General Info

Business Logo

University of Northern Iowa

1801 W 31st Street, Cedar Falls, IA 50614-0530
(319) 273-6961


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
UNI Rider Hall NE Entrance Canopy
This project located on the NE side of Rider Hall will provide a much needed new entrance canopy for this location. The existing canopy has been removed. The new canopy will have new exposed structural steel, an EPDM roof membrane and cable tie backs to the existing wall. Existing brick masonry will be patched back to match the existing construction.
03/28/2023 07:00 PM UTC
Hagemann Hall and Hagemann and Rider Skywalk Roof Replacement
Remove existing rock ballast and EPDM membrane, remove existing insulation (except for Roof Area 4), adhere/mechanically attach new insulation, adhere new coverboard and install new adhered Fleecebacked KEE membrane.
02/23/2023 08:00 PM UTC
UNI-Dome Fabric Roof Replacement
Replacement of the existing fabric roof with a new PTFE fiberglass membrane while keeping the existing cable and other existing fabric support structure. In addition to the roof replacement, a new fall protection system is to be installed to provide access to all roof levels. The existing waterproofing at entrance canopies, lower & upper gutter, ring beam and cupola is to be replaced or repaired with new waterproofing.
01/31/2023 08:00 PM UTC
Rider Hall Riser Valve Replacement
Installation of heating water riser isolation and drain valves and associated piping insulation and alternate for installing balancing valves at student room convectors.
12/13/2022 08:00 PM UTC
Rider Hall Heating Pumps and Valves Replacement Phase 1
Replacement of the pumps and existing valves in Rider Hall heating system including additional valves so that sections of the heating system can be shut down rather than the entire system when it needs to be worked on.
12/13/2022 08:00 PM UTC
Jennings Courts Fiber Optic Installation
This project will install buried conduits from the existing fiber in-ground box to the Jennings Courts apartments for the installation of fiber optic cables to support UNI data for WiFi. 120V power will also be provided for the IT swtiches.
11/17/2022 08:00 PM UTC
Warehouse 1 Storm Sewer Improvements
Upgrade Warehouse 1 Storm Sewer System
09/27/2022 07:00 PM UTC
Campanile Carillon Renovation
Complete renovation of the existing carillon instrument within the Campanile. Design and construction for this scope of work will be provided by the University of Northern Iowa via a contract with the Verdin Company. Ancillary “non-bell” project scope includes: installation of a new stair from the clock floor up to the playing room floor, new belfry access hatch, acoustical upgrades at the playing room, structural modifications to the playing room floor, upgrade of power requirements, upgrade of lighting requirements, adding controls for heating and ventilation and IT rough in for a future camera feed.
06/30/2022 07:00 PM UTC
Gallagher Bluedorn Performing Arts Center Great Hall Orchestra Level Seating Replacement
Stripping and waxing of existing concrete floor, cut in new trenches for cable management, and replacement and leveling of existing orchestra pit stage floor. The removal and replacement of fixed seating shall be by the owner under separate contract. The bidding contractor is to coordinate with the owner's representative.
06/30/2022 07:00 PM UTC
Area VI South Pedestrian Bridge Replacement
Replace pedestrian bridge that spans Dry Run Creek and connects the University South Campus to the Jennings Court and Roth Housing Complex area.
06/23/2022 07:00 PM UTC
81 - 90 of 168 Solicitations
1 2 5 6 7 9 11 12 13 16 17