Pennsylvania Department of Environmental Protection
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
OOGM 26-1
Cleaning Out and Plugging Twenty-Four (24) Orphan Gas Wells
Hamilton Township, McKean County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug twenty-four (24) orphan gas wells, estimated to be 1400-1700 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: June 23, 2026 at 10:00 a.m.
Department representatives will meet contractors at:
Powerhouse Historic Site on SR321
41.8516, -78.8242
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 07/23/2026 06:00 PM UTC |
|
OSM 30(2764)101.1
Abandoned Mine Reclamation Project
Stringtown North
Cumberland Township, Greene County
Estimated Amount: $300,000 to $500,000
Term: 90 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilizaiton, 1 L.S.
Site Preparation and Restoration, 1 L.S.
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.
Demolition, Removal and Disposal of Mine Facilities, 1 L.S.
Backfilling Mine Shafts – Rock Fill, 2,660 TON
Backfilling Mine Shafts – Coarse Aggregate, 50 TON
Backfilling Mine Shafts – Water Collection and Treatment, 1 L.S.
| 07/30/2026 06:00 PM UTC |
|
OSM 17(4550)101.1
Abandoned Mine Reclamation Project
Lower Flat Run
Graham and Morris Townships, Clearfield County
Estimated Amount: $200,000 to $299,999 (Small Business Only)
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter), 962 L.F.
Clearing and Grubbing, 7.94 ACRE
Grading, 83,577 C.Y.
Planting – Planting Preparation, 7.94 ACRE
Planting – Grass Seed, 397 LB.
Subsurface Drain, 984 L.F.
| 08/06/2026 06:00 PM UTC |
|
OOGM FS25-7
Cleaning Out and Plugging Four (4) Orphan Gas Wells
Keating Township, McKean County
Estimated Amount: $300,000-$500,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug four (4) orphan gas wells, estimated to be 1800-2200 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: July 14, 2026, at 10:00 a.m.
Department representatives will meet contractors at: Hilltop Volunteer Fire Department, 4351 PA-646, Cyclone, PA 16726
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 08/20/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OOGM 20-4
Cleaning Out and Plugging One Abandoned Well in Stewardson Township, Potter County.
Mandatory Pre-Bid Meeting to be held on Tuesday, October 26, 2021 at 10:00 A.M. at the pavilion in Ole Bull State Park.
Estimated amount of Project: 200,000 to 299,999 (Small Business Only)
Term: 90 calendar days.
Bid Bond NOT Required.
Principal Items of Work and Approximate Quantities:
Clean-out and plug one (1) abandoned gas well, estimated to be 7,000 feet in depth, to Department specifications.
Prepare and restore well sites.
Mobilize and demobilize plugging equipment.
| 11/18/2021 07:00 PM UTC |
|
OSM 40(4241)101.1
Abandoned Mine Reclamation Project
46 Birch Ave. Nanticoke
City of Nanticoke, Luzerne County
Estimated Amount $100,000 to $200,000 (Small Business Only)
Term: 60 Calendar Days
Bid Bond is Required
Principal Items of Work and Approximate Quantities:
Drilling Boreholes – Vertical Air Rotary Drilling to Accommodate Six-Inch (6”) Casing, 175 L.F.
Drilling Boreholes – Angular Air Rotary Drilling to Accommodate Six-Inch (6”) Casing, 40 L.F
Furnishing and Installing Casing Pipe, 120 L.F.
Fill Material Injection – Flowable Fill Material Through Borehole, 100 C.Y.
Fill Material Injection – Concrete Fill Material Through Borehole, 750 C.Y.
Sealing Boreholes, 5 EACH
| 11/18/2021 07:00 PM UTC |
|
OSM 16(1041)101.1
Abandoned Mine Reclamation Project
Manor Church Southeast
Paint Township, Clarion County
Estimated Amount: $300,000-$500,000
NO GOALS DETERMINED.
PLEASE DISREGARD ATTACHMENT A.
Term: 300 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Dewatering Impoundments, 1 L.S.
Clearing and Grubbing, 1 L.S.
Subsurface Drains with Cleanouts, 1,569 L.F.
Grading, 120,750 C.Y.
Erosion Matting, 340 S.Y.
Rock Lining, 36 S.Y.
Twelve-Inch (12”) Mine Drain Pipe, 330 L.F.
Twenty-Four Inch (24”) Bat Gate Pipe - Corrugated Smooth Interior Polyethylene Pipe, 220 L.F.
Twenty-Four Inch (24”) Bat Gate Pipe - Corrugated Metal Pipe, 10 L.F.
Steel Bat Gate Attachment to Bat Gate Pipe, 1 EACH
AASHTO No. 1 Aggregate Backfill, 15.5 TON
Seeding, 23.3 ACRE
Tree Planting, 2,004 TREE
No Mandatory Pre-Bid Meeting.
| 10/28/2021 06:00 PM UTC |
|
OSM 17(1192,7157)101.1
Abandoned Mine Reclamation Project
Eden East Water Main Extension
Goshen Township, Clearfield County
Estimated Amount: $1,000,000 to $5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Site Preparation and Restoration – 1 L.S.
Six Inch (6") PVC Pipe or HDPE Pipe Including Fittings – 53,025 L.F.
Six-Inch (6") Gate Valve – 57 Each
Two-Inch (2") PVC Pipe or HDPE Pipe Including Fittings – 10,900 L.F.
2A Stone – 30,100 C.Y.
Three-Quarter Inch (3/4") Service – 91 Each
Three-Quarter Inch (3/4") Polyethylene Pipe – 3,500 L.F.
Three-Quarter Inch (3/4”) Automatic Air Release Valve – 11 Each
Two-Inch (2”) Blow-off Assembly – 15 Each
Pressure-Reducing Vaults – 2 Each
Glass Fused to Steel Bolted-Steel Water Storage Tank Including Foundation and Vault – 1 L.S.
Packaged Water Booster Pumping Station Complete – 1 L.S.
*NO GOALS WERE DETERMINED FOR THIS PROJECT. PLEASE DISREGARD SPECIAL REQUIREMENT NO. 1 ON PAGE SR-1, AND ALSO DISREGARD ATTACHMENT A FOR THIS PROJECT.
| 10/21/2021 06:00 PM UTC |
|
OSM 16(3571)101.1
Abandoned Mine Reclamation Project
Arthurs Southeast
Paint Township, Clarion County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 210 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clearing and Grubbing, 1 L.S.
Grading, 50,300 C.Y.
Seeding, 7.7 Acre
Tree Planting, 1,480 Tree
| 09/09/2021 06:00 PM UTC |
|
OSM 02(0835)102.1
Abandoned Mine Reclamation Project
Eastmont Swim Club
Wilkins Township, Allegheny County
Estimated Amount: $200,000 to $299,999 (Small Business Only)
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.
Trench Excavation 400 C.Y.
Subsurface Drain – Eight-Inch (8”) Nominal Diameter PVC SDR-35 Pipe, 450 L.F.
Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 400 C.Y.
Segmented Retaining Wall with Geogrid Reinforcement, 400 S.F.
Patio Replacement, 20 S.Y.
| 09/09/2021 06:00 PM UTC |
|
OSM 26(4702)101.1
Abandoned Mine Reclamation Project, Full Gospel Church, Stewart Township, Fayette County.
Estimated Amount: $500,000 to $1,000,000
Term: 360 calendar days
Bid Bond Required
NO GOALS WERE DETERMINED FOR THIS PROJECT. ATTACHMENT A HAS BEEN OMITTED.
Principal Items of Work and Approximate Quantities:
Clearing and Grubbing 1 Lump Sum; Grading (A) Grading Area A 135,900 C.Y. (B) Grading Area B 44,900 C.Y.; Access Roadway and Parking Lot (A) Roadway Surface Material 925 S.Y. (B) Utility Pole Parking Stop 48 L.F.; Tree Planting 13,260 EACH; Furrow Ripping 10 ACRE; Deer Fencing 6,000 L.F.;
Seeding 1 ACRE; ARRI Seeding 19.5 ACRE.
| 07/22/2021 06:00 PM UTC |
|
OSM 11(3266)102.1
Abandoned Mine Reclamation Project, Cymbria II, Susquehanna Township, Cambria County.
Estimated Amount: $300,000 to $500,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clearing and Grubbing, 20.2 Acre; Permanent Swales with R-4 Rock Check Dams, 1,070 L.F.; Grading, 169,119 C.Y.; Tree Planting, 11,450 Tree.
*There are no goal requirements for this project.
Please note: Contract Drawing 5 of 6 for the Permanent Swales W/ Rock Check Dams should read “ To be lined with erosion matting which shall be Curlex II as manufactured by American Excelsior Company, 850 Avenue H East Arlington, TX 76011 or approved equivalent . Telephone 817-385-3500”.
| 07/08/2021 06:00 PM UTC |
|
OSM 02(1726,0385)103.1
Abandoned Mine Reclamation Project, Penn Hills, Municipality of Penn Hills, Allegheny County.
Estimated Amount: $300,000 to $500,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Trench Excavation, 1,165 C.Y.; Smooth Interior Corrugated Polyethylene Pipe, 300 L.F.; Smooth Interior Corrugated Polyethylene Pipe Junction, 12 Each; Rock Lining with Geotextile, 415 Ton; Precast Concrete Inlet Box, 1 Each; PA DOT 2A Stone, 100 C.Y.; Boring - Twenty-four-inch (24”) Steel Casing, 275 L.F.; Subsurface Drain - Twelve-inch (12”) Polyvinyl Chloride (PVC) Pipe, 310 L.F.; Subsurface Drain - Eight-inch (8”) Polyvinyl Chloride (PVC) Pipe, 975 L.F.; Subsurface Drain - AASHTO No. 1 Coarse Aggregate, 860 C.Y.
*There are no goal requirements for this project.
| 07/08/2021 06:00 PM UTC |
|
OSM 32(3246)101.1
Abandoned Mine Reclamation Project
Upper Two Lick West
White Township, Indiana County
Estimated Amount: $500,000 to $1,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Eight-Inch (8”) PVC Pipe Including Fittings – 1,250 LF
Eight-Inch (8”) Ductile Iron Pipe Including Fittings – 2,900 LF
Six-Inch (6”) Ductile Iron Pipe Including Fittings – 2,075 LF
Service Lateral Connections - Three-Quarter Inch (3/4") Service – 22 Each
Gas Line Crossing – 150 LF
Stream Crossing – 120 LF
Two-Inch (2”) Automatic Air Release Valve – 3 Each
Typical Above Ground Blow-Off Assembly – 3 Each
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
*Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 5%, VBE - 3%.
If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1.
If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5).
If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5).
Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule.
Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 06/03/2021 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.