General Info

Business Logo

City of Sidney

Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142

The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Q26-21 Humphrey Park Basketball Court Lighting & Electrical Service Improvements
Q26-21 Humphrey Park Basketball Court Lighting & Electrical Service Improvements The City of Sidney is seeking bids from qualified electrical contractors to furnish all labor, materials, equipment, engineering, permits, inspections, coordination, and incidental items necessary to remove the existing basketball court lighting system and construct a complete new lighting and electrical service installation at Humphrey Park, 600 Buckeye Avenue, Sidney, Ohio. The Contractor shall provide a separate alternate bid price to furnish all labor and materials for the installation of one (1) 100-watt LED cobra head style night light on one of the newly installed basketball poles. The project shall be completed on a turnkey basis and shall result in a fully operational lighting system ready for use by the City. A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting Jim Heuing, Parks Dept. Facilities Maintenance Supervisor at 937-498-8155. The project will require the use of State of Ohio prevailing wage rates for Building Construction ONLY if the bid exceeds the threshold amount of $75,000. Estimate of Probable Cost: $41,000
07/23/2026 03:30 PM UTC
26-20 Sidney Airport New Equipment Hanger
26-20 Sidney Airport New Equipment Hanger The project is for an approximately 3,900 s.f. one-story, metal building of type IIB construction, group S-1 occupancy. The project involves all site work including asphalt driveways, concrete walks, and lawn seeding; building materials which include but are not limited to concrete foundations and slab, pre-manufactured metal building, hydraulic door, overhead doors, hollow metal doors in hollow metal frames; HVAC units and system; and electrical fixtures and system. A Non-Mandatory Pre-Bid Meeting will be held onsite at the Sidney City Airport, 14833 Sidney-Plattsville Road, Sidney, Ohio at 9:30 a.m. on Tuesday, July 21, 2026. A walk-through of the site will be offered during the pre-bid meeting. State of Ohio Prevailing Wage Rates apply. Estimate: $502,000
07/30/2026 03:30 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
25-19 Aeration Basin Gates
25-19 Aeration Basin Gates The project consists of installation of nine (9) gates on three (3) basins (3 gates/tank) including supplying anchors, grout, etc. The gates have been purchased by the City and are on-site for the installation. The basins will be completed individually to maintain plant operations. A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Friday, August 22, 2025 The project will require the use of State of Ohio prevailing wage rates for Building Construction if the bid exceeds the threshold amount of $75,000. Estimate of Probable Cost: $62,000
08/28/2025 03:30 PM UTC
25-12 SHE-Morrison Bridge Renovation
25-12 SHE-Morrison Bridge Renovation PID 117518 DBE GOAL 5%: The project consists of renovating the Pratt truss and pin-connected bowstring bridge and relocating it from its current location to Sidney’s Tawawa Park. Construction Estimate is $902.982.60 The project requires the payment of Federal Davis Bacon prevailing wage rates.
06/05/2025 03:30 PM UTC
25-18 WWTP Raw Water Pump #5 Replacement
25-18 WWTP Raw Water Pump #5 Replacement The project consists of the replacement of existing raw water pump #5 with a new water pump per specifications contained within the online Bidding Documents. A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Friday, May 16, 2025 The project requires the use of State of Ohio prevailing wage rates. Estimate of Probable Cost: $72,000
05/22/2025 03:30 PM UTC
25-17 Big Four Storm Outlet
25-17 Big Four Storm Outlet The project consists of the replacement of 18” storm sewer on N. Main Avenue near the Big Four Bridge. State of Ohio Prevailing Wage Rates apply. Estimate: $42,400
05/15/2025 03:30 PM UTC
25-11 Tilberry Run Drainage Ditch Improvements
25-11 Tilberry Run Drainage Ditch Improvements The project consists of the regrading of ditch bank, the addition of gabion walls and erosion control measures. State of Ohio Prevailing Wage Rates apply. Estimate: $267,339
05/01/2025 06:30 PM UTC
25-16 Russell Road / St. Marys Avenue Radar & Installation
25-16 Russell Road / St. Marys Avenue Radar & Installation The project involves the installation of advanced and stop line radar detection and abandonment of existing loop detectors at the intersection of Russell Road and St. Marys Avenue. State of Ohio Prevailing Wage Rates for Heavy Highway apply. Estimate: $85,000
04/17/2025 03:30 PM UTC
25-07 Hoge Barrett Wellfield Improvements New Water Supply Well Construction
25-07 Hoge Barrett Wellfield Improvements New Water Supply Well Construction The project involves the abandonment of three existing wells (pump bases, motors, column pipe/drop pipe, related components), the modification of three existing 16” well casings to install two new submersible pumps and pitless adapters and one new vertical turbine pump, new 8” and 10” ductile iron piping, associated electrical and instrumentation improvements, new elevated steel service platforms, drain back vaults, and air release valve vault, grading, and restoration. State of Ohio Prevailing Wage Rates apply. Estimate: $1,340,000
03/27/2025 06:30 PM UTC
25-14 Graceland Cemetery Chip & Seal Program 2025
25-14 Graceland Cemetery Chip & Seal Program 2025 The project consists of chip sealing the drives and parking lots at Graceland Cemetery. State of Ohio Prevailing Wage Rates apply. Estimate: $93,918.50
03/06/2025 04:30 PM UTC
25-15 WTP Raw Water Pump Replacements
25-15 WTP Raw Water Pump Replacements The project consists of the replacement of two (2) existing raw water pumps with new water pump per specifications contained within the online Bidding Documents. A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WTP Superintendent, Seth Epley at 937.498.8180 or sepley@SidneyOH.com prior to Wednesday, February 19, 2025 at 1:00 pm. State of Ohio Prevailing Wage Rates for Building Construction apply. Estimate: $150,000
02/27/2025 08:30 PM UTC
25-10 Aldrin Drive Water Main Replacement
25-10 Aldrin Drive Water Main Replacement The project consists of the replacement of water main along Aldrin Drive between Lunar Street and Apollo Street. State of Ohio Prevailing Wage Rates apply. Estimate: $237,459
02/27/2025 04:30 PM UTC
21 - 30 of 115 Solicitations
1 3 5 6 7 8 9 10 11 12