbing, 1 L.S.
Demolition, Removal and Disposal of Mine Structures, 1 L.S.
Sealing Mine Entries, 5 Each
Sealing Mine Entries – Eight-Inch (8”) Diameter SDR-35 PVC Pipe, 200 L.F.
Seeding, 1 L.S.
| 03/10/2022 07:00 PM UTC |
|
OOGM 21-1
Cleaning Out and Plugging Seven (7) Orphan Oil and Gas Wells, Mead Township, Warren County, PA
ON BID FORM, PLEASE DISREGARD THE FOLLOWING:
**REQUIRED FOR CONTRACTS ESTIMATED OVER $50,000...
Mandatory Pre-Bid Conference will be held on January 20, 2022 at 9am. Location: Chapman State Park, 4790 Chapman Dam Road, Clarendon, PA 16313-2830
(5 miles southwest of Clarendon, PA)
Parking Lot and/or Pavilion 1 (just past the spillway)
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 180 Calendar Days
Bid Bond Not Required
Principal Items of Work and Approximate Quantities:
Clean-out and plug seven (7) orphan oil and gas wells, estimated to be up to 2,000 feet in depth, to Department specifications.
Prepare and restore well sites.
Mobilize and demobilize plugging equipment.
| 02/24/2022 07:00 PM UTC |
|
AMD 32(2722)102.1 (DGS 193-38)
Abandoned Mine Reclamation Project
Blacklick Creek Treatment Facility (Wehrum)
Blacklick Township, Cambria County and
Buffington and East Wheatfield Townships, Indiana County
Estimated Amount: Greater than $5,000,000
Term: 1,000 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
(See page 1 of Bid Information.)
MANDATORY PRE-BID MEETING will be held on
December 15, 2021 at 10:00 a.m.
Department representatives will meet contractors at:
DEP Cambria Office
Bureau of Abandoned Mine Reclamation
1st Floor, Room 1A & 1B
286 Industrial Park Road
Ebensburg, PA 15931
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
*No Small Diverse Business Goals were determined for this project.
| 01/27/2022 07:00 PM UTC |
|
OSM 17(7050)101.1
Abandoned Mine Reclamation Project
Muddy Run East
Gulich Township, Clearfield County
Estimated Amount: $200,000 to $299,999 (Small Business Only)
Term: 210 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Dewatering Impoundments, 1 L.S.
Clearing and Grubbing, 1 L.S.
Subsurface Drains with Cleanouts, 1,750 L.F.
Grading, 78,400 C.Y.
Rock Lining, 244 S.Y.
Seeding, 13.2 Acre
| 12/02/2021 07:00 PM UTC |
|
AMD 54(4124)108.1
Acid Mine Drainage Abatement Project
Rausch Creek Treatment Plant Lime Tank Replacement
Hegins Township, Schuylkill County
Estimated Amount: $300,000 to $500,000
Term: 180 Calendar Days
Bid Bond Required
Principle Items of Work:
Temporary Lime Supply - 1 L.S.
Removal of Existing Lime Storage Tank - 1 L.S.
Installation of New Lime Storage Tank -1 L.S.
Anchoring System - L.S.
No Mandatory Pre-Bid Meeting has been scheduled.
| 12/02/2021 07:00 PM UTC |
|
OOGM 20-4
Cleaning Out and Plugging One Abandoned Well in Stewardson Township, Potter County.
Mandatory Pre-Bid Meeting to be held on Tuesday, October 26, 2021 at 10:00 A.M. at the pavilion in Ole Bull State Park.
Estimated amount of Project: 200,000 to 299,999 (Small Business Only)
Term: 90 calendar days.
Bid Bond NOT Required.
Principal Items of Work and Approximate Quantities:
Clean-out and plug one (1) abandoned gas well, estimated to be 7,000 feet in depth, to Department specifications.
Prepare and restore well sites.
Mobilize and demobilize plugging equipment.
| 11/18/2021 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.