OOGM FS25-8
Cleaning Out and Plugging Twenty-Two (22) Orphan Gas Wells
Keating Township, McKean County
Estimated Amount: $1,000,000 to $5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug twenty-two (22) orphan gas wells, estimated to be 1,200-1,600 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: August 18, 2026, at 10:00 a.m.
Department representatives will meet contractors at:
Cheez’s Garage
58 Chesebro Lane
Smethport, PA 16749
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 09/17/2026 06:00 PM UTC |
|
AMD 11(2568)102.1
Passive Treatment Rehabilitation Project
Bellwood Reservoir North
Reade Township, Cambria County
Estimated Amount: $1,000,000 to $5,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization and Demobilization. 1 L.S.
Implementation of the Erosion and Sediment Plan – Rock Construction Entrance, 1 Each
Implementation of the Erosion and Sediment Plan – Compost Filter Sock, 1 Each
Clearing and Grubbing (approximately 7.5 acres)
Grading
Limestone coarse Aggregate (approximately 7,500 tons)
Water Level Control Structures
Settling Pond Baffles
| 09/24/2026 06:00 PM UTC |
|
OOGM FS26-4
Cleaning Out and Plugging Eight (8) Orphan Gas Wells
Foster and Otto Townships, McKean County
Estimated Amount: $500,000 to $1,000,000
Term: 365 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug eight (8) orphan gas wells, estimated to be 1,200 to 1,600 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: September 15, 2026 at 10:00 a.m.
Department representatives will meet contractors at:
Otto Township VFD Station 9
118 R L Sweitzer Drive
Duke Center, PA 16729
41.939576, -78.475261
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 10/15/2026 06:00 PM UTC |
| Number | Deadline |
|---|---|
|
OOGM 23-1 (Reissued Extension)
Cleaning Out and Plugging Thirteen (13) Abandoned Permitted/Rule Authorized Class IIR Injection Wells, Highland Township, Elk County
Estimated Amount: $500,000-$1,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug thirteen (13) abandoned injection wells, estimated to be up to 2,500 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: June 29, 2023 at 9:00 a.m.
Department representatives will meet contractors at: Dj’s Russell City Store, 1536 Route 66, Russell City, PA 16735.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 07/27/2023 06:00 PM UTC |
|
OOGM 23-3
Cleaning Out and Plugging Ten (10) Abandoned Permitted/Rule Authorized IIR Injection Wells, Highland Township, Elk County
Estimated Amount: $500,000-$1,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug ten (10) abandoned injection wells,
estimated to be up to 2,700 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: June 29, 2023, at 9:00 a.m.
Department representatives will meet contractors at: Dj’s Russell City Store, 1536 Route 66, Russell City, PA 16735.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 07/20/2023 06:00 PM UTC |
|
OOGM 23-1
Cleaning Out and Plugging Thirteen (13) Abandoned Permitted/Rule Authorized Class IIR Injection Wells, Highland Township, Elk County
Estimated Amount: $500,000-$1,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug thirteen (13) abandoned injection wells, estimated to be up to 2,500 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: June 29, 2023 at 9:00 a.m.
Department representatives will meet contractors at: Dj’s Russell City Store, 1536 Route 66, Russell City, PA 16735.
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 07/20/2023 12:00 PM UTC |
|
BF63080601.1
Bond Forfeiture Land Reclamation, Green Global Machine 221 LNC Land Reclamation Project, Buffalo Township, Washington County
Estimated Amount: $100,000-$200,000 (Small Business Only)
Term: 180 calendar days
No Bid Bond Required
Principal Items of Work and Approximate Quantities:
Mobilization/Demobilization of Necessary Reclamation Equipment
Backfilling Highwall or Blasting Highwall (Approx. 60,000 CY)
Topsoil Spreading – Approximately 15,000 CY
Regrading/Revegetation – 5 Acres
Remove One Pond
Place Gravel Over Pond Removal Area – Approx. 25 TON
Regrade/Spread Topsoil and Revegetate Approximately 5 Acres According to the Approved Reclamation Plan
Repair All Erosion Gullies
Remove Any Assorted Trash, Abandoned Equipment and Parts Left Behind by Green Global Machine
| 06/22/2023 06:00 PM UTC |
|
EC-04-80073-23
Storage Tank Removal, Jim's Sunoco Service Inc., New Brighton Borough, Beaver County
Estimated Amount: $0-$100,000 (Small Business Only)
Term: 90 calendar days
No Bid Bond Required
Principal Items of Work and Approximate Quantities:
Certified Asbestos Inspector Evaluation 1 L.S.
10 Day Notification to DEP AQ Program SWRO 1 L.S.
Demolition of Building and Canopy in North Tank Field 2 L.S.
Licensed Asbestos Abatement Contractor, If Necessary, For Removal 1 L.S.
Excavation, Removal, and Disposal of Underground Storage Tank Systems
A. Excavation 5 L.S.
B. 5 Underground Storage Tanks (5 Storage Tanks 001, 002, 007, 008, 009), Cleaning, Removal and Disposal and/or Salvage of Underground Tank and Appurtenances 5 L.S.
Removal and Disposal of Residual Liquids from Underground Storage Tank Systems 5 Drums
Site Access and Restriction 1 L.S.
Backfill 256 Tons
Project Completion Report 1 L.S.
| 06/01/2023 06:00 PM UTC |
|
EC-10-91063-23
Storage Tank Removal, McCandless Tank Removal, Worth Township, Butler County
Estimated Amount: $0-$100,000 (Small Business Only)
Term: 180 calendar days
No Bid Bond Required
Principal Items of Work and Approximate Quantities:
Excavation, Removal, and Disposal of Underground Storage Tank Systems
A. Excavation 4 L.S.
B. 4 Underground Storage Tanks, Cleaning, Removal and Disposal and/or Salvage of Underground Tank and Appurtenances 4 L.S.
Removal and Disposal of Residual Liquids from Underground Storage Tank Systems 4 Drums
Site Access and Restriction 1 L.S.
Backfill 155 Tons
Underground Storage Tank System Closure Report 1 L.S.
Closure Notification Form 1 L.S.
Storage Tanks Permitting/Application Registration Form 1 L.S.
MANDATORY Pre-Bid Conference will be held on: May 3, 2023, at 10:00 a.m.
Department representatives will meet contractors at: 895 New Castle Road, Slippery Rock, PA 16057
FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 05/25/2023 06:00 PM UTC |
|
OSM 17(6868)101.1
Abandoned Mine Reclamation Project, Smoke Run East, Gulich Township and Ramey Borough, Clearfield County
Estimated Amount: $500,000 to $1,000,000
Term: 270 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter
Sock, 3,300 L.F.
Access Road – AASHTO No. 1 Coarse Aggregate, 2,600 C.Y.
Access Road – PA DOT 2A Coarse Aggregate, 1,300 C.Y.
Grading, 98,950 C.Y.
Smooth-Interior Corrugated Polyethylene Pipe – Thirty-six Inch (36”) Diameter, 220 L.F.
Walking Trail, 1,330 S.Y.
Tree Planting, 110 Each,
Subsurface Drain – Twelve-Inch (12”) Perforated Smooth-Interior Corrugated
Polyethylene Pipe, 2,010 L.F.
Subsurface Drain – AASHTO No. 1 Coarse Aggregate, 655 C.Y.
| 03/02/2023 07:00 PM UTC |
|
OOGM FS22-20
Cleaning Out and Plugging Nineteen (19) Orphan Gas Wells, Farmington and Highland Townships, Clarion County and Green and Barnett Townships, Forest County
Estimated Amount: $1,000,000-$5,000,000
Term: 360 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug Nineteen (19) orphan gas wells, estimated to be 660 to 3,300 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: February 7, 2023 at 9:00 a.m.
Department representatives will meet contractors at: Farmington Township Volunteer Fire Co. Parking Lot. 6785 Route 36, Leeper, PA
16233. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 02/23/2023 07:00 PM UTC |
|
OOGM FS22-21
Cleaning Out and Plugging Twenty-Three (23) Orphan Gas Wells, Farmington, Knox, and Washington Townships and Hawthorn Borough, Clarion County
Estimated Amount: $1,000,000 to $5,000,000
Term: 420 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug Twenty Three (23) orphan gas wells, estimated to be 660 to 3,300 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: February 1, 2023, at 9:00 a.m.
Department representatives will meet contractors at: Washington Township Volunteer Fire Hall Parking Lot, 19877 PA-208, Fryburg, PA
16326. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 02/14/2023 07:00 PM UTC |
|
OOGM FS22-22
Cleaning Out and Plugging Twenty (20) Orphan Gas Wells, Beaver, Richland, and Licking Townships, Clarion County
Estimated Amount: $1,000,000 to $5,000,000
Term: 420 calendar days
Bid Bond Required
Principal Items of Work and Approximate Quantities:
Clean out and plug Twenty (20) orphan gas wells, estimated to be 1,000 to 2,000 feet in depth, to Department specifications.
Prepare and restore well sites/site.
Mobilize and demobilize plugging equipment.
MANDATORY Pre-Bid Conference will be held on: February 2, 2023, at 9:00 a.m.
Department representatives will meet contractors at: Large Parking Lot Off Knox Exit South of I 80 East. Lat N 41 11’00” Long W-79 32’28”. FAILURE TO ATTEND THE PRE-BID MEETING WILL BE CAUSE FOR REJECTION OF THE BID.
| 02/14/2023 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.