General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
EC-02-10060-26
Storage Tank Removal Project Paul's Auto Service Baldwin Township, Allegheny County Estimated Amount: $0 to $100,000 (Small Business Only) Term: 90 calendar days No Bid Bond Required Principal Items of Work and Approximate Quantities: Removal of 4 fiberglass underground storage tanks. (Two 8,000 gallon and two 6,000 gallon tanks.) Four tanks are presumed to be empty (less than an inch of fluid at the last inspection). There may be a need to pump the tanks if water or product is found in them. A closure report is required as well as closure sampling.
11/05/2026 07:00 PM UTC
OOGM FS26-6
Cleaning Out and Plugging Twenty-Three (23) Orphan Gas Wells Mahoning and Redbank Townships, Armstrong County Porter and Redbank Townships, Clarion County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-three (23) orphan gas wells, estimated to be 1,000-3,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 7, 2026, and October 8, 2026, at 9:00 a.m. Department representatives will meet contractors at: Gumtown Memorial Park 240 Water Street New Bethlehem, PA 16242 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
11/12/2026 07:00 PM UTC
OSM 02(1454)102.1
Abandoned Mine Reclamation Project Beulah Road Wilkins Township (Lucia Drive) Wilkins Township, Allegheny County Estimated Amount: $1,000,000 to $5,000,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Clearing and Grubbing, 1 L.S. Trench Excavation, 2,575 C.Y. Subsurface Drain – Eight-Inch (8”) Nominal Diameter Perforated PVC SDR-35 Pipe, 1,088 L.F. Subsurface Drain – Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 78 L.F. Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 3,680 C.Y. Subsurface Drain – AASHTO No. 57 Coarse Aggregate, 173 C.Y. Subsurface Drain – Precast Concrete Inlet, 1 EACH Subsurface Drain – Precast Concrete Manhole, 1 EACH Segmented Retaining Wall with Geogrid Reinforcement - Retaining Wall, 3,150 S.F. Segmented Retaining Wall with Geogrid Reinforcement - Eight-Inch (8") Nominal Diameter Perforated PVC SDR-35 Pipe, 898 L.F. Concrete Patio Replacement, 250 S.Y. Site Restoration – Seeding, 1 L.S. Site Restoration – Topsoil, 20 TON Site Restoration – Miscellaneous, 1 L.S. MANDATORY Pre-Bid Conference will be held on: October 28, 2026, at 2:00 PM. A link is available on the first page of the Final Bid Information to join the Teams Meeting. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID. READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
11/12/2026 07:00 PM UTC
OSM 11,65(0948,4371)101.1
Abandoned Mine Reclamation Project South Nanty Glo 2 Nanty Glo Borough and Jackson Township, Cambria County Municipality of Murrysville, Westmoreland County Estimated Amount: $1,000,000 to $5,000,000 Term: 720 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance with Wash Rack, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 5,912 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube,351 L.F. Clearing and Grubbing, 23.4 ACRE Grading – Grading, 122,489 C.Y.. Grading – Ripping, 14.4 ACRE Planting – Planting Preparation, 23.4 ACRE Planting – Tree Seedlings, 9,790 EACH Planting – Grass Seed, 713 LB. Subsurface Drain, 4,520 L.F. Chimney/Blanket Drain – AASHTO No. 8 Aggregate, 270 TON Chimney/Blanket Drain – R-4 Rock, 104 S.Y. Chimney/Blanket Drain – Filter Fabric, 312 S.Y. Permanent Channel Excavation, 1,626 C.Y. Erosion Matting, 4,642 S.Y. Stilling Basin, 231 S.F. Coal Refuse Disposal, 44,073 C.Y. Coal Ash Addition – Supply and Delivery, 24,628 TON Coal Ash Addition – Coordination, 1 L.S. Coal Ash Addition – Placement, 24,628 TON Access Road – Construction, 1 L.S. Access Road – Maintenance Stone, 100 TON Construction Surveying, Type A, 1 L.S.
11/12/2026 07:00 PM UTC
OSM 32(3821)101.1
Abandoned Mine Lands Reclamation Project with Passive Treatment System State Game Lands 332 Blacklick and Young Townships, Indiana County Estimated Amount: Greater than $5,000,000 Term: 720 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: AML PRINCIPAL ITEMS: Diversion and Care of Water, 1 L.S. Alkaline Addition - Agricultural Limestone - Supply and Delivery, 61,200 TON Alkaline Addition - Beneficial Ash - Supply and Delivery, 135,000 TON Alkaline Addition - Application of Alkaline Materials, 196,200 TON Grading - Area 1, 314,200 C.Y. Grading - Area 2, 384,700 C.Y. Grading - Area 3, 126,500 C.Y. Grading - Area 4, 158,100 C.Y. Grading - Area 5, 185,800 C.Y. Diversion Channel and Ford Crossing Excavation, 1,616 C.Y. Stone Aggregate, 24 TON Rock Lining - Stream Relocation, 1,814 S.Y. Rock Lining - Ford Crossing, 212 S.Y. Seeding - Seed Bed Preparation, 59 ACRE Seeding - Seed - Type 1, 2,021 LB. Seeding - Seed - Type 2, 2,847 LB. Seeding - Mulching, 59 ACRE Construction Surveying, 1 L.S. PTS PRINCIPAL ITEMS: Wet Seal Tie-In – See Schedule of Prices Subitems H-Flume, 1 L.S. Agri Drain Smart Drainage Systems® - See Schedule of Prices Subitems Terraced Iron Formation Channel - See Schedule of Prices Subitems Holding and Settling Ponds - See Schedule of Prices Subitems Auto Flushing Vertical Flow Ponds - See Schedule of Prices Subitems Jennings-Type Vertical Flow Pond - See Schedule of Prices Subitems Aerobic Wetland - See Schedule of Prices Subitems Dewatering Basin – See Schedule of Prices Subitems
11/12/2026 07:00 PM UTC
AMD 56(2524)104.1
Abandoned Mine Drainage Abatement Project Oven Run Site B (AFVFP Stone Cleaning) Shade Township, Somerset County Estimated Amount: $300,000 to $500,000 Term: 120 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Limestone Bed Aggregate Cleaning – AASHTO No. 1 – 7830 C.Y. Limestone Coarse Aggregate AASHTO No. 1 – 63 TON
11/19/2026 07:00 PM UTC
OOGM 26-2
Cleaning Out and Plugging Twenty-Five (25) Orphan Gas Wells Wetmore Township, McKean County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-five (25) orphan gas wells, estimated to be 1,500 – 2,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 27th, 2026, at 9 A.M. & October 28th, 2026, at 10 A.M. Department representatives will meet contractors at: Tuesday, October 27th at 9:00 am (Day 1) Meet at FR295A Stone Pit (See map in bid documents) Coordinates: 41.721987, -78.818326 Wednesday, October 28th at 10:00 am (Day 2) Meet at FR279 Stone Pit (Different time and location from day 1. See map in bid documents) Coordinates: 41.725668, -78.784642 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OFTHE BID.
12/03/2026 07:00 PM UTC
OSM 10,43(2910,4508)101.1
Abandoned Mine Reclamation Project North Liberty South Slippery Rock Township, Butler County Liberty Township, Mercer County Estimated Amount: $300,000 to $500,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 5,000 L.F. Dewatering Impoundment, 1 L.S. Clearing and Grubbing, 20 ACRE Brush Barrier, 730 L.F. Grading – Grading Area 1, 90,000 C.Y. Grading – Grading Area 2, 34,000 C.Y. Planting – Planting Preparation, 20 ACRE Planting – Grass Seed, 1,200 LB. Construction Surveying, Type B, 1 L.S.
12/03/2026 07:00 PM UTC
OSM 35(2193)101.1
Abandoned Mine Reclamation Project Rocky Glen Pond Moosic Borough, Lackawanna County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 300 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Grading – 21,200 Cubic Yards Backfill Mine Openings – 870 Cubic Yards Bat Gates – 40 Linear Feet (4 Gates) Seeding – 12 Acres
12/03/2026 07:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OOGM 20-3
Cleaning Out and Plugging Six Abandoned Wells Sugarcreek Borough, Venango County Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 180 calendar days Bid Bond NOT Required Principal Items of Work and Approximate Quantities: Clean out and plug six (6) abandoned wells, estimated to be up to 1,000 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY PRE-BID CONFERENCE: May 13, 2021 at 9am Sugar Valley Lodge 323 Causeway Drive Franklin, PA 16323 FAILURE TO ATTEND THE PRE-BID CONFERENCE WILL BE CAUSE FOR REJECTION OF THE BID.
05/27/2021 06:00 PM UTC
OOGM 20-2
Cleaning Out and Plugging One Abandoned Well in Ross Township, Allegheny County. MANDATORY PRE-BID MEETING SCHEDULED FOR MARCH 25, 2021 AT 10:00 AM. MEET DEP REP AT 129 MAYER DRIVE IN PITTSBURGH, PA 15237. Estimated Amount of Project: $200,000 to $299,999 (Small Business Only); Term: 120 calendar days; Bid Bond NOT Required. Principal Items of Work: Clean out and plug one (1) abandoned well, estimated to be up to 3,000 feet in depth, to Department specifications; prepare and restore well site; mobilize and demobilize plugging equipment.
04/15/2021 06:00 PM UTC
OSM 32(4806)102.1
Abandoned Mine Reclamation Project, Canoe Ridge South, Canoe Township, Indiana County. Estimated Amount: $100,000 to $200,000 (Small Business Only). Term 360 calendar days. Bid Bond Required. Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S.; Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (Eighteen-Inch [18"] Diameter), 2,000 L.F.; Grading, 48,000 C.Y.; Seeding, 9 Acres.
03/25/2021 06:00 PM UTC
OSM 18(1123,6679)101.1
Abandoned Mine Reclamation Project, Huling Branch East Noyes and Leidy Townships, Clinton County Estimated Amount: Greater than $5,000,000 Term: 455 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: AMD Subsurface Underdrains and AMD Subsurface Treatment Cell Perforated Twelve-Inch (12") PE pipe, 3,265 L.F. AMD Subsurface Underdrains and AMD Subsurface Treatment Cell Solid Twelve-Inch (12") PE pipe, 130 L.F. AMD Subsurface Underdrains and AMD Subsurface Treatment Cell AASHTO No. 1 Calcareous Coarse Aggregate, 13,112 Ton AMD Subsurface Underdrains and AMD Subsurface Treatment Cell Calcareous Modified 2A Aggregate, 500 Ton AMD Subsurface Underdrains and AMD Subsurface Treatment Cell Non-Calcareous AASHTO No. 1 Coarse Aggregate, 7,155 Ton AMD Subsurface Underdrains and AMD Subsurface Treatment Cell Ethylene-Propylene-Diene Terpolmer (EPDM) Impervious Lining, 9,496 S.Y. Revamped Treatment Pond Coal Refuse Removal, 12,500 C.Y. Revamped Treatment Pond Ethylene-Propylene-Diene Terpolymer (EPDM) Impervious Lining, 5,393 S.Y. Fence, 1,300 L.F. Alkaline Addition (Limestone Screenings), 50,800 Ton Grading, 450,481 C.Y. Reconstruct Recreational Trails, 5,610 L.F. Forestland Preparation for the Forest Reclamation Approach Backfill, 18.8 Acre Tree Planting, 16,750 Tree Seeding - Wildlife Habitat – Mulching, 22.9 Acre READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. *Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 7%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
02/18/2021 07:00 PM UTC
OSM 17(0111)101.1
Abandoned Mine Reclamation Project Madera North Side, Bigler Township, Clearfield County Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S. Diversion and Care of Water, 1 L.S. Trench Excavation, 600 C.Y. Subsurface Drain – Pipe, 500 L.F. Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 500 C.Y. Repaving – Base Course, 77 TON Repaving – Binder Course, 40 TON Traffic Control, 1 L.S. Office Facility, 1 L.S.
02/04/2021 07:00 PM UTC
OSM 11(2464)103.1
Abandoned Mine Reclamation Project Vintondale Refuse Pile Reclamation Vintondale Borough, Cambria County Estimated Amount: $1,000,000 to $5,000,000 Term: 910 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Preparation and Implementation of the Erosion and Sediment Pollution Control Plan and Highway Occupancy Permit, 1 L.S. Coal Refuse Removal and Grading - Coal Refuse Removal, 215,000 C.Y. Coal Refuse Removal and Grading - Coal Refuse Grading, 10 ACRE Equipment Storage Area, 278 S.Y. Seeding - Mulching, 10 ACRE READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. *Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
02/04/2021 07:00 PM UTC
OSM 40(0493,3724,3725)101.1
Abandoned Mine Reclamation Project Hollars Hill South AML - Cranberry Creek Gateway Project Hazle Township, Luzerne County Estimated Amount: Greater than $5,000,000 Term: 600 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Eight Inch (8") Ductile Iron Pipe Including Fittings - 1,015 L.F. Connection to Existing Water Main - 1 L.S. Drilling of Boreholes - 448 L.F. Furnishing and Installing Casing Pipe - 285 L.F. Fill Material Injection - Flowable Fill Material/Concrete Material - 200/200 C.Y. Removal and Disposal of Structures - 7 Grading, Hauling and Compaction - 742,666 C.Y. Disposal of Solid Waste - 10,000 Tons Drainage Excavation - 2,645 C.Y. Rock Lining - 4,099 S.Y. Seeding - 66 ACRE Addendum No. 1 was issued on December 1, 2020. Addendum No. 2 was issued on December 9, 2020. *Small Diverse Business and Veteran Business Enterprise Participation Goals: The Issuing Office and the Department of General Services’ Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) have not set Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals for this procurement. This procurement is either under the dollar threshold for setting SDB and VBE Participation goals, or the Issuing Office and BDISBO have determined that the SDB and/or VBE participation opportunities for the scope of work for this procurement are de minimis. There are no additional SDB, VBE or Small Business requirements for this procurement. However, SDB, VBE and Small Business utilization is encouraged when possible. Attachment A is not applicable under these circumstances.
12/17/2020 07:00 PM UTC
OOGM 19-3
Cleaning Out and Plugging One (1) Abandoned Well Mill Creek Township, Lycoming County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 120 calendar days Bid Bond Not Required Principal Items of Work and Approximate Quantities: Prepare and restore well site. Mobilize and demobilize plugging equipment. Clean-out and plug one abandoned well, estimated to be up to 6,854 feet in depth, to Department specifications.
10/29/2020 06:00 PM UTC
OSM 17(6806)101.1
Abandoned Mine Reclamation Project Weber Run South Cooper Township, Clearfield County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 210 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clearing and Grubbing, 1 L.S. Grading, 80,100 C.Y. Seeding, 9.5 Acre
09/17/2020 06:00 PM UTC
OSM 24(3895)102.1
Abandoned Mine Reclamation Project Winslow Hill III (East) Benezette Township, Elk County Estimated Amount: $500,000 to $1,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clearing and Grubbing, 1 L.S. Alkaline Addition, 4,608 Ton Subsurface Drain with Cleanout, 250 L.F. Grading, 524,000 C.Y. Erosion Matting, 1,950 S.Y. Rock Lining, 100 S.Y. Culvert Pipe - Eighteen Inch (18") Smooth-Interior Corrugated N-12 Pipe, 50 L.F. Culvert Pipe - Twelve Inch (12") Smooth-Interior Corrugated N-12 Pipe, 30 L.F. Seeding, 45 Acre Tree Planting, 260 Tree Stone Aggregate, AASHTO No. 1 Stone, 328 Ton Stone Aggregate, PA DOT No. 2A Stone, 192 Ton
09/10/2020 06:00 PM UTC
131 - 140 of 218 Solicitations
1 2 … 10 11 12 14 16 17 18 … 21 22