Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
2024-14
Eiterman Road 0.75 over South Fork Indian Run (WAS-CR41-0.75): Perform a complete bridge replacement of the existing Eiterman Road 0.75 structure over South Fork Indian Run along with other incidentals to complete the project in Franklin County, Ohio. Extend the existing footprint to accommodate the future build-out of Dublin’s thoroughfare plan. EBE Goal = 6% ENG ESTIMATE = $1,071,000
01/21/2025 03:00 PM UTC
2024-04
Renner Road (Alton & Darby Creek Road to Spindler Road) This project consists of 0.75 miles of asphalt pavement widening and resurfacing of Renner Road between Alton & Darby Creek Road and Spindler Road. Improvements include earthwork, storm sewer, shared-use path, sidewalk, traffic signal, traffic control devices, and the replacement of the existing bridge over Clover Groff Ditch. ENGINEER'S ESTIMATE = $5,765,781.00
10/29/2024 02:00 PM UTC
2024-03
Part 1 Widening of Cleveland Ave between Elmore Ave and Melrose Ave, signal modifications at Huy Rd and Elmore Ave, construction of concrete medians between Huy Rd and Cooke Rd including crosswalks and RRFB's, lane modifications, resurfacing, and lighting improvements on Cleveland Ave from Huy Rd. to Cooke Rd, and resurfacing on Innis Rd. for 400 feet with a proposed concrete median to control access. Part 2 Provide crosswalk improvements at Cleveland Ave at Dunedin Rd and Cleveland Ave at Piedmont Rd/Dunbar Dr. Crosswalk improvements will include installation of mast arm mounted, overhead Pedestrian Crossing Warning Signs with solar powered Rectangular Rapid Flashing Beacons (RRFB’s), and pedestrian refuge islands. DBE Percentage = 8% Engineer's Estimate = $4,607,522.54
07/02/2024 02:00 PM UTC
2024-08
Trabue Road over Scioto River (FRA-CR27-10.77) & Trabue Road over Scioto Pointe Drive (FRA-CR27-10.89) PID 105759 - Re-Bid DBE Goal: 10% Upgrading 0.285 miles of Trabue Road by rehabilitating and widening of bridges FRA-CR27-10.77 over the Scioto River and FRA-CR27-10.89 over Scioto Pointe Drive. Proposed work includes replacement of the decks with composite reinforced concrete decks, new approach slabs, semi-integral abutment conversion, parapets, sidewalks, shared-use path, and resurfacing of Trabue Road. Engineer's Estimate: $14,420,295.53 Revised Substantial Completion Date: October 31, 2026 Revised Final Completion Date: November 30, 2026
05/28/2024 02:00 PM UTC
2024-02
Alkire Road at Demorest Road Storm Sewer Replacement EBE Goal = 10% Remove and replace approximately 500 feet of existing storm sewer pipe (structures are to remain in place) at the intersection of Alkire Road and Demorest Road, including all associated pavement restoration. Improve roundabout center island landscaping by placing river stone and sandstone blocks. Engineer's Estimate = $374,668.29
05/21/2024 06:00 PM UTC
2024-09
Norwich Township Safety Services Building Pavement Improvement. EBE Goal 8% The project includes removal and replacement of a portion of the concrete parking lot and driveway at the Norwich Township Safety Services Building. Engineer's Estimate = $300,000
05/14/2024 06:00 PM UTC
2024-10
Franklin County Township Resurfacing Program DBE Goal 8% Upgrading various sections of Franklin County Township roadways, detailed within; with asphalt resurfacing and aggregate berm material. Engineer's Estimate $6,527,880.15
05/02/2024 06:00 PM UTC
2024-08
Trabue Road over Scioto River (FRA-CR27-10.77) & Trabue Road over Scioto Pointe Drive (FRA-CR27-10.89) PID 105759 - DBE Goal: 10% Upgrading 0.285 miles of Trabue Road by rehabilitating and widening of bridges FRA-CR27-10.77 over the Scioto River and FRA-CR27-10.89 over Scioto Pointe Drive. Proposed work includes replacement of the decks with composite reinforced concrete decks, new approach slabs, semi-integral abutment conversion, parapets, sidewalks, shared-use path, and resurfacing of Trabue Road. Engineer's Estimate: $12,094,232.06
04/30/2024 02:00 PM UTC
2024-01
Clouse Road Drainage Improvement (Plain Township) The project includes drainage improvements within the public right of way on Clouse Road in Plain Township, Franklin County, Ohio. These improvements include the installation of 1,100 feet of new storm sewer conduit and structures, ditch grading, and miscellaneous drainage improvements that are tributary to Blacklick Creek. Engineer's Estimate = $444,909.00. EBE Goal = 8%.
04/16/2024 06:00 PM UTC
2024-07
Upgrading 5.104 miles of various sections of Franklin County roadways with asphalt resurfacing and aggregate berm material.
03/19/2024 06:00 PM UTC
21 - 30 of 114 Solicitations