General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Power Plant Boiler #3 Water Trough Replacement
The project consists of but is not limited to: Replace water trough and seal plate in Boiler #3 at the Power Plant.
06/18/2026 07:00 PM UTC
Site Lighting LED Conversion Phase 2
The project consists of but is not limited to: Replacing existing high pressure sodium site lighting fixtures with new LED type lighting fixtures, replacing existing wiring with new, and adding a new walkway lighting fixture and pole.
06/04/2026 07:00 PM UTC
McCollum Science Hall East Roof Replacement
The project consists of but is not limited to: Remove existing rock ballast and EPDM membrane, remove existing insulation and applicable metal copings and flashing. Adhere new insultation, adhere new coverboard, install new KEE membrane and metal copings and flashing. Remove existing wooden walkway and patch back as required. See plans and specifications for other miscellaneous items.
05/28/2026 07:00 PM UTC
Institutional Roads 2026
The project consists of but is not limited to: Replacement of water main along Ohio Street with new 8” DIP water main.
05/28/2026 07:00 PM UTC
Maucker Union Rooms 006, 012, 014, and Concourse Lighting
The project consists of but is not limited to: the demolition of existing light fixtures, replacing and adding new light fixtures, as well as adding new ceiling tiles at Maucker Union in Rooms 006, 012, 014 and surrounding Concourses, along with the accessory spaces. See plans and specs for a complete list of all rooms involved in the project.
04/23/2026 07:00 PM UTC
Curris Business Building Roof Replacement
The project consists of but is not limited to: As indicated on the project drawings; remove existing EPDM membrane, remove existing insulation (if applicable), mechanically attach new insulation at metal deck areas or adhere new insulation at concrete deck areas, adhere new coverboard and install new adhered Fleecebacked KEE membrane. Additional work to include the removal of the three metal roof structures.
04/02/2026 07:00 PM UTC
Bender Hall Sanitary Sewer Stack Replacement
The project consists of but is not limited to: Replace cast-iron sanitary waste stack and horizontal runouts serving toilets, urinals, and floor drains for twelve story Bender Residence Hall. New piping shall be case iron pipe. Existing sanitary vent stack and portions of horizontal branches shall remain.
03/31/2026 07:00 PM UTC
Strayer-Wood Theatre Roof Replacement and Exterior Repairs
The project consists of but is not limited to: The replacement of Roof Areas #1, 2, and 3. As indicated on the project drawings; remove existing EPDM membrane, remove existing insulation (if applicable), mechanically attach new insulation at metal deck areas or adhere new insulation at concrete deck areas, adhere new coverboard and install new adhered Fleecebacked KEE membrane. Additional work to include the installation of new thru-wall flashings at Roof Area #3, the replacement of sealant joints at the upper tower and modifications to the exterior ladder to Roof Area #1.
03/12/2026 07:00 PM UTC
Industrial Technology Center Modernization-South Campus Street Improvements
The project consists of but is not limited to: roadway improvements on Campus Street from Jennings Drive to approximately 200’ south of University Avenue. The roadway improvements associated with the project generally include removal of the existing roadway pavement, excavation to place and compact a new granular base and reconstruct the PCC pavement, reconstruction of adjacent sidewalk ADA ramps, parking lot entrances and driveways, and replacement of impacted storm sewer infrastructure. The project will also involve construction of a temporary access for campus parking, replacement and reinstallation of street signs, painted pavement markings on the new pavement surface, and adjustment of fixtures within the grading and paving limits.
03/10/2026 07:00 PM UTC
Jennings Court Interior Improvements Phase 3
The project consists of but is not limited to: Replacement of interior finishes within several apartment units in the Jennings Court Complex. The replacement includes new flooring, paint, lighting, doors, hardware, casework, plumbing, and other miscellaneous items.
02/26/2026 08:00 PM UTC
1 - 10 of 168 Solicitations
← Previous 1 3 4 5 6 7 8 9 16 17