General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Human Performance Complex Envelope Repairs and Tunnel Roof Replacement
The project consists of but is not limited to: Replace the existing tunnel roof on the east side of the Human Performance Complex that connects the Wellness Recreation Center and the UNI-Dome. Project scope also includes the replacement of the building expansion joint, aluminum storefront entrances, window flashings, gutter and downspouts, and sidewalk, as well as miscellaneous associated interior work. At the west facade of the HPC, window flashings and air barrier membrane will be replaced to repair water infiltration issues.
02/19/2026 08:00 PM UTC
Curris Business Building Dry Cooler Replacement
The project consists of but is not limited to: replacing the existing dry cooler system on the roof to include the dry cooler, pump package, expansion tank, and piping. A new dry cooler, pump package, expansion tank, valves, and piping will be installed. New insulation with jacketing will be included. Electrical work includes demolition of existing power distribution to old equipment and installing new power to equipment. Dry cooler control wiring removal and replacement shall be included.
01/13/2026 08:00 PM UTC
Gilchrist Hall Dry Cooler Replacement
The project consists of but is not limited to: replacing the existing dry cooler system on the roof to include the dry cooler, pump package, expansion tank, and piping. Add steel framing to existing curb. A new dry cooler, pump package, expansion tank, valves, and piping will be installed. New insulation with jacketing will be included. Electrical work includes demolition of existing power distribution to old equipment and installing new power to equipment. Dry cooler control wiring removal and replacement shall be included.
01/13/2026 08:00 PM UTC
Trailside Apartments Envelope Improvements
General Contractor’s Scope of Work includes replacement of exterior building siding, windows, and patio doors at ten apartment buildings. Also included is the replacement of the central corridor exterior doors with glass sidelights. New steel doors with hollow metal frame glass sidelights to include access control door hardware.
12/18/2025 08:00 PM UTC
Power Plant Main Power Transformer Installation
Install a new main transformer at the Power Plant.
12/18/2025 08:00 PM UTC
Bartlett Hall Envelope Repairs
The project consists of but is not limited to selective brick removal and replacement to facilitate removal and replacement of degraded lintels. New lintel installation includes steel angle lintel, through wall stainless steel flashing, weeps and installation of new thru wall weeps. New lintels to be field painted along with select existing lintels to remain. Additional work includes selective repointing of brick masonry, removal and replacement of sealant joints at portions of the water table, concrete stoop cap repairs, sealing perimeter of concrete walks to walls and replacement of one concrete stoop.
12/18/2025 08:00 PM UTC
UNI Bookstore Infill North Floor Opening
The project consists of but is not limited to: Infill the existing floor opening on the First Floor, at the northeast corner of the building. Scope of project includes structural steel, steel decking, concrete, gypsum board ceiling, and painting.
12/11/2025 08:00 PM UTC
McLeod Center Rooms 220, 221, 223, 227, and 230 Office Renovation
Renovate existing rooms 220, 221, 223, 227, and 230 on the 2nd floor of McLeod to be office space for athletics. This involves bisecting the space into offices and meeting space and includes adding HVAC to the spaces.
12/09/2025 08:00 PM UTC
Steam Distribution System Tunnel T-2 Piping Repairs
Miscellaneous steam distribution system piping repairs in utility Tunnel T-2. Repairs include removal, replacement, installation, and relocation of expansion joints and isolation valves, installation and modifications to pipe anchors, guides, and support structures. Remove and replace pipe insulation and jacketing as required. This project also includes the repair and replacement of one (1) existing pipe anchor located approximately at Station 3+25 in Tunnel T-2F.
12/04/2025 08:00 PM UTC
Dancer Hall Exterior Envelope Repairs
The project consists of but is not limited to: roof replacement, tuckpointing, and caulking of the exterior envelope.
12/02/2025 08:00 PM UTC
11 - 20 of 168 Solicitations
2 4 5 6 7 8 9 16 17