General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
EC-02-10060-26
Storage Tank Removal Project Paul's Auto Service Baldwin Township, Allegheny County Estimated Amount: $0 to $100,000 (Small Business Only) Term: 90 calendar days No Bid Bond Required Principal Items of Work and Approximate Quantities: Removal of 4 fiberglass underground storage tanks. (Two 8,000 gallon and two 6,000 gallon tanks.) Four tanks are presumed to be empty (less than an inch of fluid at the last inspection). There may be a need to pump the tanks if water or product is found in them. A closure report is required as well as closure sampling.
11/05/2026 07:00 PM UTC
OOGM FS26-6
Cleaning Out and Plugging Twenty-Three (23) Orphan Gas Wells Mahoning and Redbank Townships, Armstrong County Porter and Redbank Townships, Clarion County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-three (23) orphan gas wells, estimated to be 1,000-3,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 7, 2026, and October 8, 2026, at 9:00 a.m. Department representatives will meet contractors at: Gumtown Memorial Park 240 Water Street New Bethlehem, PA 16242 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
11/12/2026 07:00 PM UTC
OSM 02(1454)102.1
Abandoned Mine Reclamation Project Beulah Road Wilkins Township (Lucia Drive) Wilkins Township, Allegheny County Estimated Amount: $1,000,000 to $5,000,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Clearing and Grubbing, 1 L.S. Trench Excavation, 2,575 C.Y. Subsurface Drain – Eight-Inch (8”) Nominal Diameter Perforated PVC SDR-35 Pipe, 1,088 L.F. Subsurface Drain – Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 78 L.F. Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 3,680 C.Y. Subsurface Drain – AASHTO No. 57 Coarse Aggregate, 173 C.Y. Subsurface Drain – Precast Concrete Inlet, 1 EACH Subsurface Drain – Precast Concrete Manhole, 1 EACH Segmented Retaining Wall with Geogrid Reinforcement - Retaining Wall, 3,150 S.F. Segmented Retaining Wall with Geogrid Reinforcement - Eight-Inch (8") Nominal Diameter Perforated PVC SDR-35 Pipe, 898 L.F. Concrete Patio Replacement, 250 S.Y. Site Restoration – Seeding, 1 L.S. Site Restoration – Topsoil, 20 TON Site Restoration – Miscellaneous, 1 L.S. MANDATORY Pre-Bid Conference will be held on: October 28, 2026, at 2:00 PM. A link is available on the first page of the Final Bid Information to join the Teams Meeting. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID. READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
11/12/2026 07:00 PM UTC
OSM 11,65(0948,4371)101.1
Abandoned Mine Reclamation Project South Nanty Glo 2 Nanty Glo Borough and Jackson Township, Cambria County Municipality of Murrysville, Westmoreland County Estimated Amount: $1,000,000 to $5,000,000 Term: 720 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance with Wash Rack, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 5,912 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube,351 L.F. Clearing and Grubbing, 23.4 ACRE Grading – Grading, 122,489 C.Y.. Grading – Ripping, 14.4 ACRE Planting – Planting Preparation, 23.4 ACRE Planting – Tree Seedlings, 9,790 EACH Planting – Grass Seed, 713 LB. Subsurface Drain, 4,520 L.F. Chimney/Blanket Drain – AASHTO No. 8 Aggregate, 270 TON Chimney/Blanket Drain – R-4 Rock, 104 S.Y. Chimney/Blanket Drain – Filter Fabric, 312 S.Y. Permanent Channel Excavation, 1,626 C.Y. Erosion Matting, 4,642 S.Y. Stilling Basin, 231 S.F. Coal Refuse Disposal, 44,073 C.Y. Coal Ash Addition – Supply and Delivery, 24,628 TON Coal Ash Addition – Coordination, 1 L.S. Coal Ash Addition – Placement, 24,628 TON Access Road – Construction, 1 L.S. Access Road – Maintenance Stone, 100 TON Construction Surveying, Type A, 1 L.S.
11/12/2026 07:00 PM UTC
OSM 32(3821)101.1
Abandoned Mine Lands Reclamation Project with Passive Treatment System State Game Lands 332 Blacklick and Young Townships, Indiana County Estimated Amount: Greater than $5,000,000 Term: 720 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: AML PRINCIPAL ITEMS: Diversion and Care of Water, 1 L.S. Alkaline Addition - Agricultural Limestone - Supply and Delivery, 61,200 TON Alkaline Addition - Beneficial Ash - Supply and Delivery, 135,000 TON Alkaline Addition - Application of Alkaline Materials, 196,200 TON Grading - Area 1, 314,200 C.Y. Grading - Area 2, 384,700 C.Y. Grading - Area 3, 126,500 C.Y. Grading - Area 4, 158,100 C.Y. Grading - Area 5, 185,800 C.Y. Diversion Channel and Ford Crossing Excavation, 1,616 C.Y. Stone Aggregate, 24 TON Rock Lining - Stream Relocation, 1,814 S.Y. Rock Lining - Ford Crossing, 212 S.Y. Seeding - Seed Bed Preparation, 59 ACRE Seeding - Seed - Type 1, 2,021 LB. Seeding - Seed - Type 2, 2,847 LB. Seeding - Mulching, 59 ACRE Construction Surveying, 1 L.S. PTS PRINCIPAL ITEMS: Wet Seal Tie-In – See Schedule of Prices Subitems H-Flume, 1 L.S. Agri Drain Smart Drainage Systems® - See Schedule of Prices Subitems Terraced Iron Formation Channel - See Schedule of Prices Subitems Holding and Settling Ponds - See Schedule of Prices Subitems Auto Flushing Vertical Flow Ponds - See Schedule of Prices Subitems Jennings-Type Vertical Flow Pond - See Schedule of Prices Subitems Aerobic Wetland - See Schedule of Prices Subitems Dewatering Basin – See Schedule of Prices Subitems
11/12/2026 07:00 PM UTC
AMD 56(2524)104.1
Abandoned Mine Drainage Abatement Project Oven Run Site B (AFVFP Stone Cleaning) Shade Township, Somerset County Estimated Amount: $300,000 to $500,000 Term: 120 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Limestone Bed Aggregate Cleaning – AASHTO No. 1 – 7830 C.Y. Limestone Coarse Aggregate AASHTO No. 1 – 63 TON
11/19/2026 07:00 PM UTC
OOGM 26-2
Cleaning Out and Plugging Twenty-Five (25) Orphan Gas Wells Wetmore Township, McKean County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-five (25) orphan gas wells, estimated to be 1,500 – 2,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 27th, 2026, at 9 A.M. & October 28th, 2026, at 10 A.M. Department representatives will meet contractors at: Tuesday, October 27th at 9:00 am (Day 1) Meet at FR295A Stone Pit (See map in bid documents) Coordinates: 41.721987, -78.818326 Wednesday, October 28th at 10:00 am (Day 2) Meet at FR279 Stone Pit (Different time and location from day 1. See map in bid documents) Coordinates: 41.725668, -78.784642 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OFTHE BID.
12/03/2026 07:00 PM UTC
OSM 10,43(2910,4508)101.1
Abandoned Mine Reclamation Project North Liberty South Slippery Rock Township, Butler County Liberty Township, Mercer County Estimated Amount: $300,000 to $500,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 5,000 L.F. Dewatering Impoundment, 1 L.S. Clearing and Grubbing, 20 ACRE Brush Barrier, 730 L.F. Grading – Grading Area 1, 90,000 C.Y. Grading – Grading Area 2, 34,000 C.Y. Planting – Planting Preparation, 20 ACRE Planting – Grass Seed, 1,200 LB. Construction Surveying, Type B, 1 L.S.
12/03/2026 07:00 PM UTC
OSM 35(2193)101.1
Abandoned Mine Reclamation Project Rocky Glen Pond Moosic Borough, Lackawanna County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 300 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Grading – 21,200 Cubic Yards Backfill Mine Openings – 870 Cubic Yards Bat Gates – 40 Linear Feet (4 Gates) Seeding – 12 Acres
12/03/2026 07:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OOGM FS26-3
Cleaning Out and Plugging One (1) Abandoned Gas Well Moon Township, Allegheny County Estimated Amount: $100,000-$200,000 (Small Business Only) Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug one (1) abandoned gas well, estimated to be approximately 2000’ feet in depth, to Department specifications. Prepare and restore well site Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: May 13, 2026, at 10:00 a.m. Department representatives will meet contractors at: Robert Morris University Parking Area on Colonial Way (Next to Baseball Field) 40.523194, -80.210583 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
06/18/2026 06:00 PM UTC
OSM 05(2002,7054)101.1
Abandoned Mine Reclamation Project Kimber Mountain NW Broad Top Township, Bedford County Estimated Amount: Greater than $5,000,000 Term: 730 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 4 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 17,674 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Riprap Apron, 89 S.Y. Clearing and Grubbing – Grading Area 1, 79.0 ACRE Clearing and Grubbing – Grading Area 2, 17.2 ACRE Clearing and Grubbing – Grading Area 3, 7.4 ACRE Clearing and Grubbing – Grading Area 4, 1.9 ACRE Clearing and Grubbing – Grading Area 5, 35.6 ACRE Clearing and Grubbing – Grading Area 6, 7.5 ACRE Access Road – New Road Construction, 1,826 L.F. Access Road – Install Two-Inch (2”) PennDOT 2A on all roads at end of project, 2,229 TON Subsurface Drain, 3,844 L.F. Dewatering Impoundments, 1 L.S. Grading – Grading Area 1, 1,133,874 C.Y. Grading – Grading Area 2, 114,232 C.Y. Grading – Grading Area 3, 33,166 C.Y. Grading – Grading Area 4, 8,618 C.Y. Grading – Grading Area 5, 490,907 C.Y. Grading – Grading Area 6, 68,351 C.Y. Permanent Channel Excavation, 360 C.Y. Rock Lining, 270 S.Y. Seeding – Seed Bed Preparation, 148.6 ACRE Seeding – Seed, 6,241 LB. Woodrat Mitigation Structures, 9 EACH MANDATORY Pre-Bid Conference will be held on: June 1, 2026, at 9:00 a.m. Department representatives will meet contractors at: 40°07'23.19"N 78°14'20.28"W FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
06/18/2026 06:00 PM UTC
OSM 61(0807,6967)101.1
Abandoned Mine Reclamation Project Smith Corners Clinton Township, Venango County Estimated Amount: $500,000 to $1,000,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 3 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 4,650 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube,145 L.F. Clearing and Grubbing, 23.1 ACRE Grading – Grading Area 1, 24,450 C.Y. Grading – Grading Area 2, 141,209 C.Y. Grading – Grading Area 3, 13,626 C.Y. Grading – Ripping, 15.2 ACRE Planting – Planting Preparation, 23.1 ACRE Planting – Tree Seedlings, 10,345 EACH Planting – Grass Seed, 240 LB. Subsurface Drain, 1,990 L.F. Permanent Channel Excavation, 208 C.Y. Erosion Matting, 767 S.Y. Selective Grading, 200 ACRE Implementation of the Traffic Control Plan, 1 L.S.
06/04/2026 06:00 PM UTC
OSM 17(6425)101.1
Abandoned Mine Reclamation Project Keewaydin Covington and Karthaus Townships, Clearfield County Estimated Amount: $1,000,000-$5,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (24” Diameter), 2,580 L.F. Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 4,370 L.F. Clearing and Grubbing, 20 ACRE Demolition, Removal and Disposal of Buildings and Equipment, 1 L.S. Dewatering and Diversion and Care of Water, 1 L.S. Stream Crossings - Stream Crossing 1 - Rock Ford, 200 TON Stream Crossings - Stream Crossing 2 - 60" RCEP, 50 L.F. Stream Crossings - Stream Crossing 2 - R-6 Rock, 50 S.Y. Stream Crossings - Stream Crossing 2 - 2A Aggregate, 90 C.Y. Stream Crossings - Stream Crossing 3 - 72" RCEP, 150 L.F. Stream Crossings - Stream Crossing 3 - R-6 Rock, 180 S.Y. Stream Crossings - Stream Crossing 3 - 2A Aggregate, 230 C.Y. Special Handling of Refuse Material - Baghouse Lime, 2,700 TON Special Handling of Refuse Material - Placement of Refuse Mixture, 42,420 C.Y. Grading – Grading, 70,000 C.Y. Grading – Ripping, 10 ACRE Selective Grading, 10 ACRE Access Road, 2,600 L.F. Planting/Seeding - Planting Preparation, 20 ACRE Planting/Seeding - Tree Seedlings, 6,800 EACH
06/04/2026 06:00 PM UTC
OOGM FS26-1
Cleaning Out and Plugging Four (4) Abandoned Gas Wells Plum Borough, Allegheny County Murrysville and Salem Township, Westmoreland County Estimated Amount: $300,000-$500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug four (4) abandoned gas wells, estimated to be 1,500 to 4,800 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: May 6, 2026, at 10:00 a.m. Department representatives will meet contractors at: Royal Highlands Park 40.444473, -79.702353 3740 Gun Club Road Murrysville, PA FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
05/28/2026 06:00 PM UTC
OSM 24(0961)101.1
Abandoned Mine Reclamation Project Hyde Lake South Horton Township, Elk County Estimated Amount: $1,000,000-$5,000,000 Term: 730 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 17,890 L.F. Clearing and Grubbing, 123 ACRE Grading – Grading Area 1, 605,942 C.Y. Grading – Grading Area 2, 760,081 C.Y. Grading – Reestablish Roadways, 11,280 L.F. Seeding – Planting Preparation, 123 ACRE Seeding – Grass Seed, 8,610 LB. Incorporation of Paper Mill Sludge, INVOICE Permanent Channel Excavation, 404 C.Y. Rock Lined Channel, 878 S.Y. Subsurface Drain, 400 L.F. Brush Barrier, 10,050 L.F.
05/28/2026 06:00 PM UTC
OSM 16(6036,6037)101.1
Abandoned Mine Reclamation Project Hawthorn West Hawthorn Borough and Redbank Township, Clarion County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 12,000 L.F. Clearing and Grubbing – Clearing and Grubbing, 65.8 ACRE Grading – Grading Area A, 26,892 C.Y. Grading – Grading Area B, 276,471 C.Y. Grading – Grading Area C, 8,763 C.Y. Grading – Grading Area D, 14,542 C.Y. Grading – Grading Area E, 12,186 C.Y. Grading – Grading Area F, 49,275 C.Y. Grading – Grading Area G, 180 C.Y. Grading – Grading Area H, 9,968 C.Y. Grading – Ripping, 38 ACRE Grading – Hauled Material, 40,554 C.Y. Access Road, 5,200 S.Y. Planting – Planting Preparation, 65.8 ACRE Planting – Tree Seedlings, 30,800 EACH Planting – Grass Seed, 1,500 LB. Brush Piles, 13 EACH Rock Sump, 1 EACH Gas Line Relocation, 1 INVOICE
05/14/2026 06:00 PM UTC
OOGM FS25-3
Cleaning Out and Plugging Five (5) Orphan Gas Wells Sandycreek Township, Venango County Estimated Amount: $300,000-$500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug five (5) orphan gas wells, estimated to be 500-1250 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: April 1, 2026, at 10:00 a.m. Department representatives will meet contractors at: Rails to Trails entrance off Belmar Road 41.333279, -79.774949 Belmar Road, Franklin, PA 16323 https://maps.app.goo.gl/wNpiW1xebcDNKF7r5 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
05/07/2026 06:00 PM UTC
OOGM 25-2
Cleaning Out and Plugging Eleven (11) Abandoned/Orphaned Wells Howe Township, Forest County Estimated Amount: $300,000-$500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug eleven (11) Oil/Gas Wells, estimated to be up to 3,000 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: March 11, 2026, at 9:00 a.m. Department representatives will meet contractors at: Parking Area across from Minister Creek Campground on Rt. 666 in Howe Township. 41.6206396, -79.1536190 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
04/09/2026 06:00 PM UTC
OSM 17(3982)101.1 and OSM 17(3982)102.1
Abandoned Mine Reclamation Project Parsonville Northwest and Parsonville Northwest 2 Decatur Township, Clearfield County Estimated Amount: $300,000-$500,000 Term: 240 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 2,700 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Temporary Stream Crossing, 1 L.S. Clearing and Grubbing, 15.5 ACRE Grading – Grading Area 1, 26,000 C.Y. Grading – Grading Area 2, 57,000 C.Y. Planting – Planting Preparation, 15.5 ACRE
04/09/2026 06:00 PM UTC
11 - 20 of 218 Solicitations
2 4 5 6 7 8 9 … 21 22