Pennsylvania Department of Environmental Protection
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
400 Market Street, Harrisburg, PA 17101
(717) 787-7820
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
EC-02-10060-26
Storage Tank Removal Project
Paul's Auto Service
Baldwin Township, Allegheny County
Estimated Amount: $0 to $100,000 (Small Business Only)
Term: 90 calendar days
No Bid Bond Required
Principal Items of Work and Approximate Quantities:
Removal of 4 fiberglass underground storage tanks. (Two 8,000 gallon and two 6,000 gallon tanks.)
Four tanks are presumed to be empty (less than an inch of fluid at the last inspection). There may be a need to pump the tanks if water or product is found in them.
A closure report is required as well as closure sampling.
| 11/05/2026 07:00 PM UTC |
|
OOGM FS26-6
Cleaning Out and Plugging Twenty-Three (23) Orphan Gas Wells
Mahoning and Redbank Townships, Armstrong County
Porter and Redbank Townships, Clarion County
Estimated Amount: $1,000,000 to $5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug twenty-three (23) orphan gas wells, estimated to be 1,000-3,600 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 7, 2026, and October 8, 2026, at 9:00 a.m.
Department representatives will meet contractors at:
Gumtown Memorial Park
240 Water Street
New Bethlehem, PA 16242
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 11/12/2026 07:00 PM UTC |
|
OSM 02(1454)102.1
Abandoned Mine Reclamation Project
Beulah Road Wilkins Township (Lucia Drive)
Wilkins Township, Allegheny County
Estimated Amount: $1,000,000 to $5,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S.
Clearing and Grubbing, 1 L.S.
Trench Excavation, 2,575 C.Y.
Subsurface Drain – Eight-Inch (8”) Nominal Diameter Perforated PVC SDR-35 Pipe, 1,088 L.F.
Subsurface Drain – Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 78 L.F.
Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 3,680 C.Y.
Subsurface Drain – AASHTO No. 57 Coarse Aggregate, 173 C.Y.
Subsurface Drain – Precast Concrete Inlet, 1 EACH
Subsurface Drain – Precast Concrete Manhole, 1 EACH
Segmented Retaining Wall with Geogrid Reinforcement - Retaining Wall, 3,150 S.F.
Segmented Retaining Wall with Geogrid Reinforcement - Eight-Inch (8") Nominal Diameter Perforated PVC SDR-35 Pipe, 898 L.F.
Concrete Patio Replacement, 250 S.Y.
Site Restoration – Seeding, 1 L.S.
Site Restoration – Topsoil, 20 TON
Site Restoration – Miscellaneous, 1 L.S.
MANDATORY Pre-Bid Conference will be held on: October 28, 2026, at 2:00 PM.
A link is available on the first page of the Final Bid Information to join the Teams Meeting.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES.
Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
| 11/12/2026 07:00 PM UTC |
|
OSM 11,65(0948,4371)101.1
Abandoned Mine Reclamation Project
South Nanty Glo 2
Nanty Glo Borough and Jackson Township, Cambria County
Municipality of Murrysville, Westmoreland County
Estimated Amount: $1,000,000 to $5,000,000
Term: 720 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance with Wash Rack, 2 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter), 5,912 L.F.
Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter
Tube,351 L.F.
Clearing and Grubbing, 23.4 ACRE
Grading – Grading, 122,489 C.Y..
Grading – Ripping, 14.4 ACRE
Planting – Planting Preparation, 23.4 ACRE
Planting – Tree Seedlings, 9,790 EACH
Planting – Grass Seed, 713 LB.
Subsurface Drain, 4,520 L.F.
Chimney/Blanket Drain – AASHTO No. 8 Aggregate, 270 TON
Chimney/Blanket Drain – R-4 Rock, 104 S.Y.
Chimney/Blanket Drain – Filter Fabric, 312 S.Y.
Permanent Channel Excavation, 1,626 C.Y.
Erosion Matting, 4,642 S.Y.
Stilling Basin, 231 S.F.
Coal Refuse Disposal, 44,073 C.Y.
Coal Ash Addition – Supply and Delivery, 24,628 TON
Coal Ash Addition – Coordination, 1 L.S.
Coal Ash Addition – Placement, 24,628 TON
Access Road – Construction, 1 L.S.
Access Road – Maintenance Stone, 100 TON
Construction Surveying, Type A, 1 L.S.
| 11/12/2026 07:00 PM UTC |
|
OSM 32(3821)101.1
Abandoned Mine Lands Reclamation Project with Passive Treatment System
State Game Lands 332
Blacklick and Young Townships, Indiana County
Estimated Amount: Greater than $5,000,000
Term: 720 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
AML PRINCIPAL ITEMS:
Diversion and Care of Water, 1 L.S.
Alkaline Addition - Agricultural Limestone - Supply and Delivery, 61,200 TON
Alkaline Addition - Beneficial Ash - Supply and Delivery, 135,000 TON
Alkaline Addition - Application of Alkaline Materials, 196,200 TON
Grading - Area 1, 314,200 C.Y.
Grading - Area 2, 384,700 C.Y.
Grading - Area 3, 126,500 C.Y.
Grading - Area 4, 158,100 C.Y.
Grading - Area 5, 185,800 C.Y.
Diversion Channel and Ford Crossing Excavation, 1,616 C.Y.
Stone Aggregate, 24 TON
Rock Lining - Stream Relocation, 1,814 S.Y.
Rock Lining - Ford Crossing, 212 S.Y.
Seeding - Seed Bed Preparation, 59 ACRE
Seeding - Seed - Type 1, 2,021 LB.
Seeding - Seed - Type 2, 2,847 LB.
Seeding - Mulching, 59 ACRE
Construction Surveying, 1 L.S.
PTS PRINCIPAL ITEMS:
Wet Seal Tie-In – See Schedule of Prices Subitems
H-Flume, 1 L.S.
Agri Drain Smart Drainage Systems® - See Schedule of Prices Subitems
Terraced Iron Formation Channel - See Schedule of Prices Subitems
Holding and Settling Ponds - See Schedule of Prices Subitems
Auto Flushing Vertical Flow Ponds - See Schedule of Prices Subitems
Jennings-Type Vertical Flow Pond - See Schedule of Prices Subitems
Aerobic Wetland - See Schedule of Prices Subitems
Dewatering Basin – See Schedule of Prices Subitems
| 11/12/2026 07:00 PM UTC |
|
AMD 56(2524)104.1
Abandoned Mine Drainage Abatement Project
Oven Run Site B (AFVFP Stone Cleaning)
Shade Township, Somerset County
Estimated Amount: $300,000 to $500,000
Term: 120 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Limestone Bed Aggregate Cleaning – AASHTO No. 1 – 7830 C.Y.
Limestone Coarse Aggregate AASHTO No. 1 – 63 TON
| 11/19/2026 07:00 PM UTC |
|
OOGM 26-2
Cleaning Out and Plugging Twenty-Five (25) Orphan Gas Wells
Wetmore Township, McKean County
Estimated Amount: $1,000,000 to $5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug twenty-five (25) orphan gas wells, estimated to be 1,500 – 2,600 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 27th, 2026, at 9 A.M. & October 28th, 2026, at 10 A.M.
Department representatives will meet contractors at:
Tuesday, October 27th at 9:00 am (Day 1)
Meet at FR295A Stone Pit (See map in bid documents)
Coordinates: 41.721987, -78.818326
Wednesday, October 28th at 10:00 am (Day 2)
Meet at FR279 Stone Pit (Different time and location from day 1. See map in bid documents)
Coordinates: 41.725668, -78.784642
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OFTHE BID.
| 12/03/2026 07:00 PM UTC |
|
OSM 10,43(2910,4508)101.1
Abandoned Mine Reclamation Project
North Liberty South
Slippery Rock Township, Butler County
Liberty Township, Mercer County
Estimated Amount: $300,000 to $500,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 5,000 L.F.
Dewatering Impoundment, 1 L.S.
Clearing and Grubbing, 20 ACRE
Brush Barrier, 730 L.F.
Grading – Grading Area 1, 90,000 C.Y.
Grading – Grading Area 2, 34,000 C.Y.
Planting – Planting Preparation, 20 ACRE
Planting – Grass Seed, 1,200 LB.
Construction Surveying, Type B, 1 L.S.
| 12/03/2026 07:00 PM UTC |
|
OSM 35(2193)101.1
Abandoned Mine Reclamation Project
Rocky Glen Pond
Moosic Borough, Lackawanna County
Estimated Amount: $100,000 to $200,000 (Small Business Only)
Term: 300 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Grading – 21,200 Cubic Yards
Backfill Mine Openings – 870 Cubic Yards
Bat Gates – 40 Linear Feet (4 Gates)
Seeding – 12 Acres
| 12/03/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSM 65(1750)101.1
Abandoned Mine Reclamation Project
Peanut
Derry Township, Westmoreland County
Estimated Amount: $300,000.00 - $500,000.00
Term: 90 calendar days
Bid Bond Required
Principle Items of Work and Approximate Quantities:
Mobilization and Demobilization, 1L.S.
Office Facility, 1 L.S.
Access Road - Surface, 1085 S.Y.
Access Road - Culvert, 40L.F.
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (18”
Diameter), 1.940 L.F.
Clearing and Grubbing, 11 ACRE
Demolition and Disposal of Coke Ovens,1 L.S.
Selective Grading, 35,710 C.Y.
Waterline Replacement, 900 L.F.
Planting – Permanent Seed, 7 ACRE
Planting – Wildlife Seed, 3 ACRE
Planting – Tree, 1 ACRE
| 12/18/2025 07:00 PM UTC |
|
OSM 26,65(2553,2758)102.1
Abandoned Mine Reclamation Project
Belle Vernon Region (Phase 2)
Rostraver Township, Westmoreland County
Washington Township, Fayette County
Estimated Amount: Greater than $5,000,000
Term: 900 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Overburden Drilling and Casing, Steel or PVC, 20,558 L.F.
Four-Inch (4") Air Rotary Drilling, 74,489 L.F.
Furnishing and Installing Four-Inch (4") Nominal Steel or PVC Injection Casing, 86,093 L.F.
Supply and Delivery, Mixing and Injection of Grout Material - Cement, 9,624 TON
Supply and Delivery, Mixing and Injection of Grout Material - Fly Ash, 49,496 DRY TON
Supply and Delivery, Mixing and Injection of Grout Material - Stone (AASHTO No. 8 Coarse
Aggregate, 20 TON
Supply and Delivery, Mixing and Injection of Grout Material - Sand (Type A), 42,152 DRY
TON
Injection Site Preparation and Site Restoration, 814 EACH
| 12/18/2025 07:00 PM UTC |
|
OSM 11(0838)102.1
Abandoned Mine Reclamation Project
Fox Run
West Caroll Township, Cambria County
Estimated Amount: $200,000 to $299,999 (Small Business Only)
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction
Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32”
Diameter) – 2,950 L.F.
Clearing and Grubbing, 11 ACRE
Grading - Grading, 66,500 C.Y.
Grading – Hummocky Piles, 2 ACRE
Grading – Ripping, 2 ACRE
Planting – Planting Preparation, 11 ACRE
Planting – Tree Seedlings, 2,720 EACH
| 12/18/2025 07:00 PM UTC |
|
OOGM FS25-3 - CANCELED
THIS PROJECT HAS BEEN CANCELED.
Cleaning Out and Plugging Four (4) Orphan Gas Wells
Sandycreek Township, Venango County
Estimated Amount: $300,000-$500,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug four (4) orphan gas wells, estimated to be 500-1250 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: January 6, 2026, at 9:00 a.m.
Department representatives will meet contractors at: 624 Congress Hill Road, Franklin, PA 16323.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 12/18/2025 06:38 PM UTC |
|
OOGM D25-1
Cleaning Out and Plugging One (1) Abandoned Gas Well
Huston Township, Clearfield County
Estimated Amount: $200,000-$299,999 (Small Business Only)
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug one (1) abandoned Oriskany Gas well, approximately 7,000' deep.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: November 12, 2025, at 10:00 a.m.
Department representatives will meet contractors at:
The Annex Building Conference Room. We will travel to location from there. Annex Building Coordinates: 41.118593, -78.530091. Directions: If traveling Interstate 80, use exit 111 and turn on State Route 153 North. Drive past Moshannon State Forest District Office (there is a sign in front of the office) and take the next right hand turn then bear to the right towards SB Elliott State Park to the Annex Office. If traveling south on State Route 153 to our office, turn left at SB Elliott State Park sign then bear right towards SB Elliott State Park to the Annex Office.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 12/04/2025 07:00 PM UTC |
|
OOGM FS25-2
Cleaning Out and Plugging Twenty-Five (25) Orphan Gas Wells
Millcreek, Fairview, Girard, and Harborcreek Townships
City of Erie, Erie County
Estimated Amount: $1,000,000 to $5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug twenty-five (25) orphan oil and gas wells, estimated to be 750 to 2,500 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: November 5 and November 6 at 9:00 a.m.
Department representatives will meet contractors at: Tom Ridge Environment Center, 301 Peninsula Drive, Erie, PA 16505, 42.11016, -80.15411.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 12/04/2025 07:00 PM UTC |
|
OSM 17(7183)101.1
Abandoned Mine Reclamation Project
Goshen West
Goshen Township, Clearfield County
Estimated Amount: $500,000-$1,000,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 Each
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 4,480 L.F.
Clearing and Grubbing, 27.8 Acre
Grading - Grading, 216,478 C.Y.
Grading – Hummocky Piles, 14.3 Acre
Grading – Ripping, 13.5 Acre
Planting – Planting Preparation, 27.8 Acre
Planting – Tree Seedlings, 18.904 Each
| 11/06/2025 07:00 PM UTC |
|
OOGM 25-1
Cleaning Out and Plugging Forty-Four (44) Abandoned/Orphaned Wells Permitted Oil/Gas Wells
Highland Township, Elk County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug forty-four (44) Oil/Gas Wells, estimated to be up to 3,000 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 22nd through October 23rd, 2025, at 9:00 a.m.
Department representatives will meet contractors at:
Lamont Tool Shop
Warehouse Rd (FR 337)
41.5347, -78.9143
To access the well locations, it is advised the contractors bring an ATV/UTV to commute between wells. The ATV trail access is between 7 and 8 miles of wooded terrain not accessible by car or truck. No pickup trucks or other vehicles other than ATV’s/UTV’s are permitted on the standalone ATV trail network. The USFS will allow the use of an ATV/UTV under 70” width at the pre-bid. The ride will be at your own risk and all safety equipment should be worn while driving. Although bringing an ATV/UTV is a recommended option, all potential bidders will have the opportunity to view all wells, regardless of if they bring an ATV/UTV to the meeting.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 11/06/2025 07:00 PM UTC |
|
OSM 17(4543)101.1
Abandoned Mine Reclamation Project
Alder Run
Morris Township, Clearfield County
Estimated Amount: $300,000-$500,000
Term: 180 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH
Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (12” Diameter) - 930 L.F.
Clearing and Grubbing, 21.7 ACRE
Grading - Grading, 149,622 C.Y.
Grading - Ripping, 0.6 ACRE
Planting - Planting Preparation, 21.7 ACRE
Planting - Tree Seedlings, 408 EACH
Dewatering Impoundments, 1 L.S.
Sediment Basin and Vernal Pool Construction, 1 L.S.
| 11/06/2025 07:00 PM UTC |
|
OOGM FS25-1
Cleaning Out and Plugging Fifteen (15) Orphan Gas Wells
Lancaster, Forward, and Connoquenessing Townships, Butler County
Estimated Amount: $1,000,000-$5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug fifteen (15) orphan gas wells, estimated to be 1,100 to 3,500 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: October 15, 2025 at 9:00 a.m.
Department representatives will meet contractors at: Pavillion #6 at Moraine State Park, 40.9667, -80.1238.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 10/30/2025 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.