General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
EC-02-10060-26
Storage Tank Removal Project Paul's Auto Service Baldwin Township, Allegheny County Estimated Amount: $0 to $100,000 (Small Business Only) Term: 90 calendar days No Bid Bond Required Principal Items of Work and Approximate Quantities: Removal of 4 fiberglass underground storage tanks. (Two 8,000 gallon and two 6,000 gallon tanks.) Four tanks are presumed to be empty (less than an inch of fluid at the last inspection). There may be a need to pump the tanks if water or product is found in them. A closure report is required as well as closure sampling.
11/05/2026 07:00 PM UTC
OOGM FS26-6
Cleaning Out and Plugging Twenty-Three (23) Orphan Gas Wells Mahoning and Redbank Townships, Armstrong County Porter and Redbank Townships, Clarion County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-three (23) orphan gas wells, estimated to be 1,000-3,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 7, 2026, and October 8, 2026, at 9:00 a.m. Department representatives will meet contractors at: Gumtown Memorial Park 240 Water Street New Bethlehem, PA 16242 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
11/12/2026 07:00 PM UTC
OSM 02(1454)102.1
Abandoned Mine Reclamation Project Beulah Road Wilkins Township (Lucia Drive) Wilkins Township, Allegheny County Estimated Amount: $1,000,000 to $5,000,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Clearing and Grubbing, 1 L.S. Trench Excavation, 2,575 C.Y. Subsurface Drain – Eight-Inch (8”) Nominal Diameter Perforated PVC SDR-35 Pipe, 1,088 L.F. Subsurface Drain – Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 78 L.F. Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 3,680 C.Y. Subsurface Drain – AASHTO No. 57 Coarse Aggregate, 173 C.Y. Subsurface Drain – Precast Concrete Inlet, 1 EACH Subsurface Drain – Precast Concrete Manhole, 1 EACH Segmented Retaining Wall with Geogrid Reinforcement - Retaining Wall, 3,150 S.F. Segmented Retaining Wall with Geogrid Reinforcement - Eight-Inch (8") Nominal Diameter Perforated PVC SDR-35 Pipe, 898 L.F. Concrete Patio Replacement, 250 S.Y. Site Restoration – Seeding, 1 L.S. Site Restoration – Topsoil, 20 TON Site Restoration – Miscellaneous, 1 L.S. MANDATORY Pre-Bid Conference will be held on: October 28, 2026, at 2:00 PM. A link is available on the first page of the Final Bid Information to join the Teams Meeting. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID. READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
11/12/2026 07:00 PM UTC
OSM 11,65(0948,4371)101.1
Abandoned Mine Reclamation Project South Nanty Glo 2 Nanty Glo Borough and Jackson Township, Cambria County Municipality of Murrysville, Westmoreland County Estimated Amount: $1,000,000 to $5,000,000 Term: 720 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance with Wash Rack, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 5,912 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube,351 L.F. Clearing and Grubbing, 23.4 ACRE Grading – Grading, 122,489 C.Y.. Grading – Ripping, 14.4 ACRE Planting – Planting Preparation, 23.4 ACRE Planting – Tree Seedlings, 9,790 EACH Planting – Grass Seed, 713 LB. Subsurface Drain, 4,520 L.F. Chimney/Blanket Drain – AASHTO No. 8 Aggregate, 270 TON Chimney/Blanket Drain – R-4 Rock, 104 S.Y. Chimney/Blanket Drain – Filter Fabric, 312 S.Y. Permanent Channel Excavation, 1,626 C.Y. Erosion Matting, 4,642 S.Y. Stilling Basin, 231 S.F. Coal Refuse Disposal, 44,073 C.Y. Coal Ash Addition – Supply and Delivery, 24,628 TON Coal Ash Addition – Coordination, 1 L.S. Coal Ash Addition – Placement, 24,628 TON Access Road – Construction, 1 L.S. Access Road – Maintenance Stone, 100 TON Construction Surveying, Type A, 1 L.S.
11/12/2026 07:00 PM UTC
OSM 32(3821)101.1
Abandoned Mine Lands Reclamation Project with Passive Treatment System State Game Lands 332 Blacklick and Young Townships, Indiana County Estimated Amount: Greater than $5,000,000 Term: 720 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: AML PRINCIPAL ITEMS: Diversion and Care of Water, 1 L.S. Alkaline Addition - Agricultural Limestone - Supply and Delivery, 61,200 TON Alkaline Addition - Beneficial Ash - Supply and Delivery, 135,000 TON Alkaline Addition - Application of Alkaline Materials, 196,200 TON Grading - Area 1, 314,200 C.Y. Grading - Area 2, 384,700 C.Y. Grading - Area 3, 126,500 C.Y. Grading - Area 4, 158,100 C.Y. Grading - Area 5, 185,800 C.Y. Diversion Channel and Ford Crossing Excavation, 1,616 C.Y. Stone Aggregate, 24 TON Rock Lining - Stream Relocation, 1,814 S.Y. Rock Lining - Ford Crossing, 212 S.Y. Seeding - Seed Bed Preparation, 59 ACRE Seeding - Seed - Type 1, 2,021 LB. Seeding - Seed - Type 2, 2,847 LB. Seeding - Mulching, 59 ACRE Construction Surveying, 1 L.S. PTS PRINCIPAL ITEMS: Wet Seal Tie-In – See Schedule of Prices Subitems H-Flume, 1 L.S. Agri Drain Smart Drainage Systems® - See Schedule of Prices Subitems Terraced Iron Formation Channel - See Schedule of Prices Subitems Holding and Settling Ponds - See Schedule of Prices Subitems Auto Flushing Vertical Flow Ponds - See Schedule of Prices Subitems Jennings-Type Vertical Flow Pond - See Schedule of Prices Subitems Aerobic Wetland - See Schedule of Prices Subitems Dewatering Basin – See Schedule of Prices Subitems
11/12/2026 07:00 PM UTC
AMD 56(2524)104.1
Abandoned Mine Drainage Abatement Project Oven Run Site B (AFVFP Stone Cleaning) Shade Township, Somerset County Estimated Amount: $300,000 to $500,000 Term: 120 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Limestone Bed Aggregate Cleaning – AASHTO No. 1 – 7830 C.Y. Limestone Coarse Aggregate AASHTO No. 1 – 63 TON
11/19/2026 07:00 PM UTC
OOGM 26-2
Cleaning Out and Plugging Twenty-Five (25) Orphan Gas Wells Wetmore Township, McKean County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-five (25) orphan gas wells, estimated to be 1,500 – 2,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 27th, 2026, at 9 A.M. & October 28th, 2026, at 10 A.M. Department representatives will meet contractors at: Tuesday, October 27th at 9:00 am (Day 1) Meet at FR295A Stone Pit (See map in bid documents) Coordinates: 41.721987, -78.818326 Wednesday, October 28th at 10:00 am (Day 2) Meet at FR279 Stone Pit (Different time and location from day 1. See map in bid documents) Coordinates: 41.725668, -78.784642 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OFTHE BID.
12/03/2026 07:00 PM UTC
OSM 10,43(2910,4508)101.1
Abandoned Mine Reclamation Project North Liberty South Slippery Rock Township, Butler County Liberty Township, Mercer County Estimated Amount: $300,000 to $500,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 5,000 L.F. Dewatering Impoundment, 1 L.S. Clearing and Grubbing, 20 ACRE Brush Barrier, 730 L.F. Grading – Grading Area 1, 90,000 C.Y. Grading – Grading Area 2, 34,000 C.Y. Planting – Planting Preparation, 20 ACRE Planting – Grass Seed, 1,200 LB. Construction Surveying, Type B, 1 L.S.
12/03/2026 07:00 PM UTC
OSM 35(2193)101.1
Abandoned Mine Reclamation Project Rocky Glen Pond Moosic Borough, Lackawanna County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 300 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Grading – 21,200 Cubic Yards Backfill Mine Openings – 870 Cubic Yards Bat Gates – 40 Linear Feet (4 Gates) Seeding – 12 Acres
12/03/2026 07:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OSM 64(4272,4271)102.1
Abandoned Mine Reclamation Project, Forest City East - PFBC Access, Forest City Borough, Susquehanna County and Clinton Township, Wayne County Estimated Amount: $1,000,000 to $5,000,000 Term: 500 Calendar Days Bid Bond Required Principal Items of Work and Approximate Quantities: o Grading – 281,000 cubic yards o Pipe – 1,400 linear feet o Drainage Excavation – 3,200 cubic yards o Rock Lining – 2,400 square yards o Type D-W Endwalls – 9 each o Manholes – 2 each Mandatory Pre-Bid Meeting: BDISBO Training will be held via Teams on Wednesday, June 29, 2022, at 3:00 PM. All plan holders will be provided with the link to this meeting upon the issue. If you are interested in bidding on this project and are not a plan holder, please contact the Construction Contracts Section at 717-772-4016 so that they may provide you with details needed to attend the meeting or contact Construction Contracts via email at RA-ConstructionContr@pa.gov. READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. *Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 6%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
07/21/2022 06:00 PM UTC
OSM 40,54(1385,3723,3722)101.1
Abandoned Mine Reclamation Project Audenried Coal to Solar Project - Phase 1 Hazle Township, Luzerne County and Kline Township, Schuylkill County Estimated Amount: Greater Than $5,000,000 No Goals Determined Term: 575 Calendar Days Bid Bond Required Principal Items of Work and Approximate Quantities: Removal and Disposal of Structures – 4 Grading, Hauling and Compaction -1,970,130 C.Y. Disposal of Asbestos Waste – 40 Tons Drainage Excavation – 2,977 C.Y. Rock Lining – 620 S.Y. Seeding – 155 ACRE
07/14/2022 06:00 PM UTC
OSM 63(3803)102.1
Abandoned Mine Reclamation Project Monongahela South No. 1 - Phase 2 City of Monongahela, Washington County Estimated Amount: $300,000-$500,000 Term: 100 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Excavation and Backfilling A. Excavation 6,080 CY B. Backfill 5,830 CY Subsurface Drains A. Toe Key 192 LF Geogrid Reinforcements 23,650 SY Cast in-place Concrete Driveway 2,752 SF Gravel Driveway 4,666 SF MANDATORY Pre-Bid Conference will be held on: May 3, 2022 at 10:00 a.m. Department representatives will meet contractors at: DEP Cambria District Office 286 Industrial Park Road, Ebensburg, PA 15931 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
05/19/2022 06:00 PM UTC
OSM 32(2443)101.1
Abandoned Mine Reclamation Project, Taylorsville South Green Township, Indiana County Estimated Amount: $100,000 to $200,000 Small Business Only Term: 180 Calendar Days Bid Bond is Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S. Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Clearing and Grubbing, 1 L.S. Sealing Mine Entries – Twelve-Inch (12”) PVC Pipe, 80 L.F. Grading, 2,500 C.Y. Trench Excavation, 450 C.Y. Twelve-Inch (12”) PVC Pipe – PVC Pipe, 470 L.F. Subsurface Drain – Twelve-Inch (12”) PVC Pipe, 135 L.F. Smooth Interior Corrugated Polyethylene Pipe, 190 L.F. Channel Excavation, 150 C.Y. Seeding, 1 L.S.
04/07/2022 06:00 PM UTC
OSM 03(1109)101.1
Abandoned Mine Reclamation Project, Brownstown East, Kiskiminetas Township, Armstrong County Estimated Amount: $100,000 to $200,000 Small Business Only Term: 180 Calendar Days Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S. Gas Facility Protection, 1 L.S. Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Clearing and Grubbing, 1 L.S. Demolition, Removal and Disposal of Mine Structures, 1 L.S. Sealing Mine Entries, 5 Each Sealing Mine Entries – Eight-Inch (8”) Diameter SDR-35 PVC Pipe, 200 L.F. Seeding, 1 L.S.
03/10/2022 07:00 PM UTC
OOGM 21-1
Cleaning Out and Plugging Seven (7) Orphan Oil and Gas Wells, Mead Township, Warren County, PA ON BID FORM, PLEASE DISREGARD THE FOLLOWING: **REQUIRED FOR CONTRACTS ESTIMATED OVER $50,000... Mandatory Pre-Bid Conference will be held on January 20, 2022 at 9am. Location: Chapman State Park, 4790 Chapman Dam Road, Clarendon, PA 16313-2830 (5 miles southwest of Clarendon, PA) Parking Lot and/or Pavilion 1 (just past the spillway) Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 180 Calendar Days Bid Bond Not Required Principal Items of Work and Approximate Quantities: Clean-out and plug seven (7) orphan oil and gas wells, estimated to be up to 2,000 feet in depth, to Department specifications. Prepare and restore well sites. Mobilize and demobilize plugging equipment.
02/24/2022 07:00 PM UTC
AMD 32(2722)102.1 (DGS 193-38)
Abandoned Mine Reclamation Project Blacklick Creek Treatment Facility (Wehrum) Blacklick Township, Cambria County and Buffington and East Wheatfield Townships, Indiana County Estimated Amount: Greater than $5,000,000 Term: 1,000 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: (See page 1 of Bid Information.) MANDATORY PRE-BID MEETING will be held on December 15, 2021 at 10:00 a.m. Department representatives will meet contractors at: DEP Cambria Office Bureau of Abandoned Mine Reclamation 1st Floor, Room 1A & 1B 286 Industrial Park Road Ebensburg, PA 15931 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID. *No Small Diverse Business Goals were determined for this project.
01/27/2022 07:00 PM UTC
OSM 17(7050)101.1
Abandoned Mine Reclamation Project Muddy Run East Gulich Township, Clearfield County Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 210 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Dewatering Impoundments, 1 L.S. Clearing and Grubbing, 1 L.S. Subsurface Drains with Cleanouts, 1,750 L.F. Grading, 78,400 C.Y. Rock Lining, 244 S.Y. Seeding, 13.2 Acre
12/02/2021 07:00 PM UTC
AMD 54(4124)108.1
Acid Mine Drainage Abatement Project Rausch Creek Treatment Plant Lime Tank Replacement Hegins Township, Schuylkill County Estimated Amount: $300,000 to $500,000 Term: 180 Calendar Days Bid Bond Required Principle Items of Work: Temporary Lime Supply - 1 L.S. Removal of Existing Lime Storage Tank - 1 L.S. Installation of New Lime Storage Tank -1 L.S. Anchoring System - L.S. No Mandatory Pre-Bid Meeting has been scheduled.
12/02/2021 07:00 PM UTC
OOGM 20-4
Cleaning Out and Plugging One Abandoned Well in Stewardson Township, Potter County. Mandatory Pre-Bid Meeting to be held on Tuesday, October 26, 2021 at 10:00 A.M. at the pavilion in Ole Bull State Park. Estimated amount of Project: 200,000 to 299,999 (Small Business Only) Term: 90 calendar days. Bid Bond NOT Required. Principal Items of Work and Approximate Quantities: Clean-out and plug one (1) abandoned gas well, estimated to be 7,000 feet in depth, to Department specifications. Prepare and restore well sites. Mobilize and demobilize plugging equipment.
11/18/2021 07:00 PM UTC
111 - 120 of 218 Solicitations
1 2 … 8 9 10 12 14 15 16 … 21 22