General Info

Business Logo

Richland County Government

2020 Hampton Street Suite 3064, Columbia, SC 29204
(803) 576-2130

More information about the Richland County Transportation Program, including the upcoming tentative letting schedule, can be found at www.RichlandPenny.com

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
PDT-301-IFB-2019
The North Springs Rd / Harrington Rd Intersection Improvement Project The scope includes the widening of North Springs Rd to install dedicated left turn lanes onto Harrington Rd and Patrick Dr. Additional improvements include the extension of turning lanes along Harrington Rd. Pedestrian accommodations (sidewalk construction) are also proposed throughout the project area.
07/17/2019 06:00 PM UTC
PDT-770-IFB-2019
Resurfacing Package Q Milling, full depth patching, and/or resurfacing of approximately 15.73 miles of roadway located with Richland County: Almeda Dr Ashley Brook Ct Ashley Crest Dr Athena Dr Bombing Range Rd Bradbury Dr Brickingham Way Briercliff Dr Carriage House Rd Centeridge Dr Clover Bay Dr Cokesbury Dr Columbia Club Dr E Decker Park Rd Foxfield Ln Glen Green Dr Glenshire Dr Hillvale Ct Hillvale Dr Holly Ridge Ct Holly Ridge Ln Humble Dr Huntcliff Ct Longtown Rd W Lost Tree Dr Meadowlake Ct N Chateau Dr Norse Way Oakmist Way Old Iron Rd Olde Springs Rd Petworth Ct Petworth Dr Rockwood Rd Rosewood Dr S Brighton Rd Savannah Dr Shallow Brook Dr Shallow Pond Rd Siegfried Ln Sommerset Dr Springsdans Ln Sprott St Stafford Rd Summer Vale Ct Tea Olive Rd Viking Dr Wales Rd Watson Way Whitehurst Way Woodlands Village Ct Decker Blvd
06/26/2019 06:00 PM UTC
RC-184-B-2019
Hazardous Mitigation Grant Program Demolition & Restore to Green Space Group 6 Richland County invites General Contractors to submit bids for the Hazard Mitigation Grant Program (HMGP) for a phased residential and non-residential demolition and/or residential and non-residential land restoration services. **Site visits are the responsibility of the contractor. Failure of the contractor to acquaint himself with existing conditions shall in no way relieve him of any obligation with respect to this bid or resulting contract..** All sub-contractors being utilized for this project MUST be listed on the "Listing of Sub-contractors" form. 8 Knollwood Ct 12 Knollwood Ct 602 Knollwood Dr 610 Knollwood Dr 613 Planters Dr 625 Planters Dr
06/12/2019 07:00 PM UTC
RC-174-B-2019
Miles-Genessee Valley Intersection Improvements MANDATORY Pre-Bid on May 21, 2019 @ 2:00pm in the 4th Floor Conference Room @ 2020 Hampton Street, Columbia, SC 29204
06/06/2019 06:00 PM UTC
RC-191-B-2019
Hazardous Mitigation Grant Program Demolition & Restore to Green Space Group 5 Richland County invites General Contractors to submit bids for the Hazard Mitigation Grant Program (HMGP) for a phased residential and non-residential demolition and/or residential and non-residential land restoration services. **Site visits are the responsibility of the contractor. Failure of the contractor to acquaint himself with existing conditions shall in no way relieve him of any obligation with respect to this bid or resulting contract..** All sub-contractors being utilized for this project MUST be listed on the "Listing of Sub-contractors" form.
06/03/2019 07:00 PM UTC
PDT-772-IFB-2019
Sidewalk Package 11- Polo Rd SUP and Harrison Rd Sidewalk The Polo Road Shared-Use Path will consist of constructing 9600 SY of 10 ft wide 4” thick concrete and 200 SY of 6” concrete shared-use path 1950 lf of 2’-0” vertical and 15 lf of 2’-0” ogee curb and gutter. Additionally, 976 lf of various sizes of drainage pipe will be installed. The Harrison Road sidewalk project consist of constructing 2465 SY of 5 ft wide 4” thick concrete sidewalk. Additionally, 2330 lf of 1’-6” lf of vertical curb and gutter, 80 CY of retaining wall, 970 SY of 6’ thick concrete driveway and installing approx. 1190 lf of various size drainage pipe.
05/22/2019 06:00 PM UTC
PDT-771-IFB-2019
Dirt Road Package J The work consists of complete sitework and traffic control including, but not limited to: clearing and grubbing, demolition, unclassified excavation, borrow excavation, sub-base, earth base and aggregate base courses, hot mix asphalt, pavement markings, signage, storm drainage piping and structures, grassing and erosion control measures located within Richland County. The following roads are included in the package: Ehrlich Street Haven Circle Hall Street Summer Haven Drive Youngs Chapel Church Road Mrs Macks Road
04/10/2019 06:00 PM UTC
PDT-318-IFB-2019
The Southeast Richland Neighborhood (SERN) Improvement Project scope includes: 1) the construction of a two (2) lane roadway on new location from US Route 378/US 76 (Garners Ferry Road) to Road S-2089 (Rabbit Run Road) 2) Shared-Use Path on new roadway and Rabbit Run Road from Garners Ferry Road to Road S-37 (Lower Richland Boulevard) 3) Shared-Use Path on Lower Richland Boulevard from Rabbit Run Road to Lower Richland High School 4) Installation of Aluminum Box Culverts under Rabbit Run Road to correct existing drainage issue.
02/20/2019 07:00 PM UTC
PDT-747-IFB-2019
Dirt Road Paving Package I: The work consists of complete sitework and traffic control including, but not limited to: clearing and grubbing, demolition, unclassified excavation, borrow excavation, sub-base, earth base and aggregate base courses, hot mix asphalt, pavement markings, signage, storm drainage piping and structures, grassing and erosion control measures located within Richland County: Amick Drive Julian Addy Circle Cadia Drive Meadow Lane Manus Road Howard Coogler Road SE Sedgewood Road
01/30/2019 07:00 PM UTC
325-READVERTISED Broad River Neighborhood Improvements
325-READVERTISED Broad River Neighborhood Improvements BROAD RIVER NEIGHBORHOOD IMPROVEMENT PROJECT The project includes approximately .674 miles of new sidewalk and associated handicap ramps along Gibson St., Hart St., Pearl St. and McRae St. within the Broad River Neighborhood. In addition to sidewalks, the project includes landscaping, irrigation, stormwater drainage systems, curb and gutter installation, striping, traffic control, grading, concrete driveways, sodding and erosion control.
01/23/2019 07:00 PM UTC
31 - 40 of 53 Solicitations
1 2 4 6