General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
EC-02-10060-26
Storage Tank Removal Project Paul's Auto Service Baldwin Township, Allegheny County Estimated Amount: $0 to $100,000 (Small Business Only) Term: 90 calendar days No Bid Bond Required Principal Items of Work and Approximate Quantities: Removal of 4 fiberglass underground storage tanks. (Two 8,000 gallon and two 6,000 gallon tanks.) Four tanks are presumed to be empty (less than an inch of fluid at the last inspection). There may be a need to pump the tanks if water or product is found in them. A closure report is required as well as closure sampling.
11/05/2026 07:00 PM UTC
OOGM FS26-6
Cleaning Out and Plugging Twenty-Three (23) Orphan Gas Wells Mahoning and Redbank Townships, Armstrong County Porter and Redbank Townships, Clarion County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-three (23) orphan gas wells, estimated to be 1,000-3,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 7, 2026, and October 8, 2026, at 9:00 a.m. Department representatives will meet contractors at: Gumtown Memorial Park 240 Water Street New Bethlehem, PA 16242 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
11/12/2026 07:00 PM UTC
OSM 02(1454)102.1
Abandoned Mine Reclamation Project Beulah Road Wilkins Township (Lucia Drive) Wilkins Township, Allegheny County Estimated Amount: $1,000,000 to $5,000,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Clearing and Grubbing, 1 L.S. Trench Excavation, 2,575 C.Y. Subsurface Drain – Eight-Inch (8”) Nominal Diameter Perforated PVC SDR-35 Pipe, 1,088 L.F. Subsurface Drain – Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 78 L.F. Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 3,680 C.Y. Subsurface Drain – AASHTO No. 57 Coarse Aggregate, 173 C.Y. Subsurface Drain – Precast Concrete Inlet, 1 EACH Subsurface Drain – Precast Concrete Manhole, 1 EACH Segmented Retaining Wall with Geogrid Reinforcement - Retaining Wall, 3,150 S.F. Segmented Retaining Wall with Geogrid Reinforcement - Eight-Inch (8") Nominal Diameter Perforated PVC SDR-35 Pipe, 898 L.F. Concrete Patio Replacement, 250 S.Y. Site Restoration – Seeding, 1 L.S. Site Restoration – Topsoil, 20 TON Site Restoration – Miscellaneous, 1 L.S. MANDATORY Pre-Bid Conference will be held on: October 28, 2026, at 2:00 PM. A link is available on the first page of the Final Bid Information to join the Teams Meeting. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID. READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
11/12/2026 07:00 PM UTC
OSM 11,65(0948,4371)101.1
Abandoned Mine Reclamation Project South Nanty Glo 2 Nanty Glo Borough and Jackson Township, Cambria County Municipality of Murrysville, Westmoreland County Estimated Amount: $1,000,000 to $5,000,000 Term: 720 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance with Wash Rack, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 5,912 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube,351 L.F. Clearing and Grubbing, 23.4 ACRE Grading – Grading, 122,489 C.Y.. Grading – Ripping, 14.4 ACRE Planting – Planting Preparation, 23.4 ACRE Planting – Tree Seedlings, 9,790 EACH Planting – Grass Seed, 713 LB. Subsurface Drain, 4,520 L.F. Chimney/Blanket Drain – AASHTO No. 8 Aggregate, 270 TON Chimney/Blanket Drain – R-4 Rock, 104 S.Y. Chimney/Blanket Drain – Filter Fabric, 312 S.Y. Permanent Channel Excavation, 1,626 C.Y. Erosion Matting, 4,642 S.Y. Stilling Basin, 231 S.F. Coal Refuse Disposal, 44,073 C.Y. Coal Ash Addition – Supply and Delivery, 24,628 TON Coal Ash Addition – Coordination, 1 L.S. Coal Ash Addition – Placement, 24,628 TON Access Road – Construction, 1 L.S. Access Road – Maintenance Stone, 100 TON Construction Surveying, Type A, 1 L.S.
11/12/2026 07:00 PM UTC
OSM 32(3821)101.1
Abandoned Mine Lands Reclamation Project with Passive Treatment System State Game Lands 332 Blacklick and Young Townships, Indiana County Estimated Amount: Greater than $5,000,000 Term: 720 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: AML PRINCIPAL ITEMS: Diversion and Care of Water, 1 L.S. Alkaline Addition - Agricultural Limestone - Supply and Delivery, 61,200 TON Alkaline Addition - Beneficial Ash - Supply and Delivery, 135,000 TON Alkaline Addition - Application of Alkaline Materials, 196,200 TON Grading - Area 1, 314,200 C.Y. Grading - Area 2, 384,700 C.Y. Grading - Area 3, 126,500 C.Y. Grading - Area 4, 158,100 C.Y. Grading - Area 5, 185,800 C.Y. Diversion Channel and Ford Crossing Excavation, 1,616 C.Y. Stone Aggregate, 24 TON Rock Lining - Stream Relocation, 1,814 S.Y. Rock Lining - Ford Crossing, 212 S.Y. Seeding - Seed Bed Preparation, 59 ACRE Seeding - Seed - Type 1, 2,021 LB. Seeding - Seed - Type 2, 2,847 LB. Seeding - Mulching, 59 ACRE Construction Surveying, 1 L.S. PTS PRINCIPAL ITEMS: Wet Seal Tie-In – See Schedule of Prices Subitems H-Flume, 1 L.S. Agri Drain Smart Drainage Systems® - See Schedule of Prices Subitems Terraced Iron Formation Channel - See Schedule of Prices Subitems Holding and Settling Ponds - See Schedule of Prices Subitems Auto Flushing Vertical Flow Ponds - See Schedule of Prices Subitems Jennings-Type Vertical Flow Pond - See Schedule of Prices Subitems Aerobic Wetland - See Schedule of Prices Subitems Dewatering Basin – See Schedule of Prices Subitems
11/12/2026 07:00 PM UTC
AMD 56(2524)104.1
Abandoned Mine Drainage Abatement Project Oven Run Site B (AFVFP Stone Cleaning) Shade Township, Somerset County Estimated Amount: $300,000 to $500,000 Term: 120 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Limestone Bed Aggregate Cleaning – AASHTO No. 1 – 7830 C.Y. Limestone Coarse Aggregate AASHTO No. 1 – 63 TON
11/19/2026 07:00 PM UTC
OOGM 26-2
Cleaning Out and Plugging Twenty-Five (25) Orphan Gas Wells Wetmore Township, McKean County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-five (25) orphan gas wells, estimated to be 1,500 – 2,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 27th, 2026, at 9 A.M. & October 28th, 2026, at 10 A.M. Department representatives will meet contractors at: Tuesday, October 27th at 9:00 am (Day 1) Meet at FR295A Stone Pit (See map in bid documents) Coordinates: 41.721987, -78.818326 Wednesday, October 28th at 10:00 am (Day 2) Meet at FR279 Stone Pit (Different time and location from day 1. See map in bid documents) Coordinates: 41.725668, -78.784642 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OFTHE BID.
12/03/2026 07:00 PM UTC
OSM 10,43(2910,4508)101.1
Abandoned Mine Reclamation Project North Liberty South Slippery Rock Township, Butler County Liberty Township, Mercer County Estimated Amount: $300,000 to $500,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 5,000 L.F. Dewatering Impoundment, 1 L.S. Clearing and Grubbing, 20 ACRE Brush Barrier, 730 L.F. Grading – Grading Area 1, 90,000 C.Y. Grading – Grading Area 2, 34,000 C.Y. Planting – Planting Preparation, 20 ACRE Planting – Grass Seed, 1,200 LB. Construction Surveying, Type B, 1 L.S.
12/03/2026 07:00 PM UTC
OSM 35(2193)101.1
Abandoned Mine Reclamation Project Rocky Glen Pond Moosic Borough, Lackawanna County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 300 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Grading – 21,200 Cubic Yards Backfill Mine Openings – 870 Cubic Yards Bat Gates – 40 Linear Feet (4 Gates) Seeding – 12 Acres
12/03/2026 07:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OOGM 17-4
Cleaning Out and Plugging One (1) Orphan Gas Well in Franklin Park Borough, Allegheny County. Contract Estimate Amount: $200,000 to $300,000 (Small Business Exempted); Term: 70 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Clean-out and plug one (1) orphan gas well, estimated to be approximately 2,000 feet in depth, to Department specifications; Prepare and Restore Well Sites/Site; Mobilize and Demobilize Plugging Equipment. A mandatory pre-bid meeting will be held on August 2, 2018 at 10:00 AM at the 2205 McAleer Road, Franklin Park, PA 15143. Failure to attend the pre-bid meeting will be cause for rejection of the bid.
08/16/2018 06:00 PM UTC
OOGM 18-1
Cleaning Out and Plugging One (1) Orphan Gas Well in Pike Township, Potter County. Contract Estimate Amount: $0 to $100,000 (Small Business Only); Term: 30 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Clean-out and plug one (1) orphan gas well, estimated to be approximately 2,000 feet in depth, to Department specifications; Prepare and restore well sites/site; Mobilize and demobilize plugging equipment. A pre-bid meeting will be held on July 26, 2018 at 10:00 AM at the intersection of Loucks Mills Road and Hard Scrabble Road, Pike Township, PA 16948 (west of Galeton).
08/09/2018 06:00 PM UTC
OSM 17(0098)101.1
Abandoned Mine Reclamation Project, Boardman – Potts Run No. 3, Knox Township, Clearfield County. Contract Estimate: $1,000,000 to $5,000,000. Term: 270 Calendar Days. Bid Bond required. Principal Items of Work and Approximate Quantities include: Mobilization and Demobilization, 1 L.S.; Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.; Subsurface Underdrains, 3,150 L.F.; Permanent Access Road and Gate, 2,170 L.F.; Alkaline Addition, 13,200 TON; Construction of Rock Sump, 1,800 TON; Clearing and Grubbing, Grading, Seeding, Tree Planting Preparation and Tree Planting, 23.7 ACRE.
07/26/2018 06:00 PM UTC
OOGM 17-3R
Cleaning Out and Plugging Two (2) Abandoned Oil and Gas Wells in Concord and Jefferson Townships, Butler County. Contract Estimate Amount: $0 to $100,000 (Small Business Only); Term: 60 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: clean-out and plug two (2) abandoned oil and gas wells, estimated to be 1,600 feet and 2,000 feet in depth, to Department specifications; prepare and restore well sites/site; and mobilize and demobilize plugging equipment. A pre-bid meeting will be held on June 8, 2018 at 10:00 AM at 3 C's Pizza, 1252 West Sunbury Road, West Sunbury, PA 16061.
06/21/2018 06:00 PM UTC
OSM 13,40(3202,3204)101.1
Abandoned Mine Reclamation Project, Beaver Brook East/Beaver Brook South, Hazle and Banks Townships, Luzerne and Carbon Counties. Contract Estimate: $100,000 to $200,000 (Small Business Only). Term: 120 Calendar Days. Bid Bond required. Principal Items of Work and Approximate Quantities include: Clearing and Grubbing 5.1 AC; Grading 44,000 CY; Drainage Excavation 936 CY; Rock Lining 962 SY.
05/03/2018 06:00 PM UTC
OOGM 17-1R
Cleaning Out and Plugging One (1) Orphan Gas Well in East Keating Township, Clinton County. Contract Estimate: $100,000 to $200,000 (Small Business Only). Term: 60 Calendar Days. Bid Bond Required. Principle Items of Work and Approximate Quantities: clean out and plug one (1) orphan gas well, estimated to be 6,000 feet in depth, to Department specifications; prepare and restore well sites/site; and mobilize and demobilize plugging equipment. MANDATORY PRE-BID meeting will be held on April 18, 2018 at 10:00 A.M. at DCNR Sproul Forest District, 15187 Renovo Road, Renovo, PA 17764. FAILURE TO ATTEND THE PRE-BID CONFERENCE WILL BE CAUSE FOR REJECTION OF THE BID.
05/01/2018 06:00 PM UTC
OSM 11(0854)101.1
Abandoned Mine Reclamation Project, Glasgow Northeast Waterline Extension, Reade Township, Cambria County; Contract Estimate Amount: $500,000 to $1,000,000; Term: 120 Calendar Days; Bid Bond Required; Principle Items of Work and Approximate Quantities: Installation of Six-Inch (6”) PVC Pipe Including Fittings, 6,800 L.F.; Service Lateral Connections, 5 Each; Roadway Crossings, 1 Each; Typical Above Ground Blow-Off Assembly, 1 Each; Hydrant Blow-Off Assembly, 1 Each; Roadway Crossings, 20 L.F.; Six-Inch (6”) Meter and Vault, 1 Each.
04/26/2018 06:00 PM UTC
OSM 32(4016)101.1
Abandoned Mine Reclamation Project, Palmer Road Waterline, Burrell Township, Indiana County; Contract Estimate Amount: $300,000 to $500,000; Term: 180 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Installation of Eight-Inch (8”) PVC Pipe Including Fittings, 3,520 L.F.; Service Lateral Connections, 12 Each; Highway Crossing, 400 L.F.; Stream Crossings, 90 L.F.; Typical Manual Air Relief Blow-off Assembly, 3 Each; Penn View Road Six-Inch (6”) Meter and Vault, 1 Each.
04/24/2018 06:00 PM UTC
OOGM 17-3
Cleaning Out and Plugging Two (2) Abandoned Oil and Gas Wells in Concord Township, Jefferson County and Butler Township, Butler County. Contract Estimate Amount: $0 to $100,000 (Small Business Only); Term: 42 calendar days; Bid Bond Required; Principal Items of Work and Approximate Quantities: clean-out and plug two (2) abandoned oil and gas wells, estimated to be 1,600 feet and 2,000 feet in depth, to Department specifications; prepare and restore well sites/site; and mobilize and demobilize plugging equipment. A pre-bid meeting will be held on March 6, 2018 at 10 a.m. at 3 C's Pizza, 1252 West Sunbury Road, West Sunbury, PA 16061.
04/05/2018 06:00 PM UTC
OSM 10(7136)101.1
Abandoned Mine Reclamation Project, Little Bear Creek East, Allegheny Township, Butler County; Contract Estimate Amount: $100,000 to $200,000 (Small Business Only); Term: 180 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S.; Channel Excavation, 750 C.Y.; Erosion Matting, 2,110 S.Y.; Dewatering Impoundment, 1 L.S.; Grading, 24,180 C.Y.; Seeding, 4.5 ACRE.
03/22/2018 06:00 PM UTC
191 - 200 of 218 Solicitations
1 2 … 14 15 16 17 18 20 22