General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
EC-02-10060-26
Storage Tank Removal Project Paul's Auto Service Baldwin Township, Allegheny County Estimated Amount: $0 to $100,000 (Small Business Only) Term: 90 calendar days No Bid Bond Required Principal Items of Work and Approximate Quantities: Removal of 4 fiberglass underground storage tanks. (Two 8,000 gallon and two 6,000 gallon tanks.) Four tanks are presumed to be empty (less than an inch of fluid at the last inspection). There may be a need to pump the tanks if water or product is found in them. A closure report is required as well as closure sampling.
11/05/2026 07:00 PM UTC
OOGM FS26-6
Cleaning Out and Plugging Twenty-Three (23) Orphan Gas Wells Mahoning and Redbank Townships, Armstrong County Porter and Redbank Townships, Clarion County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-three (23) orphan gas wells, estimated to be 1,000-3,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 7, 2026, and October 8, 2026, at 9:00 a.m. Department representatives will meet contractors at: Gumtown Memorial Park 240 Water Street New Bethlehem, PA 16242 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
11/12/2026 07:00 PM UTC
OSM 02(1454)102.1
Abandoned Mine Reclamation Project Beulah Road Wilkins Township (Lucia Drive) Wilkins Township, Allegheny County Estimated Amount: $1,000,000 to $5,000,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Clearing and Grubbing, 1 L.S. Trench Excavation, 2,575 C.Y. Subsurface Drain – Eight-Inch (8”) Nominal Diameter Perforated PVC SDR-35 Pipe, 1,088 L.F. Subsurface Drain – Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 78 L.F. Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 3,680 C.Y. Subsurface Drain – AASHTO No. 57 Coarse Aggregate, 173 C.Y. Subsurface Drain – Precast Concrete Inlet, 1 EACH Subsurface Drain – Precast Concrete Manhole, 1 EACH Segmented Retaining Wall with Geogrid Reinforcement - Retaining Wall, 3,150 S.F. Segmented Retaining Wall with Geogrid Reinforcement - Eight-Inch (8") Nominal Diameter Perforated PVC SDR-35 Pipe, 898 L.F. Concrete Patio Replacement, 250 S.Y. Site Restoration – Seeding, 1 L.S. Site Restoration – Topsoil, 20 TON Site Restoration – Miscellaneous, 1 L.S. MANDATORY Pre-Bid Conference will be held on: October 28, 2026, at 2:00 PM. A link is available on the first page of the Final Bid Information to join the Teams Meeting. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID. READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 9%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
11/12/2026 07:00 PM UTC
OSM 11,65(0948,4371)101.1
Abandoned Mine Reclamation Project South Nanty Glo 2 Nanty Glo Borough and Jackson Township, Cambria County Municipality of Murrysville, Westmoreland County Estimated Amount: $1,000,000 to $5,000,000 Term: 720 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance with Wash Rack, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 5,912 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube,351 L.F. Clearing and Grubbing, 23.4 ACRE Grading – Grading, 122,489 C.Y.. Grading – Ripping, 14.4 ACRE Planting – Planting Preparation, 23.4 ACRE Planting – Tree Seedlings, 9,790 EACH Planting – Grass Seed, 713 LB. Subsurface Drain, 4,520 L.F. Chimney/Blanket Drain – AASHTO No. 8 Aggregate, 270 TON Chimney/Blanket Drain – R-4 Rock, 104 S.Y. Chimney/Blanket Drain – Filter Fabric, 312 S.Y. Permanent Channel Excavation, 1,626 C.Y. Erosion Matting, 4,642 S.Y. Stilling Basin, 231 S.F. Coal Refuse Disposal, 44,073 C.Y. Coal Ash Addition – Supply and Delivery, 24,628 TON Coal Ash Addition – Coordination, 1 L.S. Coal Ash Addition – Placement, 24,628 TON Access Road – Construction, 1 L.S. Access Road – Maintenance Stone, 100 TON Construction Surveying, Type A, 1 L.S.
11/12/2026 07:00 PM UTC
OSM 32(3821)101.1
Abandoned Mine Lands Reclamation Project with Passive Treatment System State Game Lands 332 Blacklick and Young Townships, Indiana County Estimated Amount: Greater than $5,000,000 Term: 720 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: AML PRINCIPAL ITEMS: Diversion and Care of Water, 1 L.S. Alkaline Addition - Agricultural Limestone - Supply and Delivery, 61,200 TON Alkaline Addition - Beneficial Ash - Supply and Delivery, 135,000 TON Alkaline Addition - Application of Alkaline Materials, 196,200 TON Grading - Area 1, 314,200 C.Y. Grading - Area 2, 384,700 C.Y. Grading - Area 3, 126,500 C.Y. Grading - Area 4, 158,100 C.Y. Grading - Area 5, 185,800 C.Y. Diversion Channel and Ford Crossing Excavation, 1,616 C.Y. Stone Aggregate, 24 TON Rock Lining - Stream Relocation, 1,814 S.Y. Rock Lining - Ford Crossing, 212 S.Y. Seeding - Seed Bed Preparation, 59 ACRE Seeding - Seed - Type 1, 2,021 LB. Seeding - Seed - Type 2, 2,847 LB. Seeding - Mulching, 59 ACRE Construction Surveying, 1 L.S. PTS PRINCIPAL ITEMS: Wet Seal Tie-In – See Schedule of Prices Subitems H-Flume, 1 L.S. Agri Drain Smart Drainage Systems® - See Schedule of Prices Subitems Terraced Iron Formation Channel - See Schedule of Prices Subitems Holding and Settling Ponds - See Schedule of Prices Subitems Auto Flushing Vertical Flow Ponds - See Schedule of Prices Subitems Jennings-Type Vertical Flow Pond - See Schedule of Prices Subitems Aerobic Wetland - See Schedule of Prices Subitems Dewatering Basin – See Schedule of Prices Subitems
11/12/2026 07:00 PM UTC
AMD 56(2524)104.1
Abandoned Mine Drainage Abatement Project Oven Run Site B (AFVFP Stone Cleaning) Shade Township, Somerset County Estimated Amount: $300,000 to $500,000 Term: 120 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Limestone Bed Aggregate Cleaning – AASHTO No. 1 – 7830 C.Y. Limestone Coarse Aggregate AASHTO No. 1 – 63 TON
11/19/2026 07:00 PM UTC
OOGM 26-2
Cleaning Out and Plugging Twenty-Five (25) Orphan Gas Wells Wetmore Township, McKean County Estimated Amount: $1,000,000 to $5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-five (25) orphan gas wells, estimated to be 1,500 – 2,600 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: October 27th, 2026, at 9 A.M. & October 28th, 2026, at 10 A.M. Department representatives will meet contractors at: Tuesday, October 27th at 9:00 am (Day 1) Meet at FR295A Stone Pit (See map in bid documents) Coordinates: 41.721987, -78.818326 Wednesday, October 28th at 10:00 am (Day 2) Meet at FR279 Stone Pit (Different time and location from day 1. See map in bid documents) Coordinates: 41.725668, -78.784642 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OFTHE BID.
12/03/2026 07:00 PM UTC
OSM 10,43(2910,4508)101.1
Abandoned Mine Reclamation Project North Liberty South Slippery Rock Township, Butler County Liberty Township, Mercer County Estimated Amount: $300,000 to $500,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 5,000 L.F. Dewatering Impoundment, 1 L.S. Clearing and Grubbing, 20 ACRE Brush Barrier, 730 L.F. Grading – Grading Area 1, 90,000 C.Y. Grading – Grading Area 2, 34,000 C.Y. Planting – Planting Preparation, 20 ACRE Planting – Grass Seed, 1,200 LB. Construction Surveying, Type B, 1 L.S.
12/03/2026 07:00 PM UTC
OSM 35(2193)101.1
Abandoned Mine Reclamation Project Rocky Glen Pond Moosic Borough, Lackawanna County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 300 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Grading – 21,200 Cubic Yards Backfill Mine Openings – 870 Cubic Yards Bat Gates – 40 Linear Feet (4 Gates) Seeding – 12 Acres
12/03/2026 07:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OSM 26(4713)102.1
Public Waterline Extension Indian Head West Waterline Saltlick and Springfield Townships, Fayette County Estimated Amount: $500,000 to $1,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Installation of Eight-Inch (8”) PVC Pipe Including Fittings, 7,600 L.F. Service Lateral Connections – Three-Quarter Inch (3/4”) Service, 24 EACH Stream Crossings, 40 L.F.
03/13/2025 06:00 PM UTC
OSM 26,65(2553,2758)101.1
Abandoned Mine Reclamation Project Belle Vernon Region (Phase 1) Rostraver Township, Westmoreland County Washington Township, Fayette County Estimated Amount: Greater Than $5,000,000 Term: 900 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Overburden Drilling and Casing, Steel or PVC, 32,278 L.F. Four-Inch (4") Air Rotary Drilling, 22,226 L.F. Furnishing and Installing Four-Inch (4") Nominal Steel or PVC Injection Casing, 44,425 L.F. Supply and Delivery, Mixing and Injection of Grout Material - Cement, 8,672 TON Supply and Delivery, Mixing and Injection of Grout Material - Fly Ash, 37,487 DRY TON Supply and Delivery, Mixing and Injection of Grout Material - Stone AASHTO No. 8 Coarse Aggregate, 20 TON Supply and Delivery, Mixing and Injection of Grout Material - Sand (Type A), 46,348 DRY TON Injection Site Preparation and Site Restoration, 844 EACH READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 5%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
03/13/2025 06:00 PM UTC
OSM 56(2515)101.1
Abandoned Mine Reclamation Project Reitz Shade Township, Somerset County Issue Date: January 17, 2025 Mandatory Pre-Bid Meeting: No Bid Opening: February 20, 2025 Estimated Amount: $500,000 to $1,000,000 Term: 240 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilization, 1 L.S. Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Socks (32” Diameter), 2,150 L.F. Planting – Planting Preparation, 17 ACRE Planting – Tree Seedlings, 9,200 EACH
02/20/2025 07:00 PM UTC
OSM 16(1055)101.1
Abandoned Mine Reclamation Project East Fryburg Washington Township, Clarion County Estimated Amount: $300,000-$500,000 Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 2,878 L.F. Clearing and Grubbing, 16 ACRE Grading - Grading, 70,000 C.Y. Grading – Hummocky Piles, 5.5 ACRE Grading – Ripping, 4.0 ACRE Planting – Tree Seedlings, 6,464 EACH
02/13/2025 07:00 PM UTC
OSM 26(3858)101.1
Abandoned Mine Reclamation Project Bowood Northwest Nicholson Township, Fayette County Estimated Amount: $500,000 to $1,000,000 Term: 365 calendar days Bid Bond Required Mandatory Pre-Bid Meeting: No Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 1,669 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube, 241 L.F. Clearing and Grubbing, 15.5 ACRE Grading - Grading, 227,664 C.Y. Grading – Hummocky Piles, 6.7 ACRE Grading – Ripping, 2.3 ACRE Planting – Tree Seedlings, 6,136 EACH
02/06/2025 07:00 PM UTC
OSM 63(4744)101.1
Abandoned Mine Reclamation Project Speers West Fallowfield Township, Washington County Estimated Amount: $300,000-$500,000 Term: 270 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 730 L.F. Clearing and Grubbing, 20 ACRE Grading, 156,590 C.Y. Planting – Tree Seedlings, 1,054 EACH Access Road – 1 EACH Gas Line Crossings – 1 L.S.
01/09/2025 07:00 PM UTC
OSM 16(0030)101.1
Abandoned Mine Reclamation Project Sarah Furnace Madison Township, Clarion County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 210 calendar days Bid Bond Required Mandatory Pre-Bid Meeting: No Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 900 L.F. Clearing and Grubbing, 2.8 ACRE Grading, 16,150 C.Y. Planting, Tree Seedlings, 480 EACH
11/07/2024 07:00 PM UTC
OSM 19(2000)104.1
Abandoned Mine Reclamation Project 314 East Park Street Demolition Conyngham Township, Columbia County Estimated Amount: $0-$100,000 (Small Business Only) Term: 30 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of E&S Controls – Filter Sock (8” Diameter), 375 L.F. Grading, 100 C.Y.
11/07/2024 07:00 PM UTC
OSM 03(3368)101.1
Abandoned Mine Reclamation Project Belnap South Brady Township Armstrong County Estimated Amount: $300,000-$500,000 Term: 270 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 3,144 L.F. Clearing and Grubbing, 18.8 ACRE Grading, 179,958 C.Y. Mushroom Compost, 1,880 C.Y.
10/31/2024 06:00 PM UTC
OSM 02(1726)102.1
Abandoned Mine Reclamation Project Graham Boulevard Municipality of Penn Hills, Allegheny County Estimated Amount: $100,000 to $200,000 (Small Business Only) Term: 120 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Clearing and Grubbing, 1 L.S. Trench Excavation, 1,173 C.Y Precast Inlet Box, 1 EACH Repaving - PA DOT 2A Stone, 1.39 C.Y. Repaving - Twenty-five-millimeter (25 mm) Superpave Base Course, 1.225 TON Repaving - Nineteen-millimeter (19 mm) Superpave Binder Course, 0.6125 TON Repaving - Nine and one-half millimeter (9.5 mm) Superpave Wearing Course, 4.36 S.Y. Traffic Control, 1 L.S. Subsurface Drain - Eight-Inch (8”) Nominal Diameter Subsurface Drain - Eight-Inch (8”) Nominal Diameter Solid PVC SDR-35 Pipe, 151 L.F. Subsurface Drain - AASHTO No. 1 Coarse Aggregate, 1,173 C.Y. Seeding – Seeding, 1 L.S. Seeding – Topsoil, 1 TON
10/17/2024 06:00 PM UTC
61 - 70 of 218 Solicitations
1 2 3 4 5 7 9 10 11 … 21 22