General Info

Business Logo

City of Sidney

Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142

The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Q26-21 Humphrey Park Basketball Court Lighting & Electrical Service Improvements
Q26-21 Humphrey Park Basketball Court Lighting & Electrical Service Improvements The City of Sidney is seeking bids from qualified electrical contractors to furnish all labor, materials, equipment, engineering, permits, inspections, coordination, and incidental items necessary to remove the existing basketball court lighting system and construct a complete new lighting and electrical service installation at Humphrey Park, 600 Buckeye Avenue, Sidney, Ohio. The Contractor shall provide a separate alternate bid price to furnish all labor and materials for the installation of one (1) 100-watt LED cobra head style night light on one of the newly installed basketball poles. The project shall be completed on a turnkey basis and shall result in a fully operational lighting system ready for use by the City. A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting Jim Heuing, Parks Dept. Facilities Maintenance Supervisor at 937-498-8155. The project will require the use of State of Ohio prevailing wage rates for Building Construction ONLY if the bid exceeds the threshold amount of $75,000. Estimate of Probable Cost: $41,000
07/23/2026 03:30 PM UTC
26-20 Sidney Airport New Equipment Hanger
26-20 Sidney Airport New Equipment Hanger The project is for an approximately 3,900 s.f. one-story, metal building of type IIB construction, group S-1 occupancy. The project involves all site work including asphalt driveways, concrete walks, and lawn seeding; building materials which include but are not limited to concrete foundations and slab, pre-manufactured metal building, hydraulic door, overhead doors, hollow metal doors in hollow metal frames; HVAC units and system; and electrical fixtures and system. A Non-Mandatory Pre-Bid Meeting will be held onsite at the Sidney City Airport, 14833 Sidney-Plattsville Road, Sidney, Ohio at 9:30 a.m. on Tuesday, July 21, 2026. A walk-through of the site will be offered during the pre-bid meeting. State of Ohio Prevailing Wage Rates apply. Estimate: $502,000
07/30/2026 03:30 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
26-07 Raw Water Pump #6 Replacement
26-07 WWTP Raw Water Pump #6 Replacement The project consists of the replacement of existing raw water pump #6 with a new water pump per specifications contained within the online Bidding Documents. A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Friday, February 27, 2026. The project requires the use of State of Ohio prevailing wage rates. Estimate of Probable Cost: $79,000
03/05/2026 05:30 PM UTC
26-08 Stewart Subdivision Water & Sewer Replacement PH II
26-08 Stewart Subdivision Water & Sewer Replacement PH II The project consists of the reconstruction of Cheryl Avenue, Robert Place, and Glenn Place cul-de-sacs including replacement of storm sewer, sanitary sewer, waterline, sidewalk, and curb & gutter as needed. State of Ohio Prevailing Wage Rates apply. Estimate: $1,380,636
03/05/2026 04:30 PM UTC
26-02 SIDEWALK PROGRAM
26-02 2026 Sidewalk Program The project will consist of the removal and replacement of 4" and 6" concrete sidewalk and drive approaches, replacement of curb, and seeding & mulching. State of Ohio Prevailing Wage Rates apply. Construction Estimate: $370,870
02/26/2026 07:30 PM UTC
26-05 WWTP BIOSOLIDS DISPOSAL
26-05 WWTP Biosolids Disposal Description of Job: The project will include removal and disposal of 500-700 dry tons of Wastewater Treatment Plant biosolids per each year of the Contract. Budget Amount per year $51,000
02/26/2026 04:30 PM UTC
26-04 Lime Sludge Service Lagoon Cleaning
26-04 Lime Sludge Service Lagoon Cleaning BIDDERS ARE REQUIRED TO VISIT THE SITE PRIOR TO SUBMITTAL OF A BID FOR ACCEPTANCE OF BID. Site visit can be scheduled by contacting Seth Epley, WTP Superintendent at 937-498-8180 or SEpley@SidneyOH.com. Description of Job: The project will include removal and disposal of lime softened sludge from the Water Treatment Plant storage lagoon to an approved agricultural site for land application. The estimated dry ton amounts will be based on the City’s yearly budgeted amount. Budget Amount per year $214,500
02/26/2026 03:30 PM UTC
25-24 PICKLEBALL COURTS
25-24 Pickleball Courts ODNR SHEL-029 2025-0128 The project consists of the construction of two (2) additional pickleball courts at Custenborder Field including site work, seeding & mulching, installation of chainlink fence, net posts & netting, and pickleball court surfacing per plan specifications. State of Ohio Department of Natural Resources NatureWorks Local Assistance Grant Funds and Capital Improvement Projects funding are being used to assist construction and relevant State requirements will apply. Domestic steel use requirements as specified in Ohio Revised Code §153.011 apply to this project. Copies of §153.011 can be obtained from any of the offices of the Department of Administrative Services or through http://codes.ohio.gov/orc/153.011. All contractors and subcontractors involved with the project will, to the extent practicable use Ohio products, materials, services and labor in the implementation of their project. Additionally, contractor compliance with Equal Employment Opportunity requirements is required. The Contractor shall be required to pay not less than the minimum wage rates established by the Department of Industrial Relations of the State of Ohio. Engineer's Estimate: $125,501
12/04/2025 04:30 PM UTC
25-23 2025 Tree Purchasing & Planting
The project consists of purchasing & planting trees at various public locations within the City of Sidney including all labor, supervision, materials, tools, equipment, machinery, and any/all other necessary and proper items. BIDDER MUST BE A MEMBER OF THE OHIO GREEN INDUSTRY ASSOCIATION (OGIA); FKA OHIO NURSERY AND LANDSCAPE ASSOCIATION (ONLA). Additional education and experience shall be noted upon Bid submission. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price. A Disadvantaged Business Enterprise (DBE) participation goal HAS NOT been established for this project; however, DBEs are encouraged to review the project and consider submitting a bid. Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only. Estimated Cost: $61,560
10/16/2025 03:30 PM UTC
25-22 Arrowhead Drive Water Main Replacement OPWC #CM08AC
25-22 Arrowhead Drive Water Main Replacement OPWC #CM08AC The project consists of the replacement of the existing 6" and 8" cast iron water main with 8" and 12" C909 DR18 CL 150 PVC water main, bends and fittings; removal and replacement of pavement, curb and gutter, 8" and 12" valves, 3/4" tap for chlorination and testing, 41 water service branches, 8 fire hydrant assemblies, and storm sewer repairs. Note that project is not to begin until March 2, 2026. State of Ohio Prevailing Wage Rates for Heavy Highway Construction apply. Engineer's Estimate: $833,227
10/02/2025 03:30 PM UTC
25-21 WTP Inline Process Monitoring Equipment Replacement
25-21 WTP Inline Process Monitoring Equipment Replacement This project involves the replacement, installation and start-up of multiple inline process monitoring instruments, associated controllers, and supporting components. The selected vendor will be responsible for procurement, start-up and initial calibration, operator training, and warranty service support for all listed equipment. The selected vendor will not be required to pay State of Ohio prevailing wage rates. A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WTP Superintendent, Seth Epley at 937.498.8180 or sepley@SidneyOH.com prior to Friday, September 19, 2025 at 1:00 pm. Estimate: $85,000
09/25/2025 05:00 PM UTC
25-20 WWTP PLC Updates
25-20 WWTP PLC Updates The project consists of updating two (2) PLCs. The first PLC is located in the Raw Pump Station, is an Allen Bradley SLC 504 with HMI. The second is an Allen Bradley SLC 500 and located in the Blower Building. The successful bidder will be responsible for purchasing two Allen-Bradley Compact Logix PLCs (or equal) that are compatible with the existing Compact Logix PLCs currently active at the Wastewater Treatment Plant (WWTP). The bidder will also be responsible for removing existing PLCs and installing the new PLCs in the existing control cabinets and transferring the existing ladder logic programming to the new units. This project also includes system startup, verification of all monitoring and control functions, and troubleshooting any programming issues to ensure proper operation of the WWTP Facility. A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Wednesday, August 27, 2025 The project will require the use of State of Ohio prevailing wage rates for Building Construction if the bid exceeds the threshold amount of $75,000. Estimate of Probable Cost: $60,000
09/11/2025 03:30 PM UTC
11 - 20 of 115 Solicitations
2 4 5 6 7 8 9 10 11 12