General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OOGM FS25-8
Cleaning Out and Plugging Twenty-Two (22) Orphan Gas Wells Keating Township, McKean County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-two (22) orphan gas wells, estimated to be 1,200-1,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: August 18, 2026, at 10:00 a.m. Department representatives will meet contractors at: Cheez’s Garage 58 Chesebro Lane Smethport, PA 16749 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
09/17/2026 06:00 PM UTC
AMD 11(2568)102.1
Passive Treatment Rehabilitation Project Bellwood Reservoir North Reade Township, Cambria County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilization. 1 L.S. Implementation of the Erosion and Sediment Plan – Rock Construction Entrance, 1 Each Implementation of the Erosion and Sediment Plan – Compost Filter Sock, 1 Each Clearing and Grubbing (approximately 7.5 acres) Grading Limestone coarse Aggregate (approximately 7,500 tons) Water Level Control Structures Settling Pond Baffles
09/24/2026 06:00 PM UTC
OOGM FS26-4
Cleaning Out and Plugging Eight (8) Orphan Gas Wells Foster and Otto Townships, McKean County Estimated Amount: $500,000 to $1,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug eight (8) orphan gas wells, estimated to be 1,200 to 1,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: September 15, 2026 at 10:00 a.m. Department representatives will meet contractors at: Otto Township VFD Station 9 118 R L Sweitzer Drive Duke Center, PA 16729 41.939576, -78.475261 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
10/15/2026 06:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
AMD 65(1183)104.1
Abandoned Mine Drainage Abatement Project Keystone Lake (Stone Cleaning) Derry Township, Westmoreland County Estimated Amount: $0 to $100,000.00 (Small Business Only) Term: 60 calendar days Bid Bond Required Principle Items of Work and Approximate Quantities: Settling Pond Baffle - 54 L.F. Settling Pond Baffle Anchor - 2 EA Limestone Bed Aggregate Cleaning - 725 C.Y. Manganese Removal Bed Aggregate Cleaning - 725 C.Y. Trail Surface Aggregate - 20 TON
02/12/2026 07:00 PM UTC
OSM 11(3261)101.1
Abandoned Mine Reclamation Project South Fork Northwest East Taylor Township, Cambria County Estimated Amount: $1,000,000 to $5,000,000 Term: 913 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 6,980 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube, 89 L.F. Clearing and Grubbing, 111.7 ACRE Grading - Grading, 1,852,294 C.Y. Grading – Hummocky Piles, 25.8 ACRE Grading – Ripping, 27.6 ACRE Planting – Planting Preparation, 111.7 ACRE Planting – Tree Seedlings, 36,318 EACH Channel Excavation – Channel Excavation, 337 C.Y. Channel Excavation – Stream Channel Restoration, 256.7 C.Y. Erosion Matting, 9,125.9 S.Y. Subsurface Drain, 675 L.F.
02/12/2026 07:00 PM UTC
OSM 63(1861)101.1
Abandoned Mine Reclamation Project Centerville Centerville Borough, Washington County Estimated Amount: $200,000-$299,999 (Small Business Only) Term: 90 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (12” Diameter), 1,108 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tub, 38 L.F. Clearing and Grubbing, 3.15 ACRE Permanent Channel Excavation, 1,046 C.Y. Rock Lined Channel, 1,017 S.Y. Ford Crossing, 2 EACH Pipe Installation – Thirty-Inch (30”) Reinforced Concrete, 295 L.F. Dewatering Impoundment, 1 L.S. Selective Grading, 2.95 ACRE. Planting – Planting Preparation, 2.95 ACRE
02/05/2026 07:00 PM UTC
OSM 40(3026)103.1
Abandoned Mine Reclamation Project Larksville Southwest III Larksville Borough, Luzerne County Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 150 calendar days Bid Bond Required Principal items of Work and Approximate Quantities: Grading - 49,500 C.Y. Seeding - 8 Acres
02/05/2026 07:00 PM UTC
OSM 40(2165)103.5
Abandoned Mine Reclamation Project 4-6 Pine Road Exploratory Drilling Plains Township, Luzerne County Estimated Amount: $100,000-$200,000 (Small Business Only) Term: 45 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Drilling - Air Rotary 225 L.F. Drilling - Core Hole 330 L.F. Casing Pipe 225 L.F.
01/29/2026 07:00 PM UTC
OSM 03(1172)101.1
Abandoned Mine Reclamation Project Rupp Run South Manor Township, Armstrong County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 90 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (12” Diameter) - 50 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube – 20 L.F. Clearing and Grubbing, 0.1 Acre Planting – Planting Preparation, 0.2 Acre Channel Reconstruction – R-6 Riprap and Rock Energy Dissipaters, 200 L.F. Channel Reconstruction – SmartDitch, 175 L.F. Traffic Control, 1 L.S.
01/08/2026 07:00 PM UTC
OSM 65(1750)101.1
Abandoned Mine Reclamation Project Peanut Derry Township, Westmoreland County Estimated Amount: $300,000.00 - $500,000.00 Term: 90 calendar days Bid Bond Required Principle Items of Work and Approximate Quantities: Mobilization and Demobilization, 1L.S. Office Facility, 1 L.S. Access Road - Surface, 1085 S.Y. Access Road - Culvert, 40L.F. Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (18” Diameter), 1.940 L.F. Clearing and Grubbing, 11 ACRE Demolition and Disposal of Coke Ovens,1 L.S. Selective Grading, 35,710 C.Y. Waterline Replacement, 900 L.F. Planting – Permanent Seed, 7 ACRE Planting – Wildlife Seed, 3 ACRE Planting – Tree, 1 ACRE
12/18/2025 07:00 PM UTC
OSM 26,65(2553,2758)102.1
Abandoned Mine Reclamation Project Belle Vernon Region (Phase 2) Rostraver Township, Westmoreland County Washington Township, Fayette County Estimated Amount: Greater than $5,000,000 Term: 900 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Overburden Drilling and Casing, Steel or PVC, 20,558 L.F. Four-Inch (4") Air Rotary Drilling, 74,489 L.F. Furnishing and Installing Four-Inch (4") Nominal Steel or PVC Injection Casing, 86,093 L.F. Supply and Delivery, Mixing and Injection of Grout Material - Cement, 9,624 TON Supply and Delivery, Mixing and Injection of Grout Material - Fly Ash, 49,496 DRY TON Supply and Delivery, Mixing and Injection of Grout Material - Stone (AASHTO No. 8 Coarse Aggregate, 20 TON Supply and Delivery, Mixing and Injection of Grout Material - Sand (Type A), 42,152 DRY TON Injection Site Preparation and Site Restoration, 814 EACH
12/18/2025 07:00 PM UTC
OSM 11(0838)102.1
Abandoned Mine Reclamation Project Fox Run West Caroll Township, Cambria County Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 2,950 L.F. Clearing and Grubbing, 11 ACRE Grading - Grading, 66,500 C.Y. Grading – Hummocky Piles, 2 ACRE Grading – Ripping, 2 ACRE Planting – Planting Preparation, 11 ACRE Planting – Tree Seedlings, 2,720 EACH
12/18/2025 07:00 PM UTC
OOGM FS25-3 - CANCELED
THIS PROJECT HAS BEEN CANCELED. Cleaning Out and Plugging Four (4) Orphan Gas Wells Sandycreek Township, Venango County Estimated Amount: $300,000-$500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug four (4) orphan gas wells, estimated to be 500-1250 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: January 6, 2026, at 9:00 a.m. Department representatives will meet contractors at: 624 Congress Hill Road, Franklin, PA 16323. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
12/18/2025 06:38 PM UTC
21 - 30 of 214 Solicitations