General Info

Business Logo

Pennsylvania Department of Environmental Protection

400 Market Street, Harrisburg, PA 17101
(717) 787-7820


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OOGM 26-1
Cleaning Out and Plugging Twenty-Four (24) Orphan Gas Wells Hamilton Township, McKean County Estimated Amount: $1,000,000-$5,000,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug twenty-four (24) orphan gas wells, estimated to be 1400-1700 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: June 23, 2026 at 10:00 a.m. Department representatives will meet contractors at: Powerhouse Historic Site on SR321 41.8516, -78.8242 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
07/23/2026 06:00 PM UTC
OSM 30(2764)101.1
Abandoned Mine Reclamation Project Stringtown North Cumberland Township, Greene County Estimated Amount: $300,000 to $500,000 Term: 90 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization and Demobilizaiton, 1 L.S. Site Preparation and Restoration, 1 L.S. Preparation and Implementation of the Erosion and Sediment Pollution Control Plan, 1 L.S. Demolition, Removal and Disposal of Mine Facilities, 1 L.S. Backfilling Mine Shafts – Rock Fill, 2,660 TON Backfilling Mine Shafts – Coarse Aggregate, 50 TON Backfilling Mine Shafts – Water Collection and Treatment, 1 L.S.
07/30/2026 06:00 PM UTC
OSM 17(4550)101.1
Abandoned Mine Reclamation Project Lower Flat Run Graham and Morris Townships, Clearfield County Estimated Amount: $200,000 to $299,999 (Small Business Only) Term: 180 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 962 L.F. Clearing and Grubbing, 7.94 ACRE Grading, 83,577 C.Y. Planting – Planting Preparation, 7.94 ACRE Planting – Grass Seed, 397 LB. Subsurface Drain, 984 L.F.
08/06/2026 06:00 PM UTC
OOGM FS25-7
Cleaning Out and Plugging Four (4) Orphan Gas Wells Keating Township, McKean County Estimated Amount: $300,000-$500,000 Term: 365 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug four (4) orphan gas wells, estimated to be 1800-2200 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: July 14, 2026, at 10:00 a.m. Department representatives will meet contractors at: Hilltop Volunteer Fire Department, 4351 PA-646, Cyclone, PA 16726 FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
08/20/2026 06:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OSM 32(3591)101.1
Abandoned Mine Reclamation Project Johnsonburg #2 Banks Twp., Indiana County Estimated Amount: $200,000-$299,000 (Small Business Only) Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 1,100 L.F. Grading – Grading, 18,700 C.Y. Subsurface Highwall Drain, 450 L.F. Planting – Tree Seedlings, 2,584 EACH
02/22/2024 07:00 PM UTC
EC-65-81369-23
Storage Tank Removal Pitzer Transport, Inc. City of Jeannette, Westmoreland County Estimated Amount: $0-$100,000 (Small Business Only) Term: 90 calendar days No Bid Bond Required Principal Items of Work and Approximate Quantities: Removal of one steel underground storage tank system. (1 10,000-gallon diesel underground storage tank) Tank is uncapped and has 25 5/8 inches of water and 3/8 inches of product at the last inspection. There is a need to pump the tanks of liquid and property dispose of liquid. A closure report is required as well as closure sampling.
02/22/2024 07:00 PM UTC
OSM 13,54(3204)101.1
Abandoned Mine Reclamation Project Honeybrook-Audenried Banks Township, Carbon County Kline Township, Schuylkill County Estimated Amount: $500,000-$1,000,000 Term: 90 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Removal and Disposal of Structures Seedings READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 18%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
11/30/2023 07:00 PM UTC
OSM 65(1199)102.1
Abandoned Mine Reclamation Project Bovard Area Wide Subsidence Hempfield Township, Westmoreland County Estimated Amount: Greater Than $5,000,000 Term: 630 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Overburden Drilling and Casing, Steel or PVC, 10,203 L.F. Four-Inch (4") Air Rotary Drilling, 33,942 L.F. Furnishing and Installing Four-Inch (4") Nominal Steel or PVC Injection Casing, 32,224 L.F. Supply and Delivery, Mixing and Injection of Grout Material - Cement, 5,045 TON Supply and Delivery, Mixing and Injection of Grout Material - Fly Ash, 29,522 DRY TON Supply and Delivery, Mixing and Injection of Grout Material - Stone (AASHTO No. 57), 20 TON Supply and Delivery, Mixing and Injection of Grout Material - Sand (Type A), 17,892 DRY TON Injection Site Preparation and Site Restoration, 497 EACH READ INSTRUCTIONS CAREFULLY TO COMPLY WITH NEW GOAL-SETTING PROCEDURES. Per Attachment A of the Bid Information, the SDB/VBE Goals for this project are: SDB - 5%, VBE - 3%. If a bidder intends to meet the SDB goal in full, they must submit SDB-2, SDB-3, and SDB-3.1. If a bidder is seeking a full good faith efforts waiver (not agreeing to meet any portion of the SDB participation goal), they must submit SDB-2 and the information requested in SDB-5 (parts 1-5). If a bidder is seeking a good faith efforts waiver from a part of the SDB participation goal, they must submit SDB-2, SDB-3, SDB-3.1, and the information requested in SDB-5 (parts 1-5). Additional requirements for submitting these documents are set forth in SDB-1, Instructions for Completing the SDB Participation Submittal and SDB Utilization Schedule. Please note that the Veteran Business Enterprise program has separate but equivalent documentation requirements.
11/30/2023 07:00 PM UTC
OSM 26(0690)101.1
Abandoned Mine Reclamation Project, Juniata West, Franklin Township, Fayette County Estimated Amount: $100,000-$200,000 (Small Business Only) Term: 270 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 2 Each Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter) – 1,800 L.F. Clearing and Grubbing, 1 L.S. Grading, 16,060 C.Y. Seeding – Seed Bed Preparation, 6.3 Acre
08/31/2023 06:00 PM UTC
OOGM 23-1 (Reissued Extension)
Cleaning Out and Plugging Thirteen (13) Abandoned Permitted/Rule Authorized Class IIR Injection Wells, Highland Township, Elk County Estimated Amount: $500,000-$1,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug thirteen (13) abandoned injection wells, estimated to be up to 2,500 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: June 29, 2023 at 9:00 a.m. Department representatives will meet contractors at: Dj’s Russell City Store, 1536 Route 66, Russell City, PA 16735. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
07/27/2023 06:00 PM UTC
OOGM 23-3
Cleaning Out and Plugging Ten (10) Abandoned Permitted/Rule Authorized IIR Injection Wells, Highland Township, Elk County Estimated Amount: $500,000-$1,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug ten (10) abandoned injection wells, estimated to be up to 2,700 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: June 29, 2023, at 9:00 a.m. Department representatives will meet contractors at: Dj’s Russell City Store, 1536 Route 66, Russell City, PA 16735. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
07/20/2023 06:00 PM UTC
OOGM 23-1
Cleaning Out and Plugging Thirteen (13) Abandoned Permitted/Rule Authorized Class IIR Injection Wells, Highland Township, Elk County Estimated Amount: $500,000-$1,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Clean out and plug thirteen (13) abandoned injection wells, estimated to be up to 2,500 feet in depth, to Department specifications. Prepare and restore well sites/site. Mobilize and demobilize plugging equipment. MANDATORY Pre-Bid Conference will be held on: June 29, 2023 at 9:00 a.m. Department representatives will meet contractors at: Dj’s Russell City Store, 1536 Route 66, Russell City, PA 16735. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
07/20/2023 12:00 PM UTC
BF63080601.1
Bond Forfeiture Land Reclamation, Green Global Machine 221 LNC Land Reclamation Project, Buffalo Township, Washington County Estimated Amount: $100,000-$200,000 (Small Business Only) Term: 180 calendar days No Bid Bond Required Principal Items of Work and Approximate Quantities: Mobilization/Demobilization of Necessary Reclamation Equipment Backfilling Highwall or Blasting Highwall (Approx. 60,000 CY) Topsoil Spreading – Approximately 15,000 CY Regrading/Revegetation – 5 Acres Remove One Pond Place Gravel Over Pond Removal Area – Approx. 25 TON Regrade/Spread Topsoil and Revegetate Approximately 5 Acres According to the Approved Reclamation Plan Repair All Erosion Gullies Remove Any Assorted Trash, Abandoned Equipment and Parts Left Behind by Green Global Machine
06/22/2023 06:00 PM UTC
EC-04-80073-23
Storage Tank Removal, Jim's Sunoco Service Inc., New Brighton Borough, Beaver County Estimated Amount: $0-$100,000 (Small Business Only) Term: 90 calendar days No Bid Bond Required Principal Items of Work and Approximate Quantities: Certified Asbestos Inspector Evaluation 1 L.S. 10 Day Notification to DEP AQ Program SWRO 1 L.S. Demolition of Building and Canopy in North Tank Field 2 L.S. Licensed Asbestos Abatement Contractor, If Necessary, For Removal 1 L.S. Excavation, Removal, and Disposal of Underground Storage Tank Systems A. Excavation 5 L.S. B. 5 Underground Storage Tanks (5 Storage Tanks 001, 002, 007, 008, 009), Cleaning, Removal and Disposal and/or Salvage of Underground Tank and Appurtenances 5 L.S. Removal and Disposal of Residual Liquids from Underground Storage Tank Systems 5 Drums Site Access and Restriction 1 L.S. Backfill 256 Tons Project Completion Report 1 L.S.
06/01/2023 06:00 PM UTC
71 - 80 of 209 Solicitations
1 2 3 4 5 6 8 10 11 12 20 21