Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
2026-06
2026 Franklin County Guardrail Maintenance Contract Maintenance and upgrade of guardrail along approximately 260 miles of Franklin County highways to enhance roadway safety. ENG ESTIMATE: $673,587.00
04/14/2026 02:00 PM UTC
2025-18
Innis Road, Cleveland Avenue to Westerville Road, PID 117425 SBE Goal = 6% This project consists of reconfiguring Innis Road from 4-lanes to 3-lanes with a two-way left turn lane and buffered bike lanes. This project will also complete sidewalk gaps on the north and south sides of Innis Road and install two enhanced mid-block crossings across Innis Road. Engineer's Estimate: $1,110,605.11
04/21/2026 02:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
2026-01
2026 Franklin County and Township Resurfacing Upgrading various sections of Franklin County roadways, and Township roadways with asphalt resurfacing, aggregate berm material, curb, and sidewalk replacement. ENGINEER'S ESTIMATE = $5,530,059.40 There is no EBE goal for this project.
03/31/2026 02:00 PM UTC
2026-04
CDBG 2023 Chambers Rd and Westbrook Subdivision Improvements Construction of 900 feet of concrete sidewalk along the north and south sides of Chambers Road, along with associated work. Construction of 4,100 feet of concrete sidewalk along both sides of the road within the western section of the Westbrook Subdivision, along with associated work. ENG ESTIMATE = $1,334,493.75 A Pre-Bid conference will be held virtually via Microsoft Teams on Wednesday March 4, 2026, at 10:00 a.m. Meeting ID: 271 507 721 661 8 Passcode: rw7mv6JW The plans, profiles, specifications, and estimates of quantities for doing this work are available through the www.bidexpress.com webservice for inspection by interested parties.
03/17/2026 02:00 PM UTC
2026-02
CDBG Genessee Avenue Drainage Improvements from Parkwood Avenue to Perdue Avenue This project includes the installation of appx. 620 LF of storm sewer pipe, demolition of existing storm sewer structures within the Right of Way of Genessee Avenue and an alley to connect to the existing Earl Avenue storm sewer system. All disturbed areas will be restored including road pavements and vegetated areas. ENG ESTIMATE = $330,000.00 An optional Pre-Bid conference will be held virtually via Microsoft Teams on February 18, 2026, at 10:00 a.m. Meeting ID: 224 453 305 505 72; Passcode: QM7L5XR3. The plans, profiles, specifications, and estimates of quantities for doing this work are available through the www.bidexpress.com webservice for inspection by interested parties
03/03/2026 03:00 PM UTC
2025-19
Safe Routes To School 2023 (FRA-SRTS SW City Schools), PID 120034 SBE Goal = 5% This project will construct improvements at two intersections, including an intersection speed table with Rectangular Rapid Flashing Beacons, a Pedestrian Hybrid Beacon, and sidewalk to provide connectivity to Prairie Lincoln Elementary, Prairie Norton Elementary, and Norton Middle School. Engineer's Estimate: $456,000.00
02/17/2026 03:00 PM UTC
2025-16
Zuber Road Plum Run Drainage Improvements Sections 2 & 3 This project consists of 8,206 linear feet of drainage ditch improvement, profile grade restoration, and culvert replacements. ENG ESTIMATE = $2,300,000.00
01/29/2026 03:00 PM UTC
2025-15
East Cooke Road (Karl Road to Cleveland Avenue) FRA-CR80-2.67 - PID 115411 This project includes the full depth reconstruction of 1.02 miles of East Cooke Road, from Karl Road to Cleveland Avenue. This project will also construct curb and gutter, a 10' wide asphalt shared-use path, a 5' wide concrete sidewalk, storm sewer improvements, and highway lighting from Walford Street to Cleveland Avenue. ENGINEER'S ESTIMATE = $6,902,079.47 THERE IS NO DBE GOAL ON THIS PROJECT IN ACCORDANCE WITH NEW FEDERAL REQUIREMENTS.
11/18/2025 03:00 PM UTC
2025-17
2026 Franklin County Traffic Signal Maintenance Contract On-call maintenance of electronic traffic control equipment within unincorporated Franklin County, Ohio. ENGINEER'S ESTIMATE: $722,466.00
10/28/2025 02:00 PM UTC
2025-14
Frank Rd at Brown Rd and Hardy Parkway Street Roundabouts This project consists of converting the existing signalized intersection of Frank Road at Hardy Parkway Street – Brown Road (CR 142) to a 2x1 roundabout. The project will also convert the existing tee intersection of Frank Road at Brown Road (TR 142) to a 2x1 roundabout. The reconfiguration of these intersections will include drainage, street lighting, and pedestrian improvements. ENG ESTIMATE = $8,782,879.92 DBE Goal = 8%
09/30/2025 02:00 PM UTC
2025-08
Rohr Rd (Bixby Rd to Shook Rd) This project consists of widening 1.03 miles of Rohr Road to provide left turn lanes at Bixby Road and Creekside Parkway and includes the addition of a two-way left turn lane from Creekside Parkway to a point 375' from the intersection of Shook Road and Rohr Road. Improvements include full depth pavement replacement and widening, curb and gutter, guardrail, storm sewer, drainage, and traffic control. ENG ESTIMATE = $4,175,800.23, EBE Goal 8%
08/26/2025 02:00 PM UTC
2025-13
Walnut St at SR-605 (New Albany-Condit Rd) Roundabout This project will improve the existing and deficient offset intersection geometry by improving 0.26 miles of New Albany-Condit Road (SR 605) and 0.19 miles of Walnut Street (CR-19) by constructing a modern 2x1 multi-lane roundabout. The project also includes the installation of a culvert replacement, closed storm sewer system, street lighting. Shared-use path, and various other improvements. ENG ESTIMATE (Base Bid + Alternate Items) = $4,944,144 EBE Goal 8% The apparent low bidder will be determined by summing the total cost of all base bid and alternate bid items together. The apparent low bidder will then be posted here on Bid Express. Determination on whether to accept the alternate bid items and non-perform the base bid items will occur prior to project award (anticipated to be 9/16/25).
07/29/2025 02:00 PM UTC