EC-02-10060-26
Storage Tank Removal Project
Paul's Auto Service
Baldwin Township, Allegheny County
Estimated Amount: $0 to $100,000 (Small Business Only)
Term: 90 calendar days
No Bid Bond Required
Principal Items of Work and Approximate Quantities:
Removal of 4 fiberglass underground storage tanks. (Two 8,000 gallon and two 6,000 gallon tanks.)
Four tanks are presumed to be empty (less than an inch of fluid at the last inspection). There may be a need to pump the tanks if water or product is found in them.
A closure report is required as well as closure sampling.
| 11/05/2026 07:00 PM UTC |
|
OOGM FS26-6
Cleaning Out and Plugging Twenty-Three (23) Orphan Gas Wells
Mahoning and Redbank Townships, Armstrong County
Porter and Redbank Townships, Clarion County
Estimated Amount: $1,000,000 to $5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug twenty-three (23) orphan gas wells, estimated to be 1,000-3,600 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 7, 2026, and October 8, 2026, at 9:00 a.m.
Department representatives will meet contractors at:
Gumtown Memorial Park
240 Water Street
New Bethlehem, PA 16242
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 11/12/2026 07:00 PM UTC |
|
OSM 02(1454)102.1
Abandoned Mine Reclamation Project
Beulah Road Wilkins Township (Lucia Drive)
Wilkins Township, Allegheny County
Estimated Amount: $1,000,000 to $5,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.
Clearing and Grubbing, 1 L.S.
Trench Excavation, 2,575 C.Y.
Subsurface Drain – Eight-Inch (8”) Nominal Diameter Perforated PVC SDR-35 Pipe, 1,088 L.F.
Subsurface Drain – Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 78 L.F.
Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 3,680 C.Y.
Subsurface Drain – AASHTO No. 57 Coarse Aggregate, 173 C.Y.
Subsurface Drain – Precast Concrete Inlet, 1 EACH
Subsurface Drain – Precast Concrete Manhole, 1 EACH
Segmented Retaining Wall with Geogrid Reinforcement - Retaining Wall, 3,150 S.F.
Segmented Retaining Wall with Geogrid Reinforcement - Eight-Inch (8") Nominal Diameter Perforated PVC SDR-35 Pipe, 898 L.F.
Concrete Patio Replacement, 250 S.Y.
Site Restoration – Seeding, 1 L.S.
Site Restoration – Topsoil, 20 TON
Site Restoration – Miscellaneous, 1 L.S.
MANDATORY Pre-Bid Conference will be held on: October 28, 2026, at 2:00 PM.
A link is available on the first page of the Final Bid Information to join the Teams Meeting.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 11/12/2026 07:00 PM UTC |
|
OSM 11,65(0948,4371)101.1
Abandoned Mine Reclamation Project
South Nanty Glo 2
Nanty Glo Borough and Jackson Township, Cambria County
Municipality of Murrysville, Westmoreland County
Estimated Amount: $1,000,000 to $5,000,000
Term: 720 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance with Wash Rack, 2 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter), 5,912 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter
Tube,351 L.F.
Clearing and Grubbing, 23.4 ACRE
Grading – Grading, 122,489 C.Y..
Grading – Ripping, 14.4 ACRE
Planting – Planting Preparation, 23.4 ACRE
Planting – Tree Seedlings, 9,790 EACH
Planting – Grass Seed, 713 LB.
Subsurface Drain, 4,520 L.F.
Chimney/Blanket Drain – AASHTO No. 8 Aggregate, 270 TON
Chimney/Blanket Drain – R-4 Rock, 104 S.Y.
Chimney/Blanket Drain – Filter Fabric, 312 S.Y.
Permanent Channel Excavation, 1,626 C.Y.
Erosion Matting, 4,642 S.Y.
Stilling Basin, 231 S.F.
Coal Refuse Disposal, 44,073 C.Y.
Coal Ash Addition – Supply and Delivery, 24,628 TON
Coal Ash Addition – Coordination, 1 L.S.
Coal Ash Addition – Placement, 24,628 TON
Access Road – Construction, 1 L.S.
Access Road – Maintenance Stone, 100 TON
Construction Surveying, Type A, 1 L.S.
| 11/12/2026 07:00 PM UTC |
|
OSM 32(3821)101.1
Abandoned Mine Lands Reclamation Project with Passive Treatment System
State Game Lands 332
Blacklick and Young Townships, Indiana County
Estimated Amount: Greater than $5,000,000
Term: 720 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
AML PRINCIPAL ITEMS:
Diversion and Care of Water, 1 L.S.
Alkaline Addition - Agricultural Limestone - Supply and Delivery, 61,200 TON
Alkaline Addition - Beneficial Ash - Supply and Delivery, 135,000 TON
Alkaline Addition - Application of Alkaline Materials, 196,200 TON
Grading - Area 1, 314,200 C.Y.
Grading - Area 2, 384,700 C.Y.
Grading - Area 3, 126,500 C.Y.
Grading - Area 4, 158,100 C.Y.
Grading - Area 5, 185,800 C.Y.
Diversion Channel and Ford Crossing Excavation, 1,616 C.Y.
Stone Aggregate, 24 TON
Rock Lining - Stream Relocation, 1,814 S.Y.
Rock Lining - Ford Crossing, 212 S.Y.
Seeding - Seed Bed Preparation, 59 ACRE
Seeding - Seed - Type 1, 2,021 LB.
Seeding - Seed - Type 2, 2,847 LB.
Seeding - Mulching, 59 ACRE
Construction Surveying, 1 L.S.
PTS PRINCIPAL ITEMS:
Wet Seal Tie-In – See Schedule of Prices Subitems
H-Flume, 1 L.S.
Agri Drain Smart Drainage Systems® - See Schedule of Prices Subitems
Terraced Iron Formation Channel - See Schedule of Prices Subitems
Holding and Settling Ponds - See Schedule of Prices Subitems
Auto Flushing Vertical Flow Ponds - See Schedule of Prices Subitems
Jennings-Type Vertical Flow Pond - See Schedule of Prices Subitems
Aerobic Wetland - See Schedule of Prices Subitems
Dewatering Basin – See Schedule of Prices Subitems
| 11/12/2026 07:00 PM UTC |
|
AMD 56(2524)104.1
Abandoned Mine Drainage Abatement Project
Oven Run Site B (AFVFP Stone Cleaning)
Shade Township, Somerset County
Estimated Amount: $300,000 to $500,000
Term: 120 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Limestone Bed Aggregate Cleaning – AASHTO No. 1 – 7830 C.Y.
Limestone Coarse Aggregate AASHTO No. 1 – 63 TON
| 11/19/2026 07:00 PM UTC |
|
OOGM 26-2
Cleaning Out and Plugging Twenty-Five (25) Orphan Gas Wells
Wetmore Township, McKean County
Estimated Amount: $1,000,000 to $5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug twenty-five (25) orphan gas wells, estimated to be 1,500 – 2,600 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 27th, 2026, at 9 A.M. & October 28th, 2026, at 10 A.M.
Department representatives will meet contractors at:
Tuesday, October 27th at 9:00 am (Day 1)
Meet at FR295A Stone Pit (See map in bid documents)
Coordinates: 41.721987, -78.818326
Wednesday, October 28th at 10:00 am (Day 2)
Meet at FR279 Stone Pit (Different time and location from day 1. See map in bid documents)
Coordinates: 41.725668, -78.784642
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OFTHE BID.
| 12/03/2026 07:00 PM UTC |
|
OSM 10,43(2910,4508)101.1
Abandoned Mine Reclamation Project
North Liberty South
Slippery Rock Township, Butler County
Liberty Township, Mercer County
Estimated Amount: $300,000 to $500,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 5,000 L.F.
Dewatering Impoundment, 1 L.S.
Clearing and Grubbing, 20 ACRE
Brush Barrier, 730 L.F.
Grading – Grading Area 1, 90,000 C.Y.
Grading – Grading Area 2, 34,000 C.Y.
Planting – Planting Preparation, 20 ACRE
Planting – Grass Seed, 1,200 LB.
Construction Surveying, Type B, 1 L.S.
| 12/03/2026 07:00 PM UTC |
|
OSM 35(2193)101.1
Abandoned Mine Reclamation Project
Rocky Glen Pond
Moosic Borough, Lackawanna County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 300 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Grading – 21,200 Cubic Yards
Backfill Mine Openings – 870 Cubic Yards
Bat Gates – 40 Linear Feet (4 Gates)
Seeding – 12 Acres
| 12/03/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSM 17(7087)101.1
Abandoned Mine Reclamation Project
Morgan Run Recreational Facility – West Decatur PO
Boggs Township, Clearfield County
Estimated Amount: $300,000 to $500,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Dewatering Impoundments, 1 L.S.
Clearing and Grubbing, 1 L.S.
Subsurface Drain with Cleanouts, 430 L.F.
Grading, 73,600 C.Y.
Parking Area Construction, 1 L.S.
Recreational Trail - Construction, 1 L.S.
Recreational Trail - Culvert Pipe, 40 L.F.
Amphitheater Construction, 1 L.S.
Erosion Matting, 1,485 S.Y.
Stone Aggregate - AASHTO No. 1, 1,800 Ton
Stone Aggregate - PA DOT No. 2A, 1,910 Ton
Rock Lining, 35 S.Y.
Seeding, 12.4 Acre
| 09/10/2020 06:00 PM UTC |
|
OSM 33(6102)101.1
Abandoned Mine Reclamation Project, Saint Tobias Cemetery, Snyder Township, Jefferson County. Mandatory Pre-Bid Meeting: No; Estimated Amount: $1,000,000 to $5,000,000; Term: 420 calendar days; Bid Bond Required.
Principal Items of Work and Approximate Quantities: Clearing and Grubbing 1 Lump Sum; Grading 162,500 C.Y.; Trench Drain
(A) Excavation 20,900 C.Y.; (B) Filter Fabric 17,595 S.Y.; (C) R-4 Rock 12,900 TON; (D) R-6 Rock 22,100 TON; Rolled Erosion Control Products 28,900 S.Y.; Access Roadway Surface Material 905 S.Y.; Seeding 22 ACRE.
| 09/03/2020 06:00 PM UTC |
|
OSM 02(1726,0385)102.1
Abandoned Mine Reclamation Project
Penn Hills
Penn Hills Township, Allegheny County
Estimated Amount: $200,000 to $299,999 (Small Business Only)
Term: 270 Calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Removal and Disposal of Garage and Solid Waste Disposal, 10 Ton
Diversion and Care of Water, 1 L.S.
Boring, 250 L.F.
Siphon Pipe and Siphoning Process, 400 L.F.
Polyethylene Pipe, 200 L.F.
Channel Excavation, 65 C.Y.
Cement Concrete Floor and Driveway, 100 S.Y.
Replacement of Garage, 1 L.S.
| 07/23/2020 06:00 PM UTC |
|
DMO 032056160.1
SR 160 Culvert Replacement Project, No. 2 Hill Mine, Shade Township, Somerset County.
Estimated Contract Amount: $0 to $100,000 (Small Business Only); Term: 60 calendar days; Bid Bond NOT Required.
Principal Items of Work and Approximate Quantities:
Maintain One Lane of Traffic Through Entire Project Duration; Remove 38’ 15” Concrete Culvert Pipe and Headwall; Install 36 L.F. 38” x 60” Elliptical Concrete Culvert Pipe; Install Headwall and Endwall, JOB; Relocate and Install 40 L.F. New 4” Pressure Sewer Line; Engineering Survey, JOB; Equipment and Materials, JOB; Install Outlet Basin, JOB; Install 60 L.F. Rip-Rap In Upstream Channel; Resurface State Route to PennDOT Specifications, JOB; Revegetate All Disturbed Area, JOB; Photographic Documentation, JOB.
MANDATORY PRE-BID MEETING:
June 23, 2020 at 10:00 A.M.
Location: 5185 Dark Shade Drive, Cairnbrook PA 15924
| 07/16/2020 06:00 PM UTC |
|
OSM 07(4339)104.1
Abandoned Mine Reclamation Project, Glenwhite (North Site), Logan Township, Blair County;
Estimated Amount: $1,000,000 to $5,000,000;
Term: 365 calendar days;
Bid Bond Required.
Principal Items of Work and Approximate Quantities:
Implementation of Erosion and Sediment Pollution Control Plan, 1 L.S.
Grading, 375,000 C.Y.
Alkaline Addition, 13,500 Ton
Rock Lining with Geotextile, 2,150 S.Y.
Seeding, 52 Acre
The gate accessing the Heritage Mining Company access road will be unlocked until July 9th for prospective bidders to access the site. The landowner would like to minimize public access through the gate so please re-close the gate when leaving the site. If you have issues opening the gate, contact Brad Collier at 814-615-9266.
| 07/09/2020 06:00 PM UTC |
|
OSM 26(0170)102.1
Abandoned Mine Reclamation Project, Tower Hill No. 1 North, Redstone Township, Fayette County
Estimated Amount: $300,000 to $500,000;
Term: 360 calendar days;
Bid Bond Required.
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Compost Filter Sock (32” Diameter), 1,200 L.F.
Alkaline Addition, 1,760 Ton
Grading, 76,000 C.Y.
R-5 Rock Lining with Filter Blanket, 2,000 S.Y.
Seeding, 8 Acre
Engineered Soil Builder Material, 8 Acre
Flexible Growth Medium, 8 Acre
| 06/25/2020 06:00 PM UTC |
|
OSM 17(7069)102.1
Abandoned Mine Reclamation Project, Bigler, Boggs Township, Clearfield County
PLEASE NOTE THAT THE BID OPENING HAS BEEN EXTENDED TO MAY 7, 2020.
Estimated Amount: $200,000 to $299,999 (Small Business Only); Term: 360 calendar days; Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, L.S.
Diversion and Care of Water, L.S.
Subsurface Drain with Cleanouts, 1,200 L.F.
Grading, 51,000 C.Y.
Rock Lining with Filter Blanket, 500 S.Y.
Seeding, 6 Acre
| 05/07/2020 06:00 PM UTC |
|
OSM 02(1712)301.1
Abandoned Mine Reclamation Project, Renton South, Plum Borough, Allegheny County.
PLEASE NOTE THAT THE BID OPENING HAS BEEN EXTENDED TO MAY 7, 2020.
Estimated Amount: $100,000 to $200,000 (Small Business Only). Term: 270 calendar days. Bid Bond NOT Required.
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan, Misc. Items
Clearing and Grubbing, 1 JOB
Selective Grading, 1 JOB
Dewatering, Diversion and Care of Water, 1 JOB
Excavating, Backfilling and Compacting for Utilities, Slotted PVC Well Pipe, Unclassified, 216 L.F.
Excavating, Backfilling and Compacting for Utilities, Slotted PVC Well Pipe, Rock Over-ex., 10 C.Y.
Excavating, Backfilling and Compacting for Utilities, Solid PVC Pipe, Unclassified, 162 L.F.
Excavating, Backfilling and Compacting for Utilities, Solid PVC Pipe, Rock Over-excavation, 20 C.Y.
Precast Concrete Manholes and Appurtenances, 1 EA.
Slotted PVC Pipe, Fittings and Appurtenances, 230 L.F.
Solid PVC Pipe, Fittings and Appurtenances, 148 L.F.
PVC Pipe, Fittings and Appurtenances, Cleanouts and Observation Ports, 3 EA.
PVC Pipe, Fittings and Appurtenances, Clay Dikes, 1EA.
PVC Geomembrane, 480 S.Y.
Paving and Roadway Appurtenances Restoration, Bituminous Driveways and Sidewalks, 1170 S.Y.
Paving and Roadway Appurtenances Restoration, Gravel Driveways and Stabilized Shoulders, 1 S.Y.
Paving and Roadway Appurtenances Restoration, Paved Shoulders, Type III, 5 S.Y.
Landscape Restoration, Plants, Shrubbery, Trees, Misc. Items
Allowance for Utility Services, 1 INVOICE
| 05/07/2020 06:00 PM UTC |
|
OSM 17(6881)101.1
Abandoned Mine Reclamation Project, Waltzvale East Waterline Extension, Gulich Township, Clearfield County. PLEASE NOTE THAT THE BID OPENING HAS BEEN EXTENDED TO APRIL 30, 2020. Estimated Amount: $500,000 to $1,000,000; Term: 120 calendar days; Bid Bond Required. Principle Items of Work and Approximate Quantities:
Eight-Inch (8") PVC Pipe or HDPE Pipe Including Fittings, 8,810 L.F.
2A Stone, 4,460 C.Y.
Service Lateral Connections, 14 EACH
Mobilization and Demobilization, 1 L.S.
Site Preparation and Restoration, 1 L.S.
| 04/30/2020 06:00 PM UTC |
|
OSM 35(1796)103.1
PLEASE NOTE THAT THE BID OPENING DATE FOR THIS PROJECT HAS BEEN EXTENDED TO APRIL 23, 2020 AT 2:00 PM.
Abandoned Mine Reclamation Project, Demolition at 1517 Euclid Avenue, Scranton, City of Scranton, Lackawanna County. Estimated Amount: $0 to $100,000 (Small Business Only); Term: 60 calendar days; Bid Bond required; Principle Items of Work and Approximate Quantities:
Removal and Disposal of Structure - 1
Clean Fill - 800 TON
Drilling Coreholes - 10 EACH
Flowable Fill - 45 CY
Chain Link Fence - 290 LF
Seeding - 1000 SY
| 04/23/2020 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.