Upcoming Solicitations

Number Deadline
EC-02-10060-26
Storage Tank Removal Project Paul's Auto Service Baldwin Township, Allegheny County Estimated Amount: $0 to $100,000 (Small Business Only) Term: 90 calendar days No Bid Bond Required Principal Items of Work and Approximate Quantities: Removal of 4 fiberglass underground storage tanks. (Two 8,000 gallon and two 6,000 gallon tanks.) Four tanks are presumed to be empty (less than an inch of fluid at the last inspection). There may be a need to pump the tanks if water or product is found in them. A closure report is required as well as closure sampling.
11/05/2026 07:00 PM UTC
OOGM FS26-6
Cleaning Out and Plugging Twenty-Three (23) Orphan Gas Wells Mahoning and Redbank Townships, Armstrong County Porter and Redbank Townships, Clarion County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-three (23) orphan gas wells, estimated to be 1,000-3,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 7, 2026, and October 8, 2026, at 9:00 a.m. Department representatives will meet contractors at: Gumtown Memorial Park 240 Water Street New Bethlehem, PA 16242 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
11/12/2026 07:00 PM UTC
OSM 02(1454)102.1
Abandoned Mine Reclamation Project Beulah Road Wilkins Township (Lucia Drive) Wilkins Township, Allegheny County Estimated Amount: $1,000,000 to $5,000,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Clearing and Grubbing, 1 L.S. Trench Excavation, 2,575 C.Y. Subsurface Drain – Eight-Inch (8”) Nominal Diameter Perforated PVC SDR-35 Pipe, 1,088 L.F. Subsurface Drain – Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 78 L.F. Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 3,680 C.Y. Subsurface Drain – AASHTO No. 57 Coarse Aggregate, 173 C.Y. Subsurface Drain – Precast Concrete Inlet, 1 EACH Subsurface Drain – Precast Concrete Manhole, 1 EACH Segmented Retaining Wall with Geogrid Reinforcement - Retaining Wall, 3,150 S.F. Segmented Retaining Wall with Geogrid Reinforcement - Eight-Inch (8") Nominal Diameter Perforated PVC SDR-35 Pipe, 898 L.F. Concrete Patio Replacement, 250 S.Y. Site Restoration – Seeding, 1 L.S. Site Restoration – Topsoil, 20 TON Site Restoration – Miscellaneous, 1 L.S. MANDATORY Pre-Bid Conference will be held on: October 28, 2026, at 2:00 PM. A link is available on the first page of the Final Bid Information to join the Teams Meeting. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID. READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
11/12/2026 07:00 PM UTC
OSM 11,65(0948,4371)101.1
Abandoned Mine Reclamation Project South Nanty Glo 2 Nanty Glo Borough and Jackson Township, Cambria County Municipality of Murrysville, Westmoreland County Estimated Amount: $1,000,000 to $5,000,000 Term: 720 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance with Wash Rack, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 5,912 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube,351 L.F. Clearing and Grubbing, 23.4 ACRE Grading – Grading, 122,489 C.Y.. Grading – Ripping, 14.4 ACRE Planting – Planting Preparation, 23.4 ACRE Planting – Tree Seedlings, 9,790 EACH Planting – Grass Seed, 713 LB. Subsurface Drain, 4,520 L.F. Chimney/Blanket Drain – AASHTO No. 8 Aggregate, 270 TON Chimney/Blanket Drain – R-4 Rock, 104 S.Y. Chimney/Blanket Drain – Filter Fabric, 312 S.Y. Permanent Channel Excavation, 1,626 C.Y. Erosion Matting, 4,642 S.Y. Stilling Basin, 231 S.F. Coal Refuse Disposal, 44,073 C.Y. Coal Ash Addition – Supply and Delivery, 24,628 TON Coal Ash Addition – Coordination, 1 L.S. Coal Ash Addition – Placement, 24,628 TON Access Road – Construction, 1 L.S. Access Road – Maintenance Stone, 100 TON Construction Surveying, Type A, 1 L.S.
11/12/2026 07:00 PM UTC
OSM 32(3821)101.1
Abandoned Mine Lands Reclamation Project with Passive Treatment System State Game Lands 332 Blacklick and Young Townships, Indiana County Estimated Amount: Greater than $5,000,000 Term: 720 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: AML PRINCIPAL ITEMS: Diversion and Care of Water, 1 L.S. Alkaline Addition - Agricultural Limestone - Supply and Delivery, 61,200 TON Alkaline Addition - Beneficial Ash - Supply and Delivery, 135,000 TON Alkaline Addition - Application of Alkaline Materials, 196,200 TON Grading - Area 1, 314,200 C.Y. Grading - Area 2, 384,700 C.Y. Grading - Area 3, 126,500 C.Y. Grading - Area 4, 158,100 C.Y. Grading - Area 5, 185,800 C.Y. Diversion Channel and Ford Crossing Excavation, 1,616 C.Y. Stone Aggregate, 24 TON Rock Lining - Stream Relocation, 1,814 S.Y. Rock Lining - Ford Crossing, 212 S.Y. Seeding - Seed Bed Preparation, 59 ACRE Seeding - Seed - Type 1, 2,021 LB. Seeding - Seed - Type 2, 2,847 LB. Seeding - Mulching, 59 ACRE Construction Surveying, 1 L.S. PTS PRINCIPAL ITEMS: Wet Seal Tie-In – See Schedule of Prices Subitems H-Flume, 1 L.S. Agri Drain Smart Drainage Systems® - See Schedule of Prices Subitems Terraced Iron Formation Channel - See Schedule of Prices Subitems Holding and Settling Ponds - See Schedule of Prices Subitems Auto Flushing Vertical Flow Ponds - See Schedule of Prices Subitems Jennings-Type Vertical Flow Pond - See Schedule of Prices Subitems Aerobic Wetland - See Schedule of Prices Subitems Dewatering Basin – See Schedule of Prices Subitems
11/12/2026 07:00 PM UTC
AMD 56(2524)104.1
Abandoned Mine Drainage Abatement Project Oven Run Site B (AFVFP Stone Cleaning) Shade Township, Somerset County Estimated Amount: $300,000 to $500,000 Term: 120 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Limestone Bed Aggregate Cleaning – AASHTO No. 1 – 7830 C.Y. Limestone Coarse Aggregate AASHTO No. 1 – 63 TON
11/19/2026 07:00 PM UTC
OOGM 26-2
Cleaning Out and Plugging Twenty-Five (25) Orphan Gas Wells Wetmore Township, McKean County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-five (25) orphan gas wells, estimated to be 1,500 – 2,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 27th, 2026, at 9 A.M. & October 28th, 2026, at 10 A.M. Department representatives will meet contractors at: Tuesday, October 27th at 9:00 am (Day 1) Meet at FR295A Stone Pit (See map in bid documents) Coordinates: 41.721987, -78.818326 Wednesday, October 28th at 10:00 am (Day 2) Meet at FR279 Stone Pit (Different time and location from day 1. See map in bid documents) Coordinates: 41.725668, -78.784642 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OFTHE BID.
12/03/2026 07:00 PM UTC
OSM 10,43(2910,4508)101.1
Abandoned Mine Reclamation Project North Liberty South Slippery Rock Township, Butler County Liberty Township, Mercer County Estimated Amount: $300,000 to $500,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 5,000 L.F. Dewatering Impoundment, 1 L.S. Clearing and Grubbing, 20 ACRE Brush Barrier, 730 L.F. Grading – Grading Area 1, 90,000 C.Y. Grading – Grading Area 2, 34,000 C.Y. Planting – Planting Preparation, 20 ACRE Planting – Grass Seed, 1,200 LB. Construction Surveying, Type B, 1 L.S.
12/03/2026 07:00 PM UTC
OSM 35(2193)101.1
Abandoned Mine Reclamation Project Rocky Glen Pond Moosic Borough, Lackawanna County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 300 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Grading – 21,200 Cubic Yards Backfill Mine Openings – 870 Cubic Yards Bat Gates – 40 Linear Feet (4 Gates) Seeding – 12 Acres
12/03/2026 07:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OSM 16(2826)101.1
Abandoned Mine Reclamation Project, Fairmount City, Redbank Township, Clarion County; NO Mandatory Pre-Bid Meeting; Estimate $300,000 - $500,000; Term - 270 Calendar Days; Bid Bond Required. Principal Items of Work and Approximate Quantities: Underground Storage Tank Removal, 1 LS; Demolition, Removal and Disposal of Mine Structures, 1 LS; Mine Drain, 1,500 LF; Sealing Mine Entries, 2 Each; Grading, 10,761 CY; Alkaline Addition, 910 Ton; Six-Inch (6") Thick Soil Cover, 2,936 CY.
08/31/2017 06:00 PM UTC
OSM 33(1147)101.1
Abandoned Mine Reclamation Project, Sykesville, Sykesville Borough, Jefferson County. Principal Items of Work and Approximate Quantities: Twelve-Inch (12") Subsurface Drains with Cleanouts, 206 L.F.; Cast-In-Place Inlet Box, 1 Each; Sidewalk Replacement, 40 S.Y.; Pavement Replacement, 45 S.Y. Contract estimate $0 to $100,000 (Small Business Only). Term: 150 calendar days. Bid Bond Required.
08/24/2017 06:00 PM UTC
OSM 04(4460)101.1
Abandoned Mine Reclamation Project, Homewood Southeast, North Sewickley Township, Beaver County, Contract Estimate Amount $300,000 - $500,000, Term: 270 Calendar Days, Principal Items of Work and Approx Quantities: Subsurface Drains with Cleanouts, 1,200 L.F.; Grading, 136,000 C.Y.; Erosion Matting, 2,230 S.Y.; Rock Lining, 780 S.Y.; Greer Property Drainage Conveyance, 1 L.S.; Construction of Bat Gate, 85 L.F.; Seeding, 18.4 Acres.
08/08/2017 06:00 PM UTC
OSM 24(0524)101.1
Abandoned Mine Reclamation Project, Spring Run, Jay Township, Elk County, Contract Estimate Amount: $200,000 to $299,999 (Small Business Only), Term: 270 Calendar Days, Principal Items of Work and Approx Quantities: Grading, 110,975 C.Y.; Subsurface Drains, 1,400 L.F.; Seeding, 12.2 Acres.
08/03/2017 06:00 PM UTC
OSM 03(6079)101.1
Abandoned Mine Reclamation Project, Greendale North, Valley Township, Armstrong County, Estimated Amount: $200,000 to $299,999 (Small Business Only), Term: 210 Calendar Days, Principal Items of Work & Approx Quantities: Peoples Natural Gas Representative Time During Gas Line Crossing Work, 1 Invoice; Subsurface Drain with Cleanout, 175 L.F.; Grading, 132,500 C.Y.; Seeding, 11.5 Acres.
08/01/2017 06:00 PM UTC
EC177082717
Environmental Cleanup and Brownfields Project, Removal and Disposal of (4) Underground Storage Tank Systems, Ma and Pa's Old Country Store and Restaurant, Burnside Borough, Clearfield County. Principal Items of Work and Approximate Quantities: DEP-certified “UMR” - Underground storage tank-removal, under Chapter 245.110(b)(2), oversight JOB; Excavation and removal of 4 underground storage tanks systems LS; Removal and Disposal of residual liquids 17 drums; Disposal of 4 steel underground storage tanks and associated fiberglass piping; 18 soil samples. If groundwater is present, 13 soil samples and three groundwater samples; Backfill 110 tons; Project Completion Report. Contract estimate $15,000 to $25,000. Term: 30 calendar days. MANDATORY PRE-BID SITE INSPECTION: JUNE 15, 2017 AT 10:00am, 7494 MAIN STREET, BURNSIDE PA 15721.
07/06/2017 06:00 PM UTC
AMD 18(0817)103.1
Acid Mine Drainage Abatement Project, Fran Contracting Camp Run No. 2, East Keating Township, Clinton County. The principal items of work and approximate quantities include: Excavation and Rebackfilling 1,355,097 C.Y., Alkaline Addition (Limestone Screenings) 161,200 TON, Seed Bed Preparation and Seeding 51.5 ACRE, Tree Planting – Seedlings 30,000 TREE , Rock Underdrains 1,720 L.F., Permanent Access Roads 8,667 S.Y. Contract estimate greater than $5,000,000. Term: 545 calendar days. ADDENDUM NO. 1 REQUIRED
06/06/2017 06:00 PM UTC
OSM 17(1083)102.1
Abandoned Mine Reclamation Project, South Grassflat, Cooper Township, Clearfield County, Principle Items of Work and Approximate Quantities: Clearing and Grubbing JOB Grading 265,620 C.Y. Ditch Excavation 4,800 C.Y. Rolled Erosion Control Products 2,735 S.Y. Rock Lining 2,490 S.Y. Alkaline Addition 7,338 TON Subsurface Drain 875 L.F. Gate 2 EACH Access Roadway Surface Material 3,125 S.Y. Seeding 29.5 ACRE