General Info

Business Logo

Franklin County Engineer's Office

970 Dublin Rd, Columbus , OH 43215
(614) 525-3030

Adam W. Fowler, P.E., P.S.
    Franklin County Engineer

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
2022-12
Zuber Road Plum Run Drainage Improvements Section 1 EBE Goal = 8% This project consists of 2,576 linear feet of drainage ditch improvements and profile grade restoration to address impairment by sediment deposition and allow major flood routing to function properly. ENG ESTIMATE = $409,119.50
04/01/2025 02:00 PM UTC
2024-06
Cosgray Road (CR-39) & Faust Ditch Drainage Improvements EBE Goal = 5% Improving 2,628' of storm sewer along Cosgray Road, from the intersection of Cosgray Road and Rings Road to Faust Ditch. ENG ESTIMATE = $1,265,000.00
03/18/2025 06:00 PM UTC
2025-06
2025 Franklin County Resurfacing Program EBE Goal = 8% Upgrading 4.918 miles of various sections of Franklin County roadways. Engineer's Estimate = $2,973,479.80
03/18/2025 02:00 PM UTC
2025-03
West North Broadway 1.18 over Olentangy River (CLI-CR333-1.18), PID 121403 DBE = 8% Rehabilitating the West North Broadway 1.18 Bridge over the Olentangy River by applying a variable thickness overlay and installing a concrete barrier to provide a shared use path on the south side of the bridge and sidewalk on the north side of the bridge. Other work includes converting the abutments to semi-integral, replacing bearings and approach slabs, and upgrading the existing wingwalls. ENG ESTIMATE = $2,161,181.45
03/04/2025 03:00 PM UTC
2025-04
Frank Road at Brown Road/Hardy Parkway Street & Brown Road MELP Relocation Relocating existing City of Columbus MELP (Municipal Electric Light Plant) facilities to new poles in advance of the construction of the Frank Road at Brown Road/Hardy Parkway Street & Brown Road (Township) Roundabouts Improvement Project. Engineer's Estimate = $544,478.00
02/18/2025 03:00 PM UTC
2024-14
Eiterman Road 0.75 over South Fork Indian Run (WAS-CR41-0.75): Perform a complete bridge replacement of the existing Eiterman Road 0.75 structure over South Fork Indian Run along with other incidentals to complete the project in Franklin County, Ohio. Extend the existing footprint to accommodate the future build-out of Dublin’s thoroughfare plan. EBE Goal = 6% ENG ESTIMATE = $1,071,000
01/21/2025 03:00 PM UTC
2024-04
Renner Road (Alton & Darby Creek Road to Spindler Road) This project consists of 0.75 miles of asphalt pavement widening and resurfacing of Renner Road between Alton & Darby Creek Road and Spindler Road. Improvements include earthwork, storm sewer, shared-use path, sidewalk, traffic signal, traffic control devices, and the replacement of the existing bridge over Clover Groff Ditch. ENGINEER'S ESTIMATE = $5,765,781.00
10/29/2024 02:00 PM UTC
2024-03
Part 1 Widening of Cleveland Ave between Elmore Ave and Melrose Ave, signal modifications at Huy Rd and Elmore Ave, construction of concrete medians between Huy Rd and Cooke Rd including crosswalks and RRFB's, lane modifications, resurfacing, and lighting improvements on Cleveland Ave from Huy Rd. to Cooke Rd, and resurfacing on Innis Rd. for 400 feet with a proposed concrete median to control access. Part 2 Provide crosswalk improvements at Cleveland Ave at Dunedin Rd and Cleveland Ave at Piedmont Rd/Dunbar Dr. Crosswalk improvements will include installation of mast arm mounted, overhead Pedestrian Crossing Warning Signs with solar powered Rectangular Rapid Flashing Beacons (RRFB’s), and pedestrian refuge islands. DBE Percentage = 8% Engineer's Estimate = $4,607,522.54
07/02/2024 02:00 PM UTC
2024-08
Trabue Road over Scioto River (FRA-CR27-10.77) & Trabue Road over Scioto Pointe Drive (FRA-CR27-10.89) PID 105759 - Re-Bid DBE Goal: 10% Upgrading 0.285 miles of Trabue Road by rehabilitating and widening of bridges FRA-CR27-10.77 over the Scioto River and FRA-CR27-10.89 over Scioto Pointe Drive. Proposed work includes replacement of the decks with composite reinforced concrete decks, new approach slabs, semi-integral abutment conversion, parapets, sidewalks, shared-use path, and resurfacing of Trabue Road. Engineer's Estimate: $14,420,295.53 Revised Substantial Completion Date: October 31, 2026 Revised Final Completion Date: November 30, 2026
05/28/2024 02:00 PM UTC
2024-02
Alkire Road at Demorest Road Storm Sewer Replacement EBE Goal = 10% Remove and replace approximately 500 feet of existing storm sewer pipe (structures are to remain in place) at the intersection of Alkire Road and Demorest Road, including all associated pavement restoration. Improve roundabout center island landscaping by placing river stone and sandstone blocks. Engineer's Estimate = $374,668.29
05/21/2024 06:00 PM UTC
11 - 20 of 109 Solicitations
2 4 5 6 7 8 9 10 11