General Info

Business Logo

San Joaquin County Department of Public Works

1810 E Hazelton Ave, Stockton, CA 95205-6232
(209) 468-3000

The overall mission of the San Joaquin County Department of Public Works is to plan, design, construct, operate and maintain the County infrastructure, which includes public roads, transportation systems, bridges, water, wastewater, channel maintenance and solid waste disposal systems of the County, in order to best serve the interests of the people. These systems are maintained to protect the health and welfare of the public and the County’s financial investments. Public Works also provides vehicle support for the County, including procurement support, heavy and light vehicle maintenance and repair, and daily rental services.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Liberty Road and Sowles Road Resurfacing
The work is located north of the City of Lodi. The work, in general, consists of repairing and resurfacing approximately 4.2 miles of roadway with asphalt concrete and replacing and adjusting existing guardrails to meet current height standards. Base Estimate Range between $1,580,000 and $1,930,000
07/09/2026 08:31 PM UTC
SJCDPW-RFP-26-07
The San Joaquin County Department of Public Works (SJCDPW) requests technical proposals from qualified consulting firms to undertake, perform, and complete the tasks set forth in Request for Proposals – SJCDPW-RFP-26-07. The selected consulting firm (CONSULTANT) will perform professional and technical engineering services for the Washing Area Complete Streets Project (PROJECT). CONSULTANT will design and engineer the Washington area neighborhood roadway into a "complete streets" corridor, The PROJECT will include the construction of new sidewalks and buffered bike lanes, as well as enhanced intersections throughout the project area. Improvements will be constructed along Washington Street, Del Mar Avenue, Horner Avenue, and Walker Lane. Washington Street Improvements (Anteros Avenue to Walker Lane) • New curb, gutter and sidewalk on the north and south sides of the street. • Reconfigured striping to add buffered bike lanes and parking lanes in each direction. • Add ladder-style pedestrian crosswalk markings at Hinkley Ave, Olive Ave, Adelbert Ave, Gertrude Ave, Sinclair Ave, Coolidge Ave, Carroll Ave, Dawes Ave, Wagner Ave, Del Mar Ave, Anthony Ave, and Thelma Ave intersections. • Add pedestrian crosswalk striping at the Anteros Ave, Oro Ave, Adrienne Ave, Walker Ave, May Ave, and Walker Ave intersections. • Add ADA curb ramps at all intersection corners. • Add corner curb extensions (bulb-outs) with ADA curb ramps at each corner of the Oro Ave, Gertrude Ave, Wagner Ave, Adrienne Ave, and Walker Ave intersections. • Add a traffic circle at the Carroll Ave intersection. • Storm drain pipe and inlet installation, as necessary to complete the storm drainage network Del Mar Avenue Improvements (Horner Avenue to Washington Street) • New curb, gutter, and sidewalk along the east and west sides of the street. • Add ADA-compliant curb ramps at intersections, as necessary. • Add pedestrian crosswalk striping at the Marsh St and Hobart Ave intersections. Horner Avenue Improvements (Del Mar Avenue to Walker Lane) • New curb, gutter, and sidewalk along the north side of the street. • Add ADA-compliant curb ramps at intersections, as necessary. • Walker Lane Improvements (Horner Avenue to Washington Street) • New curb, gutter, and sidewalk along the east and west sides of the street. • ADA-compliant curb ramps at intersections, as necessary. • Add pedestrian crosswalk striping at the Marsh St and Hobart Ave intersections. Engineering services estimated duration………………………………………...Twelve (12) months
07/27/2026 11:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
SJCDPW-RFP-24-04
San Joaquin County Department of Public Works (SJCDPW) requests technical proposals from qualified consulting firms to undertake, perform, and complete the tasks set forth in Request for Proposals (RFP) – SJCDPW-RFP-24-04. The selected qualified consulting management firm (FIRM) will perform professional services for the Advanced Clean Energy Fleet Transition Assessment Plan (PLAN). The selected consultant will perform analytical and technical services for the proposed PLAN to develop a Zero-Emission Vehicle (ZEV) adoption plan for our fleet to remain in compliance with the California Air Resources Board (CARB), Advanced Clean Fleet regulations (ACF) for government agencies The PLAN will address all vehicles and departments within the San Joaquin County. FIRM will be requested to enter into a Consulting Services Agreement with San Joaquin County (County). All work shall comply with San Joaquin County Policies. The requested professional services shall include, but will not be limited to, the following: • Analyze the current County fleet, ZEV marketplace, and infrastructure • Analyze and identify products within the marketplace that are equitable replacements for existing ICE vehicles • Analyze and identify infrastructure to meet ZEV charging requirements for each location • Develop a plan to introduce ZEVs into San Joaquin County’s fleet and maintain compliance with CARB ACF • Analyze and identify funding sources for ZEVs and infrastructure i.e.: grants, low cost lending, etc. The deadline for submitting technical proposals to SJCDPW will be no later than 4:00 p.m. on Monday, July 15, 2024. SJCDPW’s standard business practice strives to ensure that a consultant’s professional qualifications meet the needs and services to be performed, the payment method is appropriate, and the cost is fair and reasonable to the public agency. A copy of SJCDPW-RFP-24-04 is available to view at the Internet address: https://www.sjgov.org/department/pwk/rfps_and_rfqs and https://www.bidexpress.com . All prospective consultants must register for solicitation No. SJCDPW-RFP-24-04 to be added to the Proposers’ List and, if necessary, receive a Notice of Release of Addendum. It is imperative that prospective consultants check the solicitation Web page often for the status and/or modifications. Alternative arrangements may be made to secure a hard copy of SJCDPW-RFP-24-04 or general questions regarding the solicitation by contacting Mr. Nhan Tran, Management Analyst II, at email address: ntran@sjgov.org .
07/15/2024 11:00 PM UTC
Benjamin Holt Drive Safety Improvements, State Aid Project No. HSIPSL-5929(320)
The work is located at the Intersection of Benjamin Holt Drive and Leesburg Place, west of North Pershing Avenue. The work, in general, consists of installing a pedestrian crosswalk across Benjamin Holt Drive, and adding an additional curb ramp to intercept pedestrians at the northwest corner of the Benjamin Holt Dr/Leesburg PI intersection. Base Estimate Range between $105,000 and $127,000
06/27/2024 08:31 PM UTC
Jahant Road Resurfacing 2024
The work is located north of the City of Lodi, East of State Route 99. The work, in general, consists of repairing and resurfacing approximately 1.80 miles of roadway with asphalt concrete. Base Estimate Range between $575,000 and $710,000
06/27/2024 08:31 PM UTC
Lucerne Avenue and Paradise Avenue Resurfacing
The work, is located North of the City of Tracy. The work, in general, consists of repairing and resurfacing approximately 3.15 miles of existing rural roadways with asphalt concrete. Base Estimate Range between $1,430,000 and $1,750,000
06/27/2024 08:31 PM UTC
Manthey Road and Klo Road Resurfacing
The work is located north of the City of Lathrop and west of Interstate 5. The work, in general, consists of repairing and resurfacing approximately 2.2 miles of roadway with asphalt concrete. Base Estimate Range between $1,407,000 and $1,720,000
06/13/2024 08:31 PM UTC
Lone Tree Road Resurfacing
The work is located south of Mariposa Road and west of Henry Road. The work, in general, consists of repairing and resurfacing approximately 2.0 miles of roadway with asphalt concrete. Base Estimate Range between $850,000 and $1,050,000
06/13/2024 08:31 PM UTC
South 99 Frontage Road East Resurfacing 2024
The work is located east of the State Route 99 and south of Austin Road. The work, in general, consists of repairing and resurfacing approximately 2 miles of roadway with asphalt concrete. Base Estimate Range between $632,000 and $745,000
06/13/2024 08:31 PM UTC
Thornton Road Resurfacing 2024
The work is located west of Lodi on Thornton Road from Devries Road to 1,270' south of De Broggi Road. The work, in general, consists of repairing and resurfacing approximately 3.3 miles of roadway with asphalt concrete. Base Estimate Range between $1,297,302 and $1,466,853
06/06/2024 08:31 PM UTC
Brady Road Resurfacing 2024
The work is located south of the City of Manteca The work, in general, consists of repairing and resurfacing approximately 0.99 mile of existing rural roadway with asphalt concrete Base Estimate Range between $480,000 and $590,000
06/06/2024 08:31 PM UTC
East Country Club Reconstruction, Phase 4
The work is located in the Country Club area of unincorporated Stockton. The work, in general, consists of reconstructing 0.4 mile of existing pavement, curb, gutter and sidewalk. Base Estimate Range between $1,260,000 and $1,540,000
06/06/2024 08:31 PM UTC
101 - 110 of 303 Solicitations
1 2 7 8 9 11 13 14 15 30 31