General Info

Business Logo

Lapeer County Road Commission

820 Davis Lake Road, Lapeer, MI 48446
(810) 664-6272

Our goal is to serve Lapeer County by maintaining all county roads, bridges, and culverts within our jurisdiction to provide convenience and safety for the public. 

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Davison Lake Road Culvert over S. Br. of Flint River
The Work consists of furnishing all labor, material, and equipment required for removal of existing structures, installation of a 19 foot by 4 foot precast concrete box culvert, backfill, embankment, earth excavation, aggregate surface cse, guardrail, restoration, and related work as specified.
12/23/2020 06:00 PM UTC
Gardner Road Bridge over S. Br. Flint River
The Work consists of furnishing all labor, material, and equipment required for removal of existing structures, installation of a 23 foot by 7 foot precast concrete box culvert, backfill, embankment, earth excavation, aggregate surface cse, guardrail, restoration, and related work as specified.
12/23/2020 06:00 PM UTC
Barber Road Bridge over S. Br. of Flint River
The Work consists of furnishing all labor, material, and equipment required for removal of existing structures, installation of a 25 foot by 6 foot precast concrete box culvert, backfill, embankment, earth excavation, aggregate surface cse, guardrail, restoration, and related work as specified.
12/23/2020 06:00 PM UTC
M-24 Overlay over Fostoria Drain
This work shall consist of cold milling and resurfacing within specified limits, a 1.5” HMA overlay, on M-24 over the Fostoria Drain
08/06/2020 02:00 PM UTC
Marathon Township - Non-motorized Trail-way
Marathon Township - Non-motorized Trail-way
06/16/2020 02:30 PM UTC
Wedgewood Golfside Condominium No. 2
Overband Crack Seal and Slurry Seal
06/10/2020 02:30 PM UTC
General Squier Road Rehabilitation and Overlay
General Squier Road Rehabilitation and Overlay
06/02/2020 02:30 PM UTC
Barnes Road Rehabilitation & Overlay M-24 Road to Silverwood Road
Engineers Estimate $1.5 Million Barnes Road Rehabilitation & Overlay M-24 Road to Silverwood Road
04/30/2020 02:30 PM UTC
Location 1 Oregon Road Rehabilitation Washburn Road to Elba Road
Location 1 Oregon Road Rehabilitation Washburn Road to Elba Road
04/30/2020 02:30 PM UTC
Location 2 Oregon Road Rehabilitation Elba Road to Indian Road
Location 2 Oregon Road Rehabilitation Elba Road to Indian Road
04/30/2020 02:30 PM UTC
121 - 130 of 167 Solicitations
1 2 9 10 11 13 15 16 17