General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
EC-02-10060-26
Storage Tank Removal Project Paul's Auto Service Baldwin Township, Allegheny County Estimated Amount: $0 to $100,000 (Small Business Only) Term: 90 calendar days No Bid Bond Required Principal Items of Work and Approximate Quantities: Removal of 4 fiberglass underground storage tanks. (Two 8,000 gallon and two 6,000 gallon tanks.) Four tanks are presumed to be empty (less than an inch of fluid at the last inspection). There may be a need to pump the tanks if water or product is found in them. A closure report is required as well as closure sampling.
11/05/2026 07:00 PM UTC
OOGM FS26-6
Cleaning Out and Plugging Twenty-Three (23) Orphan Gas Wells Mahoning and Redbank Townships, Armstrong County Porter and Redbank Townships, Clarion County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-three (23) orphan gas wells, estimated to be 1,000-3,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 7, 2026, and October 8, 2026, at 9:00 a.m. Department representatives will meet contractors at: Gumtown Memorial Park 240 Water Street New Bethlehem, PA 16242 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
11/12/2026 07:00 PM UTC
OSM 02(1454)102.1
Abandoned Mine Reclamation Project Beulah Road Wilkins Township (Lucia Drive) Wilkins Township, Allegheny County Estimated Amount: $1,000,000 to $5,000,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Clearing and Grubbing, 1 L.S. Trench Excavation, 2,575 C.Y. Subsurface Drain – Eight-Inch (8”) Nominal Diameter Perforated PVC SDR-35 Pipe, 1,088 L.F. Subsurface Drain – Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 78 L.F. Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 3,680 C.Y. Subsurface Drain – AASHTO No. 57 Coarse Aggregate, 173 C.Y. Subsurface Drain – Precast Concrete Inlet, 1 EACH Subsurface Drain – Precast Concrete Manhole, 1 EACH Segmented Retaining Wall with Geogrid Reinforcement - Retaining Wall, 3,150 S.F. Segmented Retaining Wall with Geogrid Reinforcement - Eight-Inch (8") Nominal Diameter Perforated PVC SDR-35 Pipe, 898 L.F. Concrete Patio Replacement, 250 S.Y. Site Restoration – Seeding, 1 L.S. Site Restoration – Topsoil, 20 TON Site Restoration – Miscellaneous, 1 L.S. MANDATORY Pre-Bid Conference will be held on: October 28, 2026, at 2:00 PM. A link is available on the first page of the Final Bid Information to join the Teams Meeting. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID. READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
11/12/2026 07:00 PM UTC
OSM 11,65(0948,4371)101.1
Abandoned Mine Reclamation Project South Nanty Glo 2 Nanty Glo Borough and Jackson Township, Cambria County Municipality of Murrysville, Westmoreland County Estimated Amount: $1,000,000 to $5,000,000 Term: 720 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance with Wash Rack, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 5,912 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube,351 L.F. Clearing and Grubbing, 23.4 ACRE Grading – Grading, 122,489 C.Y.. Grading – Ripping, 14.4 ACRE Planting – Planting Preparation, 23.4 ACRE Planting – Tree Seedlings, 9,790 EACH Planting – Grass Seed, 713 LB. Subsurface Drain, 4,520 L.F. Chimney/Blanket Drain – AASHTO No. 8 Aggregate, 270 TON Chimney/Blanket Drain – R-4 Rock, 104 S.Y. Chimney/Blanket Drain – Filter Fabric, 312 S.Y. Permanent Channel Excavation, 1,626 C.Y. Erosion Matting, 4,642 S.Y. Stilling Basin, 231 S.F. Coal Refuse Disposal, 44,073 C.Y. Coal Ash Addition – Supply and Delivery, 24,628 TON Coal Ash Addition – Coordination, 1 L.S. Coal Ash Addition – Placement, 24,628 TON Access Road – Construction, 1 L.S. Access Road – Maintenance Stone, 100 TON Construction Surveying, Type A, 1 L.S.
11/12/2026 07:00 PM UTC
OSM 32(3821)101.1
Abandoned Mine Lands Reclamation Project with Passive Treatment System State Game Lands 332 Blacklick and Young Townships, Indiana County Estimated Amount: Greater than $5,000,000 Term: 720 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: AML PRINCIPAL ITEMS: Diversion and Care of Water, 1 L.S. Alkaline Addition - Agricultural Limestone - Supply and Delivery, 61,200 TON Alkaline Addition - Beneficial Ash - Supply and Delivery, 135,000 TON Alkaline Addition - Application of Alkaline Materials, 196,200 TON Grading - Area 1, 314,200 C.Y. Grading - Area 2, 384,700 C.Y. Grading - Area 3, 126,500 C.Y. Grading - Area 4, 158,100 C.Y. Grading - Area 5, 185,800 C.Y. Diversion Channel and Ford Crossing Excavation, 1,616 C.Y. Stone Aggregate, 24 TON Rock Lining - Stream Relocation, 1,814 S.Y. Rock Lining - Ford Crossing, 212 S.Y. Seeding - Seed Bed Preparation, 59 ACRE Seeding - Seed - Type 1, 2,021 LB. Seeding - Seed - Type 2, 2,847 LB. Seeding - Mulching, 59 ACRE Construction Surveying, 1 L.S. PTS PRINCIPAL ITEMS: Wet Seal Tie-In – See Schedule of Prices Subitems H-Flume, 1 L.S. Agri Drain Smart Drainage Systems® - See Schedule of Prices Subitems Terraced Iron Formation Channel - See Schedule of Prices Subitems Holding and Settling Ponds - See Schedule of Prices Subitems Auto Flushing Vertical Flow Ponds - See Schedule of Prices Subitems Jennings-Type Vertical Flow Pond - See Schedule of Prices Subitems Aerobic Wetland - See Schedule of Prices Subitems Dewatering Basin – See Schedule of Prices Subitems
11/12/2026 07:00 PM UTC
AMD 56(2524)104.1
Abandoned Mine Drainage Abatement Project Oven Run Site B (AFVFP Stone Cleaning) Shade Township, Somerset County Estimated Amount: $300,000 to $500,000 Term: 120 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Limestone Bed Aggregate Cleaning – AASHTO No. 1 – 7830 C.Y. Limestone Coarse Aggregate AASHTO No. 1 – 63 TON
11/19/2026 07:00 PM UTC
OOGM 26-2
Cleaning Out and Plugging Twenty-Five (25) Orphan Gas Wells Wetmore Township, McKean County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-five (25) orphan gas wells, estimated to be 1,500 – 2,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 27th, 2026, at 9 A.M. & October 28th, 2026, at 10 A.M. Department representatives will meet contractors at: Tuesday, October 27th at 9:00 am (Day 1) Meet at FR295A Stone Pit (See map in bid documents) Coordinates: 41.721987, -78.818326 Wednesday, October 28th at 10:00 am (Day 2) Meet at FR279 Stone Pit (Different time and location from day 1. See map in bid documents) Coordinates: 41.725668, -78.784642 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OFTHE BID.
12/03/2026 07:00 PM UTC
OSM 10,43(2910,4508)101.1
Abandoned Mine Reclamation Project North Liberty South Slippery Rock Township, Butler County Liberty Township, Mercer County Estimated Amount: $300,000 to $500,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 5,000 L.F. Dewatering Impoundment, 1 L.S. Clearing and Grubbing, 20 ACRE Brush Barrier, 730 L.F. Grading – Grading Area 1, 90,000 C.Y. Grading – Grading Area 2, 34,000 C.Y. Planting – Planting Preparation, 20 ACRE Planting – Grass Seed, 1,200 LB. Construction Surveying, Type B, 1 L.S.
12/03/2026 07:00 PM UTC
OSM 35(2193)101.1
Abandoned Mine Reclamation Project Rocky Glen Pond Moosic Borough, Lackawanna County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 300 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Grading – 21,200 Cubic Yards Backfill Mine Openings – 870 Cubic Yards Bat Gates – 40 Linear Feet (4 Gates) Seeding – 12 Acres
12/03/2026 07:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OOGM 17-2
Cleaning Out and Plugging One (1) Orphan Gas Well in Chapman Township, Clinton County. Estimated Amount is $0 to $100,000 (Small Business Only). Term is 20 calendar days. Bid Bond is required. Principle Items of Work and Approximate Quantities are to clean out and plug one (1) orphan gas well, estimated to be 2,600 feet in depth, to Department specifications; to prepare and restore well sites/site; and to mobilize and demobilize plugging equipment. PRE-BID MEETING IS FEBRUARY 1, 2018 AT 11:00 AM AT 26 GRANT AVENUE, CHAPMAN TOWNSHIP (RENOVO) PA 17760.
03/08/2018 07:00 PM UTC
OSM 33(6321)101.1
Abandoned Mine Reclamation Project, McGarey South, Beaver Township, Jefferson County. Estimated Amount: $300,000 to $500,000. Term: 240 calendar days. Bid Bond Required. Principal Items of Work and Approximate Quantities: Subsurface Drains with Cleanouts, 250 L.F.; Alkaline Addition, 3,460 TON; Grading, 132,700 C.Y.; Channel and Swale Excavation, 1,025 C.Y.; Erosion Matting, 2,180 S.Y.; Rock Lining, 235 S.Y.; Seeding, 16 ACRE.
02/27/2018 07:00 PM UTC
HSCP-3-223-102.1
Hazardous Site Cleanup Project, Intercourse TCE Site Water Supply and Treatment System, Leacock Township, Lancaster County; Estimated Amount: Greater than $5,000,000; Term: 730 Calendar Days; Bid Bond Required; Principal Items of Work and Approximate Quantities: See General Contract Information. Mandatory Pre-Bid Meeting on January 17, 2018 at 10:00 a.m. in the Leacock Township Office, 3545 West Newport Road, Intercourse, PA 17534.
02/08/2018 07:00 PM UTC
OSM 17(6483)101.1
Water Main Extension Project, Pine Grove North (Glen Richey) Waterline, Lawrence Township, Clearfield County; Estimated Amount: $1,000,000 to $5,000,000; Term: 365 calendar days; Bid Bond Required; Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S.; Site Preparation and Restoration, 1 L.S.; Eight-Inch (8”) and Six-Inch (6”) PVC Pipe Including Fittings, 70,500 L.F.; Eight-Inch (8”) and Six-Inch (6”) Gate Valve and Roadway Valve Box, 70 EACH; 2A Stone, 20,445 C.Y.; Service Lateral Connections, 151 EACH; Highway Crossing Boring, 300 L.F.; Repaving - Twenty-Five (25) mm Superpave Base Course, 2,000 TON; Repaving - Nine (9) mm Superpave Wearing Course, 7,300 S.Y.; SR-153 Krebbs Highway Pressure Reducing Vault, 1 EACH; Bolted Stainless-Steel Water Storage Tank Including Foundation, 1 L.S.; Packaged Water Booster Pumping Station Complete, 1 L.S.
01/25/2018 07:00 PM UTC
OOGM 17-1
Cleaning Out and Plugging One (1) Orphan Gas Well, East Keating Township, Clinton County; Estimated Amount: $100,000 to $200,000 (Small Business Only); Term: 20 calendar days; Bid Bond required; Principal Items of Work and Approximate Quantities: Clean out and plug one (1) orphan gas well, estimated to be 6,000 feet in depth, to Department specifications; Prepare and restore well sites/site; and Mobilize and demobilize plugging equipment. A MANDATORY PRE-BID CONFERENCE WILL BE HELD ON JANUARY 4, 2018 AT 10:00 A.M. AT DCNR, SPROUL FOREST DISTRICT, 15187 RENOVO ROAD, RENOVO, PA 17764.
01/25/2018 07:00 PM UTC
AMD 54(4124)105.1
Abandoned Mine Reclamation Project, Rausch Creek Treatment Plant Upgrades, Hegins Township, Schuylkill County; Estimated Amount: $300,000-$500,000; Term: 300 calendar days; Bid Bond Required; Principle Items of Work and Approximate Quantities include: To replace certain pieces of equipment associated with the Rausch Creek Acid Mine Drainage Treatment Plant. Specifically, the standby generator, polymer mixing and distribution pumping system, and certain components of the plant water system are to be replaced. Much of the old equipment will be demolished and disposed of, including the 125-foot-tall elevated 100,000-gallon water storage tank. A MANDATORY PRE-BID MEETING WILL BE HELD ON NOVEMBER 7, 2017 at 11:00AM, Rausch Creek AMD Treatment Plant, 315 Schwenks Road, Valley View, PA 17983-0758.
12/21/2017 07:00 PM UTC
OSM 13(3206)101.1
Abandoned Mine Reclamation Project, Tresckow South, Banks Township, Carbon County; Estimated Amount $1,000,000 to $5,000,000; Term 720 calendar days; Bid Bond Required; Principle Items of Work and Approximate Quantities include Clearing and Grubbing 177.6 AC, Grading 1,937,857 CY, Drainage Excavation 8,066 CY, Granular Sodium Bentonite Clay Lining 605 TON.
12/19/2017 07:00 PM UTC
OSM 26(2783)101.1
Abandoned Mine Reclamation Project, Everson, Upper Tyrone Township, Fayette County; Estimate Amount $300,000 to $500,000; Term 120 calendar days; Bid Bond required. Principle Items of Work and Approximate Quantities: Overburden Drilling and Casing, 675 L.F.; Four-Inch (4") Air Rotary Drilling, 702 L.F.; Four-Inch (4") Nominal Steel or PVC Injection Casing, 253 L.F.; Injection of Grout Material, 2,851 TON.
11/30/2017 07:00 PM UTC
OSM 54(3103)103.1
Abandoned Mine Reclamation Project, Quick Subsidence – Phase 2 Drilling, Mahanoy Township, Schuylkill County, Estimated Amount: $500,000 to $1,000,000, Term: 120 calendar days, Bid Bond Required, Principal Items of Work and Approximate Quantities: Clearing and Grubbing, 4,840 S.Y.; Vertical Air Rotary Drilling to Accommodate Four-Inch (4”) Casing, 1,773 L.F.; Four-Inch (4”) I.D. Steel or PVC Casing, 1,122 L.F.; Fill Material Injection – Flowable Fill Material Through Boreholes, 500 C.Y.; Fill Material Injection – Concrete Fill Material Through Boreholes, 500 C.Y.; Grading, 2,300 C.Y.; Geosynthetic Clay Liner, 605 S.Y.; Topsoil, 440 TON; Seeding, 6,480 S.Y.
11/28/2017 07:00 PM UTC
OSM 26(4734)102.1
Abandoned Mine Reclamation Project, Gans Hill School, Springhill Township, Fayette County. Estimated Amount: $0 to $100,000 (Small Business Only). Term: 180 calendar days. Bid Bond Required. Principal Items of Work and Approximate Quantities include Clearing and Grubbing, 1 LS; Grading, 28,000 CY; Seed, 192 LB; Commercial Fertilizer, 640 LB; Agricultural Limestone, 12.8 TON; Mulching, 3.2 ACRE.
11/02/2017 06:00 PM UTC
201 - 210 of 218 Solicitations
1 2 … 14 15 16 17 18 19 21