General Info

Business Logo

Lapeer County Road Commission

820 Davis Lake Road, Lapeer, MI 48446
(810) 664-6272

Our goal is to serve Lapeer County by maintaining all county roads, bridges, and culverts within our jurisdiction to provide convenience and safety for the public. 

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Scotch Settlement Road Ditching
Scotch Settlement Road Ditching including but not limited to: road cross culvert replacement, driveway culvert replacement, restoration and related work.
07/31/2024 07:00 PM UTC
M-24 _ Burnside Road to M-90
1.01 Miles of hot mix asphalt, fine texture pavt milling and resurfacing, HMA approaches, centerline corrugations and pavement markings on M-24 from Burnside Road Northerly to North Branch Road (M-90) Lapeer County.
08/02/2024 03:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
(12) Tire Repair 01/08/2021 06:00 PM UTC
(13) Roadside Mowing 01/08/2021 06:00 PM UTC
(14) Tree and Brush Removal 01/08/2021 06:00 PM UTC
(15) Bituminous Seal Patch 01/08/2021 06:00 PM UTC
(20) Contracted Services 01/08/2021 06:00 PM UTC
(19) Guardrail 01/08/2021 06:00 PM UTC
Davison Lake Road Culvert over S. Br. of Flint River
The Work consists of furnishing all labor, material, and equipment required for removal of existing structures, installation of a 19 foot by 4 foot precast concrete box culvert, backfill, embankment, earth excavation, aggregate surface cse, guardrail, restoration, and related work as specified.
12/23/2020 06:00 PM UTC
Gardner Road Bridge over S. Br. Flint River
The Work consists of furnishing all labor, material, and equipment required for removal of existing structures, installation of a 23 foot by 7 foot precast concrete box culvert, backfill, embankment, earth excavation, aggregate surface cse, guardrail, restoration, and related work as specified.
12/23/2020 06:00 PM UTC
Barber Road Bridge over S. Br. of Flint River
The Work consists of furnishing all labor, material, and equipment required for removal of existing structures, installation of a 25 foot by 6 foot precast concrete box culvert, backfill, embankment, earth excavation, aggregate surface cse, guardrail, restoration, and related work as specified.
12/23/2020 06:00 PM UTC
M-24 Overlay over Fostoria Drain
This work shall consist of cold milling and resurfacing within specified limits, a 1.5” HMA overlay, on M-24 over the Fostoria Drain
08/06/2020 02:00 PM UTC
111 - 120 of 163 Solicitations
1 2 8 9 10 12 14 15 16 17