General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Power Plant Turbine Surface Condenser Tube Replacement
Replace tubes in the steam turbine surface condenser at the Power Plant.
11/20/2025 08:00 PM UTC
Facilities Management Generator Replacement
Project consists of the removal of an existing interior 20kw natural gas generator, automatic transfer switch, natural gas piping, cooling water piping, and exhaust piping; and installation of a new 40kw exterior natural gas generator, automatic transfer switch, generator docking station, natural gas piping, concrete generator pad, protective bollards and minor roof patching
11/06/2025 08:00 PM UTC
Campbell Hall Demolition
The project consists of but is not limited to the complete deconstruction, demolition, and removal of the Campbell Hall facility from the UNI campus. Multiple site utilities will be affected, including sanitary and storm sewers. Utilities will be restored to support site drainage and adjacent campus facilities. Site will be cleaned of all building materials, cleared, finish graded, and sodded for possible future building site.
11/04/2025 08:00 PM UTC
McCollum Science Hall Renovation Rooms 173 and 176
The project consists of minor renovations of two existing laboratories. The work includes the removal of existing laboratory workstations and laboratory casework. Minor ceiling and bulkhead demolition along with the removal of existing floor coatings. New work includes installation of new laboratory casework and professor workstations. Modifications to existing laboratory casework, ceiling patching, and floor finishing. Plumbing and electrical work includes minor demolition of existing plumbing system at the demolished workstations and the installation of new floor drains and boxes as shown on the contract documents.
09/25/2025 07:00 PM UTC
Maucker Union Rooms 011 and 027 Renovation
Selective demolition and reconfiguration of two areas in Maucker Union. The first area (011) involves selective demolition of partitions, ceilings, finishes, casework and related mechanical and electrical systems. New work includes installation of painted drywall walls (steel stud), new doors, ACT ceiling, carpet tile, and extension and revision of mechanical, electrical, data and fire protection systems to support the new offices. The Student Services counter will be relocated to the circulation area and will include new drywall partitions, casework, solid surface countertops and electrical and data to support function of the space. Power and data for a furniture-based desk system will be via floor box cut into existing concrete waffle slab floor. The second area (027) involves select demolition of built-in casework, acoustic tile ceilings, carpet tile flooring and mechanical, electrical and data systems. New work includes installation of full height drywall and steel stud partitions to create three new areas (Panther Pantry, Student Government, and Storage). Panther Pantry area will receive LVP flooring, Student Government will receive carpet tile, and storage area will have adhesives from existing tile removed to leave sealed concrete flooring. Panther Pantry and Student Government areas to receive new ACT ceilings. Mechanical, electrical, fire protection and data systems to be revised to accommodate new space functions. Minor plumbing work includes capping abandoned washing machine drain and the addition of a bottle filler to existing water cooler.
09/23/2025 07:00 PM UTC
Rod Library Exterior Envelope Repairs
This project will complete several exterior envelope repairs to the Rod Library. Work to done includes patching and repair of the existing roof membrane, replacement of insulated glass units at the south pavilion, wet sealing at the exterior curtainwall glazing, replacing sealant at exterior curtainwalls, cleaning building exterior, repairing brick and mortar at selected locations and repainting selected exposed structural steel.
06/12/2025 07:00 PM UTC
Rod Library Academic Advising Office Renovation
Renovation of a suite of office and student spaces in the Rod Library. This shall include reception space, office spaces, and student collaboration spaces.
06/05/2025 07:00 PM UTC
Power Plant Boiler #3 Baghouse Repairs Phase 1
This project will replace a section of breeching from the outlet of the Boiler #3 Baghouse to the vertical breeching section above Boiler #3 ID Fan. The section of ductwork includes replacement of a flex joint and access catwalk in addition to the breeching.
05/29/2025 07:00 PM UTC
Wright Hall Gutter Repairs
This project will include demolition and disposal of existing membrane gutter lining and accessories, repair/replacement of any degraded underlayment and blocking and installation of new membrane gutter liner, terminations and sheet metal drip edge. Additional work includes selective replacement of damaged clay roof tiles, hip cap grouting, and cleaning of brick masonry.
05/29/2025 07:00 PM UTC
Commons Window Replacement Phase 1
Remove and dispose of select exterior windows. Install new windows and repair/restore interior finishes and exterior masonry as required. Interior finishes include stone and wood sills, drywall, plaster and tile jambs. Exterior masonry includes brick and limestone masonry.
05/06/2025 07:00 PM UTC
21 - 30 of 168 Solicitations
1 3 5 6 7 8 9 16 17