Storage Tank Removal Project
Paul's Auto Service
Baldwin Township, Allegheny County
Estimated Amount: $0 to $100,000 (Small Business Only)
Term: 90 calendar days
No Bid Bond Required
Principal Items of Work and Approximate Quantities:
Removal of 4 fiberglass underground storage tanks. (Two 8,000 gallon and two 6,000 gallon tanks.)
Four tanks are presumed to be empty (less than an inch of fluid at the last inspection). There may be a need to pump the tanks if water or product is found in them.
A closure report is required as well as closure sampling.
| 11/05/2026 07:00 PM UTC |
|
OOGM FS26-6
Cleaning Out and Plugging Twenty-Three (23) Orphan Gas Wells
Mahoning and Redbank Townships, Armstrong County
Porter and Redbank Townships, Clarion County
Estimated Amount: $1,000,000 to $5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug twenty-three (23) orphan gas wells, estimated to be 1,000-3,600 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 7, 2026, and October 8, 2026, at 9:00 a.m.
Department representatives will meet contractors at:
Gumtown Memorial Park
240 Water Street
New Bethlehem, PA 16242
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 11/12/2026 07:00 PM UTC |
|
OSM 02(1454)102.1
Abandoned Mine Reclamation Project
Beulah Road Wilkins Township (Lucia Drive)
Wilkins Township, Allegheny County
Estimated Amount: $1,000,000 to $5,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.
Clearing and Grubbing, 1 L.S.
Trench Excavation, 2,575 C.Y.
Subsurface Drain – Eight-Inch (8”) Nominal Diameter Perforated PVC SDR-35 Pipe, 1,088 L.F.
Subsurface Drain – Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 78 L.F.
Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 3,680 C.Y.
Subsurface Drain – AASHTO No. 57 Coarse Aggregate, 173 C.Y.
Subsurface Drain – Precast Concrete Inlet, 1 EACH
Subsurface Drain – Precast Concrete Manhole, 1 EACH
Segmented Retaining Wall with Geogrid Reinforcement - Retaining Wall, 3,150 S.F.
Segmented Retaining Wall with Geogrid Reinforcement - Eight-Inch (8") Nominal Diameter Perforated PVC SDR-35 Pipe, 898 L.F.
Concrete Patio Replacement, 250 S.Y.
Site Restoration – Seeding, 1 L.S.
Site Restoration – Topsoil, 20 TON
Site Restoration – Miscellaneous, 1 L.S.
MANDATORY Pre-Bid Conference will be held on: October 28, 2026, at 2:00 PM.
A link is available on the first page of the Final Bid Information to join the Teams Meeting.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 11/12/2026 07:00 PM UTC |
|
OSM 11,65(0948,4371)101.1
Abandoned Mine Reclamation Project
South Nanty Glo 2
Nanty Glo Borough and Jackson Township, Cambria County
Municipality of Murrysville, Westmoreland County
Estimated Amount: $1,000,000 to $5,000,000
Term: 720 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance with Wash Rack, 2 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter), 5,912 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter
Tube,351 L.F.
Clearing and Grubbing, 23.4 ACRE
Grading – Grading, 122,489 C.Y..
Grading – Ripping, 14.4 ACRE
Planting – Planting Preparation, 23.4 ACRE
Planting – Tree Seedlings, 9,790 EACH
Planting – Grass Seed, 713 LB.
Subsurface Drain, 4,520 L.F.
Chimney/Blanket Drain – AASHTO No. 8 Aggregate, 270 TON
Chimney/Blanket Drain – R-4 Rock, 104 S.Y.
Chimney/Blanket Drain – Filter Fabric, 312 S.Y.
Permanent Channel Excavation, 1,626 C.Y.
Erosion Matting, 4,642 S.Y.
Stilling Basin, 231 S.F.
Coal Refuse Disposal, 44,073 C.Y.
Coal Ash Addition – Supply and Delivery, 24,628 TON
Coal Ash Addition – Coordination, 1 L.S.
Coal Ash Addition – Placement, 24,628 TON
Access Road – Construction, 1 L.S.
Access Road – Maintenance Stone, 100 TON
Construction Surveying, Type A, 1 L.S.
| 11/12/2026 07:00 PM UTC |
|
OSM 32(3821)101.1
Abandoned Mine Lands Reclamation Project with Passive Treatment System
State Game Lands 332
Blacklick and Young Townships, Indiana County
Estimated Amount: Greater than $5,000,000
Term: 720 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
AML PRINCIPAL ITEMS:
Diversion and Care of Water, 1 L.S.
Alkaline Addition - Agricultural Limestone - Supply and Delivery, 61,200 TON
Alkaline Addition - Beneficial Ash - Supply and Delivery, 135,000 TON
Alkaline Addition - Application of Alkaline Materials, 196,200 TON
Grading - Area 1, 314,200 C.Y.
Grading - Area 2, 384,700 C.Y.
Grading - Area 3, 126,500 C.Y.
Grading - Area 4, 158,100 C.Y.
Grading - Area 5, 185,800 C.Y.
Diversion Channel and Ford Crossing Excavation, 1,616 C.Y.
Stone Aggregate, 24 TON
Rock Lining - Stream Relocation, 1,814 S.Y.
Rock Lining - Ford Crossing, 212 S.Y.
Seeding - Seed Bed Preparation, 59 ACRE
Seeding - Seed - Type 1, 2,021 LB.
Seeding - Seed - Type 2, 2,847 LB.
Seeding - Mulching, 59 ACRE
Construction Surveying, 1 L.S.
PTS PRINCIPAL ITEMS:
Wet Seal Tie-In – See Schedule of Prices Subitems
H-Flume, 1 L.S.
Agri Drain Smart Drainage Systems® - See Schedule of Prices Subitems
Terraced Iron Formation Channel - See Schedule of Prices Subitems
Holding and Settling Ponds - See Schedule of Prices Subitems
Auto Flushing Vertical Flow Ponds - See Schedule of Prices Subitems
Jennings-Type Vertical Flow Pond - See Schedule of Prices Subitems
Aerobic Wetland - See Schedule of Prices Subitems
Dewatering Basin – See Schedule of Prices Subitems
| 11/12/2026 07:00 PM UTC |
|
AMD 56(2524)104.1
Abandoned Mine Drainage Abatement Project
Oven Run Site B (AFVFP Stone Cleaning)
Shade Township, Somerset County
Estimated Amount: $300,000 to $500,000
Term: 120 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Limestone Bed Aggregate Cleaning – AASHTO No. 1 – 7830 C.Y.
Limestone Coarse Aggregate AASHTO No. 1 – 63 TON
| 11/19/2026 07:00 PM UTC |
|
OOGM 26-2
Cleaning Out and Plugging Twenty-Five (25) Orphan Gas Wells
Wetmore Township, McKean County
Estimated Amount: $1,000,000 to $5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug twenty-five (25) orphan gas wells, estimated to be 1,500 – 2,600 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 27th, 2026, at 9 A.M. & October 28th, 2026, at 10 A.M.
Department representatives will meet contractors at:
Tuesday, October 27th at 9:00 am (Day 1)
Meet at FR295A Stone Pit (See map in bid documents)
Coordinates: 41.721987, -78.818326
Wednesday, October 28th at 10:00 am (Day 2)
Meet at FR279 Stone Pit (Different time and location from day 1. See map in bid documents)
Coordinates: 41.725668, -78.784642
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OFTHE BID.
| 12/03/2026 07:00 PM UTC |
|
OSM 10,43(2910,4508)101.1
Abandoned Mine Reclamation Project
North Liberty South
Slippery Rock Township, Butler County
Liberty Township, Mercer County
Estimated Amount: $300,000 to $500,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 5,000 L.F.
Dewatering Impoundment, 1 L.S.
Clearing and Grubbing, 20 ACRE
Brush Barrier, 730 L.F.
Grading – Grading Area 1, 90,000 C.Y.
Grading – Grading Area 2, 34,000 C.Y.
Planting – Planting Preparation, 20 ACRE
Planting – Grass Seed, 1,200 LB.
Construction Surveying, Type B, 1 L.S.
| 12/03/2026 07:00 PM UTC |
|
OSM 35(2193)101.1
Abandoned Mine Reclamation Project
Rocky Glen Pond
Moosic Borough, Lackawanna County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 300 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Grading – 21,200 Cubic Yards
Backfill Mine Openings – 870 Cubic Yards
Bat Gates – 40 Linear Feet (4 Gates)
Seeding – 12 Acres
| 12/03/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSM 26(4732)101.1
Abandoned Mine Reclamation Project, Lake Lynn West, Springhill Township, Fayette County. Estimated Amount: $300,000-$500,000. Term:365 calendar days. Bid Bond Required.
Principal Items of Work and Approximate Quantities:
Mine Seal Construction- Coarse Aggregate, 680 Ton
Mine Seal Construction- Mine Drain Pipe, 1,020 L.F.
Grading, 55,600 C.Y.
Alkaline Addition, 620 Ton
Rock Lining with Geotextile, 1,145 S.Y.
Seeding, 13.2 Acre
| 04/23/2020 06:00 PM UTC |
|
OSM 14(0880)101.1
Abandoned Mine Reclamation Project, Shettleston, Snow Shoe Township, Centre County
Estimated Amount: $1,000,000 to $5,000,000
Term: 545 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clearing and Grubbing, 44.7 Acre
Grading, 390,507 C.Y.
Alkaline Addition, 14,880 Ton
Trees, 38,275 Seedling
No Mandatory Pre-Bid Meeting.
| 01/30/2020 07:00 PM UTC |
|
OSM 35(2080)105.1 DGS 193-43 Phase 1
Abandoned Mine Reclamation Project, Sterry Creek South - Dolph Mine Fire, Olyphant Borough, Lackawanna County.
ADDENDUM NO. 1, ADDENDUM NO. 2 AND ADDENDUM NO. 3 HAVE BEEN UPLOADED UNDER ATTACHMENT LIST. THESE ADDENDUMS MUST BE SIGNED, DATED AND SUBMITTED WITH YOUR BID. Estimated Amount: Greater than $5,000,000. Term: 1,000 calendar days. Bid Bond Required.
Principal Items of Work and Approximate Quantities - Base Bid: 1 Mobilization and Demobilization 1 L.S., 2A1 Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance - Geotextile Installation 360 S.Y.,
2A2 Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance - AASHTO #1 Aggregate Placement 160 TON, 2A3 Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance - AASHTO #1 Aggregate Removal 160 TON, 2A4 Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance - Geotextile Removal 360 S.Y., 2B1 Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock - Install and Maintain 18" Compost Filter Sock 2,410 L.F., 2B2 Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock - Install and Maintain 24" Compost Filter Sock 200 L.F., 2B3 Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock - Remove Stakes and Cut Open 18" Compost Filter Sock 2,410 L.F., 2B4 Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock - Remove Stakes and Cut Open 24" Compost Filter Sock 200 L.F., 2C Implementation of the Erosion and Sediment Pollution Control Plan - Rock Filter Outlets 4 EA., 2D Implementation of the Erosion and Sediment Pollution Control Plan - Pumped Water Filter Bag 3 EA., 2E Implementation of the Erosion and Sediment Pollution Control Plan - Orange Construction Fence 200 L.F., 3 Clearing and Grubbing 1 L.S., 4A Access Roads - Access Road 'A' 1 L.S., 4B Access Roads - Access Road 'D' 1 L.S., 4C Access Roads - Access Road 'E' 1 L.S., 5 Access Gate 3 EA., 6 Underground Utility Line Equipment Crossing 10 EA., 7 Temporary Stream Crossing 1 EA., 8A Water Storage Ponds - Pond 1, 1 EA., 8B Water Storage Ponds - Pond 2, 1 EA., 8C Water Storage Ponds - Pond 3, 1 EA., 9B Water Supply - Develop 2018 Drawdown Well Water Source 1 L.S., 9C Water Supply - Develop Valley View Drive Water Source 1 L.S., 9D Water Supply - Water 50,000 PER 1000 GALLONS, 11 Fire Fighting Foam 8,000 GALLONS, 12A Excavation/Backfilling - Overburden/Quenched Material 1,367,500 C.Y., 12B Excavation/Backfilling - Special Handling of Coal 139,100 C.Y., 12C Excavation/Backfilling - Excavation for Backfilling/Final Grading 755,000 C.Y., 12D Excavation/Backfilling - Alkaline Addition Materials 2,500 TON, 13A Blasting - Blasting 559,500 C.Y., 13B Blasting - Pre-Blast Survey 9 EA., 13C Blasting - Post-Blast Survey 9 EA., 14 Drilling Monitoring Boreholes 300 L.F., 15 Steel Casing for Boreholes 300 L.F., 16A Rolled Erosion Control Products - NAG C350 3,900 SY,
16B Rolled Erosion Control Products - NAG SC250 1,280 SY, 16C Rolled Erosion Control Products - NAG W3000 5,150 SY, 17A Seeding - Seed Mixture 1, 95 ACRE, 17B Seeding - Seed Mixture 2, 20 ACRE, 17C Seeding - Supplements 115 ACRE, 17D Seeding - Mulch 115 ACRE, 18 Fence Removal 7,200 L.F., 19 Office Facility 1 L.S.
Principal Items of Work and Approximate Quantities - Alternate Bid #1: 5 Access Gate 1 EA., 7 Temporary Stream Crossing 1 EA., 9A Develop Marshwood Reservoir Water Source 1 LS,
10 Jack and Bore of State Road 1 LS.
Mandatory Pre-Bid Meeting will be held on December 18, 2019 from 10:00 a.m. to 12:00 noon at PA Department of Transportation, Maintenance District 4-0 / Lackawanna County 4-2, 1034 Morgan Highway, Clarks Summit, PA 18411.
| 01/16/2020 07:00 PM UTC |
|
OSM 61(1166)101.1
Abandoned Mine Reclamation Project, Dennison Run, Victory Township, Venango County.
Estimated Amount: $200,000 to $299,999 (Small Business Only)
Term: 210 Calendar Days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Grading, 57,000 C.Y.
Engineered Soil Builder Material, 13 Acre
Flexible Growth Medium, 13 Acre
Seeding, 13 Acre
| 01/16/2020 07:00 PM UTC |
|
OSM 11(2725)102.1
Abandoned Mine Reclamation Project, Lilly East
Lilly Borough and Washington Township, Cambria County
Estimated Amount: $0 to $100,000 (Small Business Only)
Term: 180 calendar days
Bid Bond Required
Principle Items of Work and Approximate Quantities:
Alkaline Addition, 250 Ton
Selective Grading, 300 S.Y.
Grading, 2,700 C.Y.
Channel and Dissipater Excavation, 150 C.Y.
Erosion Matting, 330 S.Y.
Rock Lining, 35 S.Y.
Seeding 1.2 Acres
| 01/07/2020 07:00 PM UTC |
|
OSM 11(0824)102.1
Abandoned Mine Reclamation Project
Carrolltown Road No. 1 (II)
West Carroll Township, Cambria County
Estimated Amount: $300,000 to $500,000
Term: 240 calendar days
Bid Bond Required
Principle Items of Work and Approximate Quantities: Clearing and Grubbing, 9.8 ACRE; Installation of Thirty-Two-Inch (32”) Compost Filter Socks, 1,150 L.F.; Construction of Rock Sump – R-6 Non-Calcareous Coarse Aggregate, 1,150 TON; Construction of Rock Sump – R-3 Non-Calcareous Coarse Aggregate, 270 TON; Grading, 131,013 C.Y.; Orphan Gas Well, 1 L.S.; Gate, 1 L.S.; Seeding – Mulching, 10.2 ACRE.
| 12/05/2019 07:00 PM UTC |
|
OSM 02(2195)101.1
Abandoned Mine Reclamation Project, West Allegheny School, North Fayette Township, Allegheny County. Estimated Amount: $100,000 to $200,000 (Small Business Only). Term: 270 Calendar Days. Bid Bond Required. Principle Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1 L.S.
Grading, 35,000 C.Y.
Seeding, 8 Acre
| 12/05/2019 07:00 PM UTC |
|
OSM 24(0512)203.1
Abandoned Mine Reclamation Project, Cherry Run, Jay Township, Elk County. Estimated Amount: $1,000,000 to $5,000,000. Term: 270 Calendar Days. Bid Bond is required. Principle Items of Work and Approximate Quantities: Compost Filter Sock, 5,185 L.F.
Brush Barriers, 2,525 L.F.
Grading, 241,700 C.Y.
Coal Refuse Disposal, 19,350 C.Y.
Rock Lining, 1,010 S.Y.
Borrow Material Excavation and Permanent Ponds, 20,850 C.Y.
Seeding, 40 Acre
There is no mandatory pre-bid.
| 11/21/2019 07:00 PM UTC |
|
OOGM 19-1
Cleaning Out and Plugging Five (5) Abandoned Wells in Glade Township, Warren County. Estimated Amount: $100,000 to $200,000 (Small Business Only). Term: 210 calendar days. Bid Bond not required. Principle Items of Work and Approximate Quantities: Clean-out and plug five (5) abandoned wells, estimated to be 1,500 feet in depth, to Department specifications; Prepare and restore well sites; Mobilize and demobilize plugging equipment. The Mandatory Pre-Bid Meeting will be held on October 23, 2019 at 9:00 a.m. at 1700 Hatch Run Road, Warren, PA 16365.
| 11/14/2019 07:00 PM UTC |
|
OOGM 19-2
Cleaning Out and Plugging Seven (7) Abandoned Wells, Rouseville Borough and Cornplanter Township, Venango County. Estimated amount: $100,000 to $200,000 (Small Business Only). Term: 210 Calendar Days. Bid Bond not required. Principle Items of Work and Approximate Quantities: Clean-out and plug seven (7) abandoned wells, estimated to be 600 feet in depth, to Department specifications; Prepare and restore well sites; Mobilize and demobilize plugging equipment. The Mandatory Pre-Bid Meeting will be held on October 24, 2019 at 9:00 a.m. at Oil Creek State Park Office, 305 State Park Road, Oil City, PA 16301.
| 11/14/2019 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.