Nathan L. Jacobson & Associates, Inc.
86 Main Street, Chester, CT 06412
(860) 526-9591
86 Main Street, Chester, CT 06412
(860) 526-9591
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Number | Deadline |
---|---|
Old Saybrook Route 1 and Elm Street Sidewalks
Project consists of concrete sidewalk, curbing, bituminous concrete driveway construction, and minor storm drainage construction.
| 02/14/2023 03:00 PM UTC |
Replacement of Bridge No. 074007, Birch Mill Road over Falls Brook, Lyme, CT
The Project primarily consists of replacing a short span bridge with a single cell precast concrete box culvert.
| 12/22/2022 07:00 PM UTC |
Lake Shore Drive Culvert Replacement
The Project primarily consists of installing precast concrete culvert and channel components, storm drainage, minor water distribution system, and full depth roadway improvements.
| 11/16/2022 04:00 PM UTC |
Town of Marlborough, Connecticut, Stony Brook Drive Storm Drainage Improvements System No. 1 & System No. 4
The Project primarily consists of the installation of approximately 310 linear feet of storm drainage pipe and storm drainage structures for System No. 1 and approximately 560 linear feet of storm drainage pipe and storm drainage structures for System No. 4 and trench pavement and curb placement.
| 08/31/2022 02:00 PM UTC |
Drainage Improvements Park Road and North Main Street Intersection, Marlborough, Connecticut
Project primarily consists of the installation of approximately 100 to 250 linear feet of storm drainage.
| 07/13/2022 06:00 PM UTC |
Main Street Sidewalks (South), Durham, CT
The Project primarily consists of sidewalk construction with minor storm sewer drainage installation.
| 05/03/2022 02:00 PM UTC |
Pickett Lane over Herzig Brook
The Project primarily consists of replacing a single corrugated metal pipe culvert with a single precast concrete rigid frame.
| 12/21/2021 07:00 PM UTC |
Beaver Meadow Road Culvert Replacement, Haddam, CT
The Project generally consists of a culvert replacement with associated road work, drainage and site restoration.
| 12/08/2021 03:00 PM UTC |
Bridge Road Sidewalks, Haddam, Connecticut
The project primarily consists of sidewalk, sight lighting, a retaining wall, and storm drainage construction.
| 12/01/2021 02:00 PM UTC |
Maintenance Dredging of Chester Creek, Chester, CT
The Project primarily consists of dredging material to -6 MLW plus 1 foot allowable over dredge depth over a 500 (+/-)-foot-long by 50-foot-wide project area at the mouth of Chester Creek and disposing of material to a disposal area north of and adjacent to the dredging area.
| 11/12/2021 03:00 PM UTC |